← Back to search

Units 9 & 11, Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

Granted

Planning application SD02A/0739

Dublin - South Dublin County Council

Proposed Development

Change of use from enterprise incubation units to temporary childcare facilities and for the retention and completion of works which include the division of two units to comprise two ancillary offices, a kitchen, one changing area and three childcare rooms, external play area to rear.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Dec 2002

  2. Decision due

    5 Feb 2003

  3. Decision: Grant Permission

    7 Feb 2003

  4. Grant issued

    21 Mar 2003

Application Details

Location
Units 9 & 11, Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
11327 ha
Floor Area
133 sq m

Timeline

Registration Date
11 December 2002
Status
Decision
Decision
Grant Permission
Decision Date
7 February 2003
Grant Date
21 March 2003

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
SD24A/0292WWithdraw the Application26 Nov 2025

Partas intend to apply for permission for development on lands at Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24. The development will consist of an aerial delivery hub consisting of 1 no. single storey storage and ancillary office cabin container, boundary treatments in the form of perimeter fencing, and all associated site works necessary to facilitate the development.

Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

32m
SD16A/0260Invalid Application21 Jul 2016

Retention of the material change of use from light industrial to use as a gym (floor area c.67sq.m.) and retention of advertisment signage to front elevation with text referring to Darren Murray, Personal Training, including contact details, logo and details of services (c.5.5sq.m).

Unit 8, Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

32m
SD16A/0399Grant Permission for Retention18 Nov 2016

Retention of the material change of use from light industrial to use as a gym (floor area c.67sq.m) and retention of advertisement signage to front elevation with text referring to Darren Murray Personal Training, including contact details, logo and details of services (c.5.5sq.m).

Unit 8, Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

34m
SD23A/0337Granted9 Apr 2024

Renovate and extend part of the existing single and two storey enterprise centre (existing gross floor area: 2,379 sq.m.) to create a food and beverage enterprise centre to be called Priory Market including (i) a single storey extension (114 sq.m) on the west (side) elevation; a two storey extension (290 sq.m) on the east (side) elevation, 2 new mezzanine areas (51 sq.m and 19 sq.m); a new disability accessible toilet at first floor level; plant area at roof level (overall proposed gross floor area: 2,853 sq.m); (ii) the open plan market area will comprise 12 vendor stalls with unreserved seating and tables, extended and reconfigured toilets, a shared kitchen area (123 sq.m), a dishwasher room, etc., and a bar area ancillary to the existing Priory Brewery (that will be extended internally by 50 sq.m); (iii) a new entrance door at the northern elevation with existing entrance replaced by a window; (iv) optional solar panels on the roof; (v) revisions to the existing surface level car park to provide for 37 car parking spaces, 3 mobility impaired spaces, and 10 electric vehicle charging point spaces, and 66 bicycle spaces; (vi) revisions to the existing vehicular entrance at Main Road to provide for a new pathway; (vii) 8 Priory Market signs as follows; 1 double sided sign (1400 x 2000 mm) within the existing freestanding Bryan S Ryan sign; 2 signs (1000 x 5600 mm each) at the site entrance wing walls, 3 freestanding flag type signs (1700 x 700 mm each) with an overall height of 3.9 metres; 1 no. freestanding sign (1400 x 7000 mm) on a support frame with an overall height of 4.4 metres; and hand painted sign (1600 x c. 38000 mm) below eaves level across the rear elevation; and (viii) landscaping and ancillary site development works.

Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

37m
SD25A/0236WGranted24 Sept 2025

A solar panel canopy to outdoor seating area at the west side/front of Priory Market

Priory Market, Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

54m
SD17A/0009Granted2 Jun 2017

Ancillary multi deck car park to service the existing headquarters office of LIDL Ireland GmbH and the wider retail campus. The development also includes an underground pedestrian link between the proposed car park and the LIDL headquarters building, linking to the existing basement car park. The external parking area immediately east of the office building, containing a single row of parking spaces, is to be replaced with a dedicated, landscaped, outdoor area for use by LIDL staff and visitors. The development includes all hard and soft landscaping, ancillary site development works, including all underground works for drainage and other associated works.

Lidl Head Office, Main Road, Tallaght, Dublin, 24

65m
SD07A/0331Grant Permission & Grant Retention8 May 2007

(a) Retention of change of use of light industrial premises to offices and educational use; (b) change of use of light industrial premises to offices and educational use (in a section adjoining A above).

Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

68m
SD06A/0158Granted5 May 2006

Two semi-detached two-storey, two-bed dwellings at the rear.

9, Newtown Park, Tallaght, Dublin 24.

83m
SD15A/0144Grant Permission & Grant Retention29 May 2015

Retention and continuance of use of conversion of previously approved dormer bungalow (S94A/0309) to 3 no. 1 bed apartments, including new gated entrance avenue and domestic garage, together with permission for internal revisions to the bungalow.

11 Newtown Park, Tallaght, Dublin 24.

83m
SD15A/0016Refuse Permission for Retention26 Jan 2015

Retention and continuance of use of conversion of previously approved dormer bungalow (S94A/0309) to 3 apartments, consisting of 2 no. 1 bed apartments at ground floor and 1 no. 2 bed apartment at 1st floor; new gated entrance avenue and domestic garage.

11, Newtown Park, Dublin 24.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?