Turnpike Lane, Ballymount, Dublin 22
GrantedPlanning application S99A/0792
Dublin - South Dublin County Council
Proposed Development
New openings in existing warehouse walls at ground and first floor.
View the full application file on the council's planning portal →Application Timeline
Application received
10 Nov 1999
Decision: Grant Permission
22 Dec 1999
Decision due
3 Jan 2000
Grant issued
4 Feb 2000
Application Details
- Location
- Turnpike Lane, Ballymount, Dublin 22.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 3182 ha
- Floor Area
- 1845 sq m
Timeline
- Registration Date
- 10 November 1999
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 22 December 1999
- Grant Date
- 4 February 2000
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
An ESB Sub Station with switch room and all associated site works.
Unit 2, Ballymount Cross Industrial Estate, Ballymount, Dublin 24
Retain sub-divison of the unit into 2 units.
Unit D, Turnpike Industrial Estate, Turnpike Road, Clondalkin, Dublin 22.
Extension to existing industrial unit.
1a Turnpike Lane, Ballymount Cross, Dublin 12.
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
Unit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74
An ESB substation building of approx. 4.5m (W) 5m (L) and 2.9m (H) only. The substation building will be block built with a plastered finish and a flat concrete roof.
Unit 2, Block K, Ballymount Industrial Estate, Dublin 24
Conversion of first floor to office use and new side entrance.
Unit D1, Ballymount Cross Industrial Estate, Dubli
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
Units 5,6,7,8,9, Turnpike Business Park, Turnpike Lane, Ballymount, Dublin 22
Internal extension of floorplates and amalgamation of units 5, 6, 7, 8 and 9 and their change of use from light industrial to create a two storey office based industry unit of 1,520sq.m within the overall Turnpike Business Park development; Retention for the amalgamation of units 5, 6, and 7 that includes the retention of the internal extension of the original mezzanine floor to create a first floor level above the entire ground floor of these units and change of use of these units at ground and first floor level from light industrial to office based industry (910sq.m overall). Permission for the demolition of the first floor (281sq.m) within units 8 and 9 and the construction of a new first floor (305sq.m) above the entire ground floor of these units and the change of use of these units at ground and first floor level from light industrial to office based industry (610sq.m); Permission is also sought for changes to the car parking layout that will reduce the car parking spaces from 65 to 64 car parking spaces with vehicular access off Turnpike Road with a new gated access at the entrance into the car park; sheltered bicycle parking will be provided to serve the development; elevation changes and signage that include a new projecting sign (7.3sq.m) to the north of the east elevation and alteration of individual doors and shutter doors to windows on both the north and south elevation; new windows to both the north, west and south elevation at first floor level; all site and ancillary development works required to facilitate the development.
Turnpike Business Park, Turnpike Road, Ballymount, Dublin 22
Retention of a single storey lean-to workshop extension to the side of the existing workshop.
Astra Pumps & Plant Ltd, Turnpike Industrial Estate, Dublin 22
Erect a 4.525m high stand alone advertisement sign, all ancillary site works.
Turnpike Lane, Turnpike Road, Ballymount, Dublin 22
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?