(Land At Junction Of Greenhills Rd. & Main St.), Greenhills Road, Tallaght Village, Dublin 24
Grant Permission for RetentionPlanning application SD03B/0014
Dublin - South Dublin County Council
Proposed Development
3 Dormer windows at roof level.
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jan 2003
Decision: Grant Permission for Retention
7 Mar 2003
Decision due
12 Mar 2003
Grant issued
16 Apr 2003
Application Details
- Location
- (Land At Junction Of Greenhills Rd. & Main St.), Greenhills Road, Tallaght Village, Dublin 24
- Applicant
- N/A
- Application Type
- Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 6000 ha
Timeline
- Registration Date
- 16 January 2003
- Status
- Decision
- Decision
- Grant Permission for Retention
- Decision Date
- 7 March 2003
- Grant Date
- 16 April 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(i) Demolition of existing single storey ESB substation (3.5sq.m) on the north western site boundary; (ii) South building ranging from 5 storeys to 8 storeys (max. height c.26.40m) with a total gross floor area of 2663sq.m comprising; (a) 28 residential units comprising 17 1-bedroom apartments, 10 2-bedroom apartments and 1 3-bedroom apartment; (b) At ground floor and with frontage onto Main Road, 3 commercial units to facilitate a range of uses: Unit B (73sq.m) - Class 1, shop (newsagent, parcel delivery drop store) or Class 10 (Community Centre); Unit C (49sq.m) - Class 1 shop (cycle store/Charity Shop); Unit D (74sq.m) - Class 1, shop, Class 2 (financial/professional services) or Class 8 (Healthcare); (c) Also at ground floor, a management office (17sq.m), a maintenance office (12.5sq.m), ESB substation and switch room (combined 22sq.m) and commercial bin storage area (12.5sq.m); (iii) West building ranging from 4 storeys to 5 storeys (max. height c.16.07m) with a total gross floor area of 1441sq.m comprising (a) 15 residential units including 4 studio units; 5 1-bedroom units, 3 2-bedroom units and 3 3-bedroom units; (b) tenant amenity floorspace (42sq.m) at ground floor;(c) 1 92sq.m commercial unit (Cafe/restaurant/Deli) at the corner of Old Greenhills Road and Main Road; (iv) A communal amenity courtyard (459sq.m) and public open space in the form of a new civic plaza (337sq.m) at the corner of Old Greenhills Road and Main Road and public realm improvements at the southern end of Old Greenhills Road including improvement works to the Katherine Tynan memorial (505sq.m); (v) A basement (1298sq.m) incorporating 25 residents car parking spaces (including 4 Go-Car spaces, 2 electric vehicles spaces and 2 accessible spaces), residents long stay cycle parking (50 spaces) and residents waste management facilities (49sq.m); (vi) A new vehicular entrance from the Old Greenhills Road to the proposed basement; (vii) A total of 24 surface level short stay cycle parking spaces comprising 4 spaces at the Katherine Tynan Memorial, 8 spaces within the residents communal courtyard and 12 spaces at the new civic plaza; (viii) Removal of 2 on-street car parking spaces on Old Greenhills Road to facilitate access to the proposed basement and installation of a raised pedestrian crossing at the southern end of Old Greenhills Road and (ix) All ancillary site development works including installation of drainage and water supply infrastructure, installation of rooftop solar photovoltaics panels (128sq.m) and lighting.
Greenhills Road, Tallaght, Dublin 24
Demolition of petrol station and construction of mixed retail/residential development of 39 no. apartments and 676sq.m. retail on 4 floors over basement car park as follows: 9 no. 3-bedroom apartments, 16 no. 2-bedroom apartments and 14 no. 1-bedroom apartments on ground, first, second and third floors with projecting balconies at first and second floor and 3 no. ground floor retail units - (87sq.m.), (403sq.m.) and (125sq.m.) as modification/extension to and incorporating parts of site of approved development under Reg. ref. SD04A/0731 with vehicular parking access through approved development under construction at combined site of former Esso Service Station at junction of Greenhills Road and Main Road and part of site of development under construction at 3A Greenhills Road, Tallaght.
