← Back to search

Site 503, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin

Granted

Planning application SD05A/0290

Dublin - South Dublin County Council

Proposed Development

For revised site plan, building footprint, floor plans & elevations comprising of the construction of 2 no. warehousing blocks as follows:

  1. 1)
    Block B (8.50m high) totalling 990sq.m. including 30sq.m. of ancillary office/staff facilities on ground floor
  2. 2)
    Block C (8.75m high) totalling 4112sq.m. including 400sq.m. of ancillary office/staff facilities one/two floors and 1384sq.m. of mezzanine at first floor together with services, utilities, boundary fences, landscaping, planting, paving, parking and associated site development works all on part previously approved site 503 (Reg. Ref. SD03A/0066 - PL06S.204281).
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Apr 2005

  2. Decision due

    13 Jun 2005

  3. Decision: Grant Permission

    14 Jun 2005

  4. Grant issued

    27 Jul 2005

Application Details

Location
Site 503, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
8900 ha
Floor Area
5102 sq m

Timeline

Registration Date
20 April 2005
Status
Decision
Decision
Grant Permission
Decision Date
14 June 2005
Grant Date
27 July 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

32m
SD08A/0441Granted27 Jun 2008

Revisions to an existing unit consisting of: extension of mezzanine level by 30sq.m. to form full first floor level. Change of use from warehouse unit to food preparation unit on the ground floor, with ancillary office, staff and storage areas on the first floor. The installation of 2 no. first floor windows to the front elevation. The installation of 1 no. AOV & 1 no. roof light to the first floor level.

Unit 23, Block 503, Greenogue Business Park, Rathcoole, Co Dublin

34m
SD19A/0035Granted1 Feb 2019

Change of use of ground floor of Unit 22 from storage to food preparation; internal connection of Units 22 and 23 to expand existing food preparation area at ground floor and to link existing ancillary office, storage and staff areas at first floor; addition of 2 first floor windows to frontage of Unit 22; new glazing behind roller shutters of Units 22 and 23; addition of AOV roof light over staircase of Unit 22; addition of sign to frontage of Unit 23.

Sweet Cicely, Units 22 & 23, Block 503, Grants Drive, Greenogue Business Park, Rathcoole, Co. Dublin

37m
SD08A/0796Grant Permission & Grant Retention28 Aug 2009

Installation of two no. windows at first floor level to front (north) elevation & installation of one no. single vent AOV) at roof level to include for planning retention of the following internal alteration works. Extension of existing first floor level mezzanine floor structure provide for ancillary office/administrative & associated storage/staff accommodation to existing two storey mid-terrace warehouse. Significant Additional Information: the extension of the existing first floor level mezzanine as described by c. 28.5sq.m. to provide for office accommodation of 27.5sq.m. (representing max. 20% of the proposed gross floor area of the subject unit) and additional ancillary storage accommodation constitutes the formation of a full first floor level. Use and related floor areas of proposed development: ground floor level - storage 66sq.m., stairwell 7.1sq.m., first floor level - office 27.5sq.m., storage 23.07sq.m., stairwell/landing & tea station 13.83sq.m.

Unit 22 Block 503, Greenogue Business Park, Rathcoole, Co. Dublin

86m
SD19A/0190Grant Permission for Retention14 Jun 2019

Retention of 657sq.m mezzanine floor within existing warehousing unit providing 595sq.m warehouse storage area and 62sq.m ancillary office/staff facilities; the mezzanine floor is constructed at 4.83m above existing ground floor level; Retention of change of use of 66sq.m of warehousing area at ground floor level to storage/ancillary rooms below mezzanine floor; retention of change of use of warehousing area to internal integrated ESB sub-station and adjoined switch room within Unit 502A measuring 14sq.m with access doors added to the buildings south elevation (737sq.m total area for retention).

Unit 502 A, Grants Row, Greenogue Business Park, Rathcoole, Co. Dublin

92m
SD06A/0510Granted20 Jun 2006

Permission for revised site plan, building footprint, floor plans & elevations comprising the construction of 2 No. warehousing blocks as follows: (1) Block D - 22 No. units (9.9m high) totaling 3,376 sq.m. including 159 sq.m. of ancilary office/staff facilities on 2 floors and 159 sq.m. of mezzanine at first floor; (2) Block E - 22 No. Units (9.9m high) totalling 3,650 sq.m. including 348 sq.m. of ancillary office/staff facilities on 2 floors and 294 sq.m. of mezzanine at first floor together with services, utilities, boundary fences, landscaping planting, paving, parking and associated site development works all on part of previous approved site 503 (Ref: SD05A/0591), Phase 5, Greenogue Ind. Est., Rathcoole

Site 503N, Greenogue Industrial Estate, Rathcoole, Co. Dubllin.

93m
SD05A/0591Granted19 Jul 2005

Revised site plan,building footprint, floor plans and elevations comprising the construction of 2 no. warehousing blocks as follows: (1) Block D (10.2m high) totalling 5424sq.m. including 792sq.m. of ancillary office/staff facilities on 2 floors and 2082sq.m. of mezzanine at first floor; (2) Block E (9.9 m high) totaling 5472sq.m. including 792sq.m. of ancillary office/staff facilities on 2 floors and 2106sq.m. of mezzanine at first floor together with services,utilities, boundary fences, landscaping, planting, paving, parking and associated site development works all on part of previously approved site 503 (Reg/Ref: SD03A/0066 - PL 06S.204281)

Site 503 (north), Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin

116m
SD09A/0224Grant Permission for Retention26 May 2009

Retention of existing 18 metre high monopole telecommunications support structure, carrying antennae with associated equipment cabin within an enclosed compound for mobile telecommunications purposes.

Greenogue Business Park, Rathcoole, Co. Dublin

117m
SD07A/0419Granted5 Jun 2007

Installation of mezzanine floor(289.2 square metres), internal refurbishment and installation of wash bay (4.3 x 4.1 metres) to form Tool Hire, Storage and Distribution Depot; internal alterations to premises to form repair workshop (165 square metres), canteen (14 square metres), transport office (9.57 square metres) and reception/showroom (46.75 square metres); installation of fire exit door, new double door entrance, gas storage cage (3.5 x 2.0 metres) and erection of palisade fence (2.4 metres high).

Unit 504-1, Phase 5, Greenogue Industrial Estate, Rathcoole, Co. Dublin

117m
SD15A/0200Grant Permission for Retention14 Jul 2015

Retention permission for existing 18m monopole, associated antennas, link dish and associated ancillary equipment and existing equipment cabin located within existing secure compound.

Greenogue Business Park, Rathcoole, Dublin

121m
SD03A/0874Granted11 Feb 2004

Erection of an 18 metre high monopole telecommunications support structure, carrying antennae with associated equipment cabin within an enclosed compound for mobile telecommunications purposes.

Greenogue Business Park, Rathcoole, Co. Dublin.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?