Greenhills Road/Ballymount Road, Dublin 12
PendingPlanning application SD058/0012
Dublin - South Dublin County Council
Proposed Development
Reconfiguration:
- 1.Construction of approximately 570 metres of 13 metre wide carriageway to include bus lanes in both directions between the Greenhills Road bridge over the M50 eastwards to Ballymount Avenue
- 2.Upgrading of Ballymount Avenue from a 9.0 metre to 13.0 metre carriageway to include bus lanes in both directions.
- 3.Upgrading of Calmount Road to a 13.0 metre carriageway to include bus lanes in both directions from its junction with Ballymount Avenue eastwards for approximately 590 metres.
- 4.Construction of approximately 320 metres of 13 metre wide carriageway to include bus lanes in both directions between the eastern end of Calmount Road and Greenhills Road, thereby linking the two roads.
- 5.Construction of a new signal controlled junction at the junction of Calmount Road and Ballymount Avenue to include a bus bypass of the junction in the outbound direction.
- 6.Construction of new signal controlled junctions at the junction of Calmount Road and Calmount Avenue and the junction of the realigned Greenhills Road and the proposed Limekiln Road Extension.
- 7.Construction of a new roundabout on Greenhills Road together with approximately 50 metres of 9.0m wide carriageway linking the new roundabout with Calmount Avenue.
- 8.Construction of cycletracks and footpaths.
- 9.Installation of bus lane pre-signals and bus gate on the inbound direction on Ballymount Avenue and Calmount Road respectively.
- 10.Provision of drainage and associated features.
- 11.Provision of public lighting, road markings and signage.
Application Details
- Location
- Greenhills Road/Ballymount Road, Dublin 12
- Applicant
- N/A
- Application Type
- Application Under Part 8
- Planning Authority
- South Dublin County Council
- Site Area
- 52569.4800272159 ha
Timeline
- Registration Date
- 19 August 2005Other applications received that week
- Status
- N/A
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
New Century Engineering Ltd have applied for a certification of registration with South Dublin County Council for the operation of a waste transfer facility at this location. The land is not owned by New Century Engineering Ltd and is leased therefore the development is temporary with regards to its operation. There are no permanent structures located on site, offices are based in portacabins which can be removed following cessation of the certificate of registration. There are no plans to build any structures at this location. Containers and portacabins are stored at this facility for short time storage and are removed to larger sites as and when required.
Greenhills Road, Walkinstown, Dublin 12
Bus shelter.
Greenhills Road o/s Keadeen Avenue (to Tallaght), Dublin 24.
18 metre high monopole telecommunications support structure carrying antennae with associated containerised equipment cabin within an enclosed compound for mobile telecommunications purposes.
Innovative Print, Unit 2-4, Ballymount Industrial Estate, Ballymount Drive, Dublin 12.
Removing flat roof and replacing with lean to roof incorporating 3 no. velux windows to facilitate new orientation under roof space as in No 11 Corrig Close.
7, Corrig Close, Dublin 12
The existing permit has now expired and in accordance with the change in waste management regulations, relating to waste facility permits (i.e. the 2007 Waste managment facility permit and Registration regulations) an application for a new waste permit is required. We have been informed by the Environment Dept of SDCC that planning permission or a certificate of exemption are required in order to process the permit application. The facility has full planning permission for the existing buildings and use including the storage of raw cooking oils of c. 5,000 toones/annum in tanks, IBC, and other containers within containment bunds. Raw cooking oil is delivered from the facility to customers including hotels, restaurants, food outlets etc. The facility takes back c.40% (c. 2,000 tonnes/annum) of used cooking oil (UCO) from their customers and store it on site awaiting bulk transport to their UCO recovery plant in Strabane, Co. Tyrone. All UCO is stored on site in sealed containers and within bunds. It is submitted that the temporary storage of this UCO at the premises is similar in all respects to the existing permitted activity (temporary storage of raw cooking oil) and therefore is exempt from the requirement for planning permission.
Unit J1, Ballymount Industrial Estate, Ballymount Drive, Dublin 12
Two openings/entrances in the side wall of the factory.
Unit 20A, Greenhills Industrial Estate, Greenhills, Dubin 12
Bus shelter.
Greenhills Road opposite O'Malleys Eng. (inbound), Dublin 24.
Temporary storage to recycle and reclaim car parts that are reusable.
Greenhills Road, Dublin 12
Storage within the cutilage of an industrial building, in connection with the industrial process carried on in the building, of the deposit of waste arising from the industrial process.
Unit 6, Ballymount Industrial Estate, Walkinstown, Dublin 12
Change of use of c.12.25sq.m of floorspace within the existing warehouse building on site, from warehouse use to use for the temporary storage of shredded electrical & electronic equipment and components.
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
The submission window has closed
Observations on this application closed on Thursday 22 September 2005, five weeks after it was received. The authority cannot accept a late submission.