Greenhills Road/Main Road, Tallaght, Dublin 24
Construction of mixed retail / residential developments of 32 no. apartments and 654 sq.m retail on 4 floors over basement car park as follows: 13 no. 3 bedroom apartments, 10 no. 2 bedroom apartments, and 9 no 1 bedroom apartments, on ground, first, second, and third floors with projecting balconies at first and second floor, and 3 no. ground floor retail units; (245 sq.m); (205 sq.m); and (204 sq.m) as modification/extension to and incorporating parts of site of approved development under construction Reg. Ref. no. SD04A/0731 with vehicular parking access through approved development under construction.
Site of Former Esso Service Station at, Junction Of Greenhills Road And Main Road, Tallaght, Dublin 24
Construction of mixed retail/residential development of 28 no. apartments and 654sq.m. retail on 4 floors over basement car park as follows: 11 no. 3-bedroom apartments, 9 no. 2-bedroom apartments and 8 no. 1-bedroom apartments on ground, first, second and third floors with projecting balconies at first and second floor and 3 no. ground floor retail units (258sq.m.), (192sq.m.) and (204sq.m.) as modification/extension to and incorporating parts of site of approved development under construction, Reg. Ref. SD04A/0731 with vehicular parking access through approved development under construction at combined site of former Esso service station at junction of Greenhills Road and Main Road and part of site of development under construction at 3A Greenhills Road, Tallaght, Dublin 24. Significant Further Information: the revised proposal will consist of construction of mixed retail/residential development 27 no. apartments and 662sq.m. retail on 4 floors over basement car park as follows: 6 no. 3-bedroom apartments, 17 no. 2-bedroom apartments and 4 no. 1-bedroom apartments on ground, first, second and third floors with projecting balconies at first and second floors and 3 no. ground floor retail units {258sq.m.}, {197sq.m.} and {207sq.m.} as modification/extension to and incorporating parts of site of approved development under construction, Reg. Ref. SD04A/0731, with vehicular parking access through approved development under construction.
Site of former Esso service station at junction of Greenhills Road/Main Road, Tallaght, Dublin 24
New signage, including a new facscia sign and projecting sign on front facade.
Four Star Pizza, 3A, Main Street, Tallaght, Dublin, 24
Carry out external works for the removal of an ATM, to be infilled with panelling to match the existing; The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop signs and the removal of the Ulster Bank general blue signage; Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.
24, Main Street, Tallaght, Dublin, 24
Demolition of the existing former Ulster Bank building and the construction of two new buildings: a mixed-use building (Block A) and a residential building (Block B). Block A is a proposed 3-storey accessed by Old Blessington Road (Main Street) and will consist of 1no. retail unit ( 76.5 sqm ) at the ground-floor and 4 no. apartment units ( 4 No. 1-bed units). Block B is a proposed 5-storey located to the rear of the site, accessed by a side lane connected to Old Blessington Road, consisting of 22 no. apartment units (8 No. 1-bed units, 4 No. 2-bed units, and 10 No. 3-bed units). The vehicular and pedestrian entrance is accessed by a side lane connected to Old Blessington Road. The development will also include associated private and communal open spaces, landscaping, bicycle storage, bin storage, retail storage, and all associated site works.
24, Main Street, Tallaght, Dublin 24, D24 Y033
Carry out external works for the removal of an ATM, to be infilled with panelling to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop signs and the removal of the Ulster Bank general blue signage. Carry out internal works for the removal of the ATMs in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.
24 Main Street, Tallaght, Dublin 24 D24 Y033
For extension of opening hours from current hours of 7.00am to 6.00pm to 7.00am to 12.30am.
3, College View, Main Street, Tallaght, Dublin 24.
Change of opening hours from current hours of 7.00 a.m. to 6.00 p.m. to revised hours 1.00 p.m. to 12.00 a.m.
3, College View, Main Street, Tallaght, Dublin 24.