← Back to search

7, The Cottages, Firhouse Road, Dublin 24

Granted

Planning application SD04B/0052

Dublin - South Dublin County Council

Proposed Development

Construction of 3 bedroom single storey extension to rear, and alterations to existing dwelling to include: extension to side to match existing, elevational treatment, new vehicular and pedestrian entrances to front boundary and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Feb 2004

  2. Decision: Grant Permission

    2 Apr 2004

  3. Decision due

    5 Apr 2004

  4. Grant issued

    14 May 2004

Application Details

Location
7, The Cottages, Firhouse Road, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
658 ha
Floor Area
159 sq m

Timeline

Registration Date
10 February 2004
Status
Decision
Decision
Grant Permission
Decision Date
2 April 2004
Grant Date
14 May 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
SD04A/0197Granted29 Jun 2004

The development will consist of revised vehicular entrance and alterations and additions to include relocation of front door to side porch new tiled roof in lieu of flat roof section to rear, construction of single storey extension to rear and the provision of playgroup and after school care facility.

6, Killininny Cottages, Firhouse, Dublin 24

49m
SD21A/0249Granted11 Mar 2022

Construction of dormer bungalow and associated landscaping, services and parking resulting in no extra vehicular traffic to Killakee Green.

8, Firhouse Road, Tallaght, Dublin 24

49m
SD25A/0296WGrant Permission for Retention1 Dec 2025

The development consists of permission for retention of minor alterations to the dwelling house from that previously granted under planning reference SD21A/0249 and construction of a rear masonry shed. The alterations include a new side entrance door, inclusion of 2No. windows and a Velux at first floor level, omission of 3No. Velux windows and a gable wall window at first floor level, adjustment to window sizes at ground level, inclusion of 1no. window at ground level and other minor changes to the side and rear elevations.

Kilakee Green, Ballycragh, Dublin 24

54m
S99B/0248Granted16 Apr 1999

Window to side of first floor.

15 Killakee Court, Firhouse, Dublin 24.

55m
SD12A/0191Granted28 Sept 2012

Proposed ground floor partial front extension with pitched roof over; proposed change of use of area of ground floor of dwelling to beautician use, floor area 19.4 sq.m.

15, Killakee Court, Dublin 24

62m
SD21A/0201Grant Permission for Retention7 Mar 2022

Retention of original garage converted into a hair dressing salon; internal alterations and part front elevation.

17, Killakee Court, Dublin 24

65m
SD21A/0255Granted7 Jan 2022

Construction of 2 three storey dwellings and associated ancillary site works.

Hawthorns, Killakee Lawns, Firhouse, Dublin 24

65m
SD21A/0255/EPGrant Extension of Duration of Permission30 Mar 2026

Construction of 2 three storey dwellings and associated ancillary site works.

Hawthorns, Killakee Lawns, Firhouse, Dublin 24

72m
SD21B/0487Granted25 Feb 2022

New vehicular entrance; dishing; alterations to gated entrance.

24-26, Killakee Green, Tallaght, Dublin 24

74m
S01A/0141Granted2 Oct 2001

Demolition of existing single storey structure, retaining Tara House, construction of 8 no. two bedroom apartments, 4 four bedroom houses and 7 three bedroom houses in three two storey blocks, formation of new vehicular entrance to development from Kilakee Court extension, new site road, 36 car parking spaces, private open space, relocation of part of boundary wall to Kilakee Court, new boundary walls, pavements, tree felling, landscaping and planting on site.

Tara House, Killakee Court, Firhouse, Dublin 24.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?