Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22
Grant Extension of Duration of PermissionPlanning application SD07A/1005/EP
Dublin - South Dublin County Council
Proposed Development
Change of use from existing restaurant to drapery retail (242sq.m.) at ground floor level, change of use from existing drapery stockroom to drapery retail (219sq.m.) at ground floor level, change of use from existing storage area to retail (2,454sq.m.) and restaurant use at first floor level (344sq.m.), construction of an external smoking platform and grocery stockroom (528sq.m.) above the existing grocery stockroom, construction of new entrance (146sq.m.), amendments to part of the existing drapery retail and grocery retail at ground floor level, proposed new lifts and stairwells and new fire escape staircase with associated roof over, new signage on south facade and refurbishment of existing signage on east facade and new lift enclosures.
View the full application file on the council's planning portal →Application Timeline
Application received
7 Mar 2013
Decision: Grant Extension of Duration of Permission
29 Apr 2013
Grant issued
29 Apr 2013
Decision due
30 Apr 2013
Application Details
- Location
- Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22.
- Applicant
- N/A
- Application Type
- Extension Of Duration Of Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 12200 ha
- Floor Area
- 674 sq m
Timeline
- Registration Date
- 7 March 2013
- Status
- Decision
- Decision
- Grant Extension of Duration of Permission
- Decision Date
- 29 April 2013
- Grant Date
- 29 April 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Change of use from existing restaurant to drapery retail (242sq.m.) at ground floor level, change of use from existing drapery stockroom to drapery retail (219sq.m.) at ground floor level, change of use from existing storage area to retail (2,454sq.m.) and restaurant use at first floor level (344sq.m.), construction of an external smoking platform and grocery stockroom (528sq.m.) above the existing grocery stockroom, construction of new entrance (146sq.m.), amendments to part of the existing drapery retail and grocery retail at ground floor level, proposed new lifts and stairwells and new fire escape staircase with associated roof over, new signage on south facade and refurbishment of existing signage on east facade and new lift enclosures.
Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22.
Extension to supermarkets grocery stockroom (45sq.m) to provide online grocery storage area.
Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22
Install and ATM (money dispensing machine) kiosk in the mall
The Mill Centre, Clondalkin, Dublin 22.
Changes to previously approved permission Reg. Ref. SD13A/0100 consisting of a 300mm increase in width of the Aldi retail unit resulting in an increase in floor area of 18sq.m; alterations to elevations consisting of a 1.494m height reduction to parapets to west and south elevations and removal of 1 window to the south elevation.
Former CB Packaging Site, Ninth Lock Road, Clondalkin, Dublin 22
Change of use and amalgamation of Unit 24A with Dunnes Stores Cafe (units 25/26) to increase the cafe's size from 257sqm to 368sqm, including an extended mall seating area and all other associated site works/services
Unit 25/26 & 24A, Dunnes Stores Cafe, The Mill Centre, Ninth Lock Road, Dublin 22
Retail/commercial development (3,099sq.m. gross floor area) comprising supermarket with ancillary off-licence sales area (net retail sales area of 1,288sq.m.), 3 no. retail units (totalling 485sq.m. gross floor area) and office (687sq.m. gross floor area) fronting Ninth Lock Road; a link road and new junctions on the Ninth Lock Road and New Nangor Road is proposed to connect these roads and provide access to the 120 surface car parking spaces serving the proposed development; this road is as previously approved under Reg. Ref. SD09A/0306 (Bord Ref. PL06S.236791); permission also sought for demolition of the existing substation (28sq.m.) and provision of new substation, bin store, delivery/service areas, plant room, signage, lighting, landscaping and associated site and development works; a site is reserved for a future building fronting the new access road.
Former CB Packaging Site, Ninth Lock Road and part fronting New Nangor Road, Clondalkin, Dublin 22
Change of use from retail use to restaurant use which involves relocating part of the existing Timepiece restaurant into the adjoining retail unit (original Dunnes Stores Off-Licence Unit).
Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22.
Demolition of the existing ESB substation and construction of a mixed use development with a gross floor area of 19361sq.m. comprising office accommodation (12,692sq.m.), a Discount Foodstore (1671sq.m.) and 4 no. Retail Units (total 4,723sq.m.) arranged in 2 no. blocks all over a single storey basement car park. Block A will consist of a 7,847sq.m., 4 storey building located adjacent to the existing Dunnes Stores