Unit 2, Greenhills Industrial Estate, Dublin 12
GrantedPlanning application SD07A/0890
Dublin - South Dublin County Council
Proposed Development
Alterations and extensions to an existing single storey office and workshop unit. Works comprise of ground and first floor extensions along with an internal mezzanine within the workshop. Internal alterations to the existing offices, relocation of the existing workshop access door, elevational alterations and new profiled metal roof to the existing workshop together with associated site and ancillary works.
View the full application file on the council's planning portal →Application Timeline
Further information requested
9 Jan 2008
Application received
25 Mar 2008
Further information received
25 Mar 2008
Decision due
21 Apr 2008
Decision: Grant Permission
21 Apr 2008
Grant issued
3 Jun 2008
Application Details
- Location
- Unit 2, Greenhills Industrial Estate, Dublin 12
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 1480 ha
- Floor Area
- 245.5 sq m
Timeline
- Registration Date
- 25 March 2008
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 21 April 2008
- Grant Date
- 3 June 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Internal alterations and extensions to existing building at ground floor level to provide 2 no. stairwells and the construction of a first floor office extension over the existing building.
Unit 6A & Unit 6B, Greenhills Industrial Estate, Dublin 12.
First floor offices over existing ground floor offices and new roof with increased height to existing warehouse.
Unit 3, Greenhills Industrial Estate, Walkinstown, Dublin 12.
1) Demolish two number existing industrial units to allow for proposed new warehouse structure 2) All ancillary site works
Unit 24 Greenhills Ind. Est. Greenhills Road, Dublin 12
Combining this unit with the adjoining units and construction of a single-storey extension of 202sq.m. to the rear and side of this end-of-terrace warehouse unit which is currently 400sq.m. in area.
Unit 5, Greenhills Industrial Estate, Walkinstown, Dublin 12.
For demolition of ground floor offices to front and construction of replacement single storey warehouse extension to front.
Unit 4, Craftmasters Complex, Greenhills Industrial Estate, Walkinstown, Dublin 12
Demolition of part of the two-storey front section and alterations to the front elevation and construction of a single-storey extension of 445.2 sq.m to the rear and side of this terraced warehouse unit which is currently 1,186.5 sq.m in area.
Units, 3, 4 & 5, Greenhills Industrial Estate, Walkinstown, Dublin 12
Provision of a vehicle entrance door to the front elevation.
Unit 3 Craftmasters Complex, Greenhills Industrial Estate, Greenhills, Dublin 12
Two storey extensions to side and rear of existing house with a proposed extended porch to the front of the house to accommodate extended living space and kitchen and an additional bedroom at first floor level and a proposed pedestrian gate to the rear garden from the existing lane.
1, St. Bridgets Drive, Greenhills, Dublin 12.
A single storey rear extension and single storey front extensions to form a porch to the existing house, a garage within the rear garden accessed from the public laneway and an increase in height of the side boundary wall to the public laneway to 2200 mm high.
1, St Bridgets Drive, Greenhills, Dublin 12
Industrial unit adjoining existing industrial development
rear of Craftmasters Building at Greenhills Ind Est Walkinstown D12
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?