← Back to search

Scoil Treasa National School, Ballycullen Avenue, Firhouse, Dublin 24

Invalid - Site Notice

Planning application SD07A/0043

Dublin - South Dublin County Council

Proposed Development

2.1m high perimeter railing to the school grounds at Scoil Treasa. The works will involve the relocation of both the existing vehicle / pedestrian main access to the school and the vehicular access to the Presbytery and teachers car park approximately 5m in a southerly direction to ensure that both access gates are at right angle to Ballycullen Avenue and also to facilitate the construction of a new access ramp from the high level teachers car park to the school perimeter footpath below. The works will include the construction of 2 no. pedestrian access gateways, one to serve the existing access pathway from the Church of Our Lady of Mount Carmel to the Presbytery, and the second to be located in the north east corner of the perimeter railing in the area of the existing tarmacadam ball courts. We also propose to construct a new vehicular access gateway approximately half way between the Presbytery and Carriglea Grove to facilitate access to the school playing grounds from Ballycullen Avenue.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jan 2007

  2. Decision: Invalid - Site Notice

    13 Feb 2007

  3. Decision due

    18 Mar 2007

Application Details

Location
Scoil Treasa National School, Ballycullen Avenue, Firhouse, Dublin 24.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
27000 ha

Timeline

Registration Date
22 January 2007
Status
Decision
Decision
Invalid - Site Notice
Decision Date
13 February 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD07A/0151Refused17 Sept 2007

2.1m high perimeter railing to the school grounds at Scoil Treasa. The works will involve the relocation of both the existing vehicle / pedestrian main access to the school and the vehicular access to the Presbytery and teachers car park approximately 5m in a southerly direction to ensure that both access gates are at right angle to Ballycullen Avenue and also to facilitate the construction of a new access ramp from the high level teachers car park to the school perimeter footpath below. The works will include the construction of 2 no. pedestrian access gateways, one to serve the existing access pathway from the Church of Our Lady of Mount Carmel to the Presbytery, and the second to be located in the north east corner of the perimeter railing in the area of the existing tarmacadam ball courts. We also propose to construct a new vehicular access gateway approximately half way between the Presbytery and Carriglea Grove to facilitate access to the school playing grounds from Ballycullen Avenue.

Scoil Treasa National School, Ballycullen Avenue, Firhouse, Dublin 24.

5m
SD07A/1003Granted14 Dec 2007

Single storey Resource Room extension to the front (western) side.

Scoil Treasa National School, Ballycullen Avenue, Firhouse, Dublin 24.

92m
SD03A/0502Declared Withdrawn16 Jul 2003

A 4.6 x 1.5 x 2.3m high steel & glass bus shelter with 2 illuminated display panels

Ballycullen Avenue opposite, Church Outside School (outbound)

102m
SD03A/0501Declared Withdrawn16 Jul 2003

A 4.6 x 1.5 x 2.3m high steel & glass bus shelter with 2 illuminated display panels

Ballycullen Avenue outside Church, (inbound)

126m
SD08A/0400Grant Permission & Grant Retention12 Jun 2008

Replacement canopy to forecourt, increase from one to four car washes, decrease from four fuel pumps to one fuel pump together with ancillary works associated with the above

Firhouse Service Station, Ballycullen Avenue, Dublin 24

130m
SD06B/0921Granted15 Dec 2006

Two storey extension to the side of the existing house, providing new bedroom at first floor level, new reception at ground floor level, one storey extension to part of the rear, removal of existing conservatory to the rear, totalling 68sqm, together with alterations to internal layout and associated site works.

88, Woodlawn Park Avenue, Firhouse, Dublin 24

130m
SD07B/0441Granted21 May 2007

Amendment to the previously approved application, Reg. Ref. no. SD06B/0921, to extend the reception at the ground floor level of the proposed two storey extension to the side of the existing house by an additional 2 sq.m and associated site works.

88, Woodlawn Park Avenue, Firhouse, Dublin 24

132m
S01A/0619Granted21 Sept 2001

Two storey 4 bedroom detached house with single storey extension to rear on garden site adjacent to

14 Carriglea Grove, Firhouse, Dublin 24.

134m
SD08A/0832Granted10 Dec 2008

Demolition of existing two-storey detached extension at side of existing house, construction of detached two storey house in side garden and widening existing site entrance.

12, Carriglea Grove, Firhouse, Dublin 24

134m
SD14B/0137Granted16 May 2014

Single storey extension to rear to provide extended kitchen/dining area, conversion of garage to provide playroom & ground floor wc, extension first floor level to front and side (above converted garage) to provide extended master bedroom area including remodelled ensuite along with widening of existing vehicular entrance to provide 3.6m wide entrance along with all associated site works.

12, Carriglea Grove, Firhouse, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?