57-59 Cherry Orchard Industrial Estate, Dublin 10
GrantedPlanning application S99A/0519
Dublin - South Dublin County Council
Proposed Development
Extensions and alteration to existing Production Premises at 57-59 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10. This shall include an extension of 600m2 for delivery and goods store, silo for wood dust storage, modification of existing single storey offices to two storey structure incorporating an additional 640m2 of office and showrooom accomodation, refurbishment of facing cladding to existing structures and upgrading of parking, marshalling and landscaped areas including additional screen walls and railings to rear of site.
View the full application file on the council's planning portal →Application Timeline
Application received
29 Jul 1999
Decision due
27 Sept 1999
Decision: Grant Permission
27 Sept 1999
Grant issued
9 Nov 1999
Application Details
- Location
- 57-59 Cherry Orchard Industrial Estate, Dublin 10.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 11250 ha
- Floor Area
- 1240 sq m
Timeline
- Registration Date
- 29 July 1999
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 27 September 1999
- Grant Date
- 9 November 1999
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
For the erection of 2.2m high steel security palisade fence around the full perimeter of the site and the forming of a new loading bay door opening with steel roller shutter door to the side elevation.
Unit, 82, Cherry Orchard Industrial Estate, Dublin, 10
Construction of extension to existing warehouse premises; erection of 2.4m high palisade fencing including entrance gates to front boundary.
Unit 78, Cherry Orchard Industrial Estate, Ballyfermot Road, Ballyfermot, Dublin 10
Modifications to No. 60 consisting of internal access to No. 61; 2 new windows to rear and fire escape stair on first floor; change of use on ground floor of No. 61 from furniture storage to kitchen and food production/storage area.
60/61, Cherry Orchard Industrial Estate, Dublin 10
Confirm that internal fit out works to the building are exempted development.
Unit 64 & 65, Cherry Orchard Industrial Estate, Palmerstown
Two storey extension to existing dwelling comprising study and lounge on ground floor and two no. bedrooms on first floor.
10 Palmers Park, Palmerstown Manor, Palmerstown, Dublin 20.
Demolition of an existing warehouse / factory building and the construction of a residential development of 144 apartments with supporting tenant amenity facilities (gym and activity areas, lounges and meeting room), employment uses including 2 incubator units and a remote working space, building management facilities and all ancillary site development works. The proposed development includes 72 1-bedroom apartment and 72 2-bedroom apartments to be provided as follows: Building A (35 1-bedroom & 24 2-bedroom over 5-9 storeys), Building B (7 1-bedroom & 10 2-bedroom over 3-4-storeys), Building C (16 1-bedroom, 19 2-bedroom over 5-storeys), Building D (14 1-bedroom & 19 2-bedroom over 4-5-storeys). Vehicular access to the proposed development will be provided via an entrance from the existing estate road as accessed from Kennelsfort Road Upper. The proposal includes improvement works on the northern side of the junction at the estate road/Kennelsfort Road Upper, new pedestrian/cycle paths on the estate road to the south of the site, and provision of a controlled pedestrian crossing on Kennelsfort Road Upper to the west as part of enabling infrastructure. The proposed development provides for outdoor amenity areas, landscaping, external podium lift, under-podium and street car parking, bicycle parking, bin stores, ESB substation, public lighting, roof mounted solar panels and all ancillary site development works.
Units 64 &65, Cherry Orchard Industrial Estate and Kennelsfort Road Upper, Palmerstown, Dublin 10
The development will consist of: the demolition of an existing warehouse / factory building and the construction of a residential development of 127 no. apartments with supporting tenant amenity facilities (gym and activity areas, lounges and meeting rooms), employment uses comprising 3 no. incubator units, building management facilities and all ancillary site development works. The proposed development includes 55 no. 1-bedroom apartments, 41 no. 2-bedroom apartments and 31 no. 3-bedroom apartments to be provided as follows: Building A (25 no. 1-bedroom, 13 no. 2-bedroom & 11 no. 3-bedroom over 5-8 storeys), Building B (9 no. 1-bedroom & 8 no. 2-bedroom over 3-4-storeys), Building C (8 no. 1-bedroom, 10 no. 2-bedroom & 13 no. 3-bedroom over 5-storeys), Building D (13 no. 1-bedroom, 10 no. 2-bedroom & 7 no. 3-bedroom over 4-5-storeys). Vehicular access to the proposed development will be provided via an entrance from the existing estate road as accessed from Kennelsfort Road Upper. The proposal includes improvement works on the northern side of the junction at the estate road/Kennelsfort Road Upper, new pedestrian/cycle paths on Kennelsfort Road Upper and on the estate road to the south of the site, and provision of a controlled pedestrian crossing on Kennelsfort Road Upper to the west as part of enabling infrastructure. The proposed development provides for outdoor amenity areas, landscaping, external podium lift, under-podium and street car parking, bicycle parking, bin stores, ESB substation, public lighting, roof mounted solar panels and all ancillary site development works.
Units 64 & 65, Cherry Orchard Industrial Estate and Kennelsfort Road Upper, Palmerstown, Dublin 10 D10 E330
Retain as erected 2 advertising billboards.
64/65 Cherryorchard Industrial Estate, Ballyfermot, Dublin 10.
Retain the following unapproved items: (1) One no. velux window to both front and rear sections of main roof structure. (2) Attic conversion in existing roof structure. (3) Internal alteration to accommodate the above two items.
9 Palmers Park, Palmerstown Manor, Palmerstown, Dublin 20.
The development will consist of the following works: construction of two storey extensions to the front of the existing buildings, remodelling of existing front and rear facades, provision of attached canopies, provision of attached illuminated signage, remodelling of existing parking areas, associated drainage and ancillary works.
Unit 83, Cherry Orchard Industrial Estate, Dublin 10
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?