← Back to search

Unit 5c, Robinhood Industrial Estate, Dublin 22

Granted

Planning application SD03A/0112

Dublin - South Dublin County Council

Proposed Development

Construct a carpet showroom and furniture store along with associated offices, stores, car parking and site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    15 Apr 2003

  2. Further information received

    29 May 2003

  3. Application received

    23 Jul 2003

  4. Decision due

    19 Aug 2003

  5. Decision: Grant Permission

    19 Aug 2003

  6. Grant issued

    9 Oct 2003

Application Details

Location
Unit 5c, Robinhood Industrial Estate, Dublin 22
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
2060 ha
Floor Area
990 sq m

Timeline

Registration Date
23 July 2003
Status
Decision
Decision
Grant Permission
Decision Date
19 August 2003
Grant Date
9 October 2003

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
SD20A/0085Granted26 Mar 2020

Sud-division of unit previously granted planning permission under planning Ref. SD16A/0065 into two separate units; minor internal alterations to layout of the previous grant.

33 Robinhood Industrial Estate, Clondalkin, Dublin 22.

34m
SD07A/0906Withdraw the Application14 Nov 2007

Retention for alterations to warehouse previously granted under planning Ref. S01A/0115 as follows; (a) retain advertising signage to front and side elevations; (b) alterations to two number entrances to front elevation; (c) additional roller shutter doors to side and front elevation; (d) blocking up 4 no. windows to ground floor front elevation, and all associated site works and services.

33, Robinhood Industrial Estate, Clondalkin, Dublin 22

34m
S00A/0244Refused18 Sept 2000

A 592 sq.m. warehouse extension and a 68 sq.m. proposed offices within existing 871 sq.m. warehouse, to include wall cladding to existing building and a 1.8m high palisade fence to north boundary and all associated site works.

33 Robinhood Industrial Estate, Clondalkin, Dublin 22.

34m
SD16A/0065Grant Permission & Grant Retention27 May 2016

(1) Reversion of entire warehouse premises with ancillary offices and rooms to one unit in lieu of already approved five units under planning Reg. Ref. SD08A/0043; (2) Removal of offices on mezzanine level to front and reversion to storage as approved; (3) Provision of new fire escape door to side at bottom of stairs serving first floor offices to front. (4) Removal of internal doors and partitians to rear to allow access to the units from main warehouse and to allow access to fire escape doors to rear; (5) Retention sought for small section of rear extension which conflicts with approved extension under planning Reg. Ref. S01A/0115.

33 Robinhood Industrial Estate, Clondalkin, Dublin 22.

34m
SD08A/0043Grant Permission for Retention22 Jan 2008

Retention for alterations to warehouse previously granted under planning reference number S01A/0115 as follows: (a) retain advertising signage to front and side elevations; (b) alterations to two number entrances to front elevation; (c) additional roller shutter doors to side and front elevation; (d) blocking up 4 no. windows to ground floor elevation; (e) retention of mezzanine floor (675.08sq.m.); (f) retention of boundary fence are constructed; (g) retention of subdivision of unit into 5 number of occupiers and all associated site works and services.

33, Robinhood Industrial Estate, Clondalkin, Dublin 22

34m
S01A/0115Granted10 Jul 2001

A 463sq.m warehouse extension and 68 sq.m proposed offices within existing 871 sq.m warehouse, to include wall cladding to front and side of existing building and a 1.8m palisade fence to north and east boundaries and all associated site works

33 Robinhood Industrial Estate, Clondalkin, Dublin 22.

71m
S00A/0126Granted1 Jun 2000

The introduction of a new goods entrance to the gable elevation, a new goods entrance to the gable elevation, a new public access entrance to the front elevation, blocking up ground floor windows, new windows to the first floor offices, a new boundary wall, additional car parking spaces and all associated works at existing cash and carry warehouse.

33a Robinhood Industrial Estate, Clondalkin, Dublin 22.

75m
SD03A/0223Grant Permission for Retention15 Apr 2003

Advertising signage on the southern and western facades, two no. pole signs situated in the car park and a new door on the western facade.

Unit 30, Robinhood Industrial Estate, Dublin 12

75m
SD02A/0204Granted23 Apr 2002

Change of use of part of the warehouse to wholesale, new cladding on the north and west elevations, signage on the new cladding, internal alterations to the existing offices and car parking for 45 no. cars.

Unit 30 Robinhood Industrial Estate, Dublin 22.

75m
S98A/0641Granted27 Nov 1998

Rear extension to industrial unit with ancillary works.

Robinhood Industrial Estate, Clondalkin, Dublin 22.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?