← Back to search

Turnpike Lane, Ballymount, Dublin 22

Granted

Planning application S99A/0792

Dublin - South Dublin County Council

Proposed Development

New openings in existing warehouse walls at ground and first floor.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Nov 1999

  2. Decision: Grant Permission

    22 Dec 1999

  3. Decision due

    3 Jan 2000

  4. Grant issued

    4 Feb 2000

Application Details

Location
Turnpike Lane, Ballymount, Dublin 22.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
3182 ha
Floor Area
1845 sq m

Timeline

Registration Date
10 November 1999
Status
Decision
Decision
Grant Permission
Decision Date
22 December 1999
Grant Date
4 February 2000

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
SD08A/0131Granted28 Feb 2008

An ESB Sub Station with switch room and all associated site works.

Unit 2, Ballymount Cross Industrial Estate, Ballymount, Dublin 24

50m
S99A/0669Granted13 Sept 1999

Retain sub-divison of the unit into 2 units.

Unit D, Turnpike Industrial Estate, Turnpike Road, Clondalkin, Dublin 22.

55m
S00A/0093Granted17 Feb 2000

Extension to existing industrial unit.

1a Turnpike Lane, Ballymount Cross, Dublin 12.

58m
SD25A/0125WGrant Permission & Grant Retention19 Aug 2025

Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.

Unit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74

68m
SD19A/0249Invalid Application7 Aug 2019

An ESB substation building of approx. 4.5m (W) 5m (L) and 2.9m (H) only. The substation building will be block built with a plastered finish and a flat concrete roof.

Unit 2, Block K, Ballymount Industrial Estate, Dublin 24

73m
S01A/0637Granted27 Sept 2001

Conversion of first floor to office use and new side entrance.

Unit D1, Ballymount Cross Industrial Estate, Dubli

79m
SD20A/0302Granted23 Nov 2020

Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.

Units 5,6,7,8,9, Turnpike Business Park, Turnpike Lane, Ballymount, Dublin 22

79m
SD19A/0070Grant Permission & Grant Retention13 Jun 2019

Internal extension of floorplates and amalgamation of units 5, 6, 7, 8 and 9 and their change of use from light industrial to create a two storey office based industry unit of 1,520sq.m within the overall Turnpike Business Park development; Retention for the amalgamation of units 5, 6, and 7 that includes the retention of the internal extension of the original mezzanine floor to create a first floor level above the entire ground floor of these units and change of use of these units at ground and first floor level from light industrial to office based industry (910sq.m overall). Permission for the demolition of the first floor (281sq.m) within units 8 and 9 and the construction of a new first floor (305sq.m) above the entire ground floor of these units and the change of use of these units at ground and first floor level from light industrial to office based industry (610sq.m); Permission is also sought for changes to the car parking layout that will reduce the car parking spaces from 65 to 64 car parking spaces with vehicular access off Turnpike Road with a new gated access at the entrance into the car park; sheltered bicycle parking will be provided to serve the development; elevation changes and signage that include a new projecting sign (7.3sq.m) to the north of the east elevation and alteration of individual doors and shutter doors to windows on both the north and south elevation; new windows to both the north, west and south elevation at first floor level; all site and ancillary development works required to facilitate the development.

Turnpike Business Park, Turnpike Road, Ballymount, Dublin 22

80m
SD04A/0085Grant Permission for Retention4 Feb 2004

Retention of a single storey lean-to workshop extension to the side of the existing workshop.

Astra Pumps & Plant Ltd, Turnpike Industrial Estate, Dublin 22

80m
SD12A/0067Granted11 Sept 2012

Erect a 4.525m high stand alone advertisement sign, all ancillary site works.

Turnpike Lane, Turnpike Road, Ballymount, Dublin 22

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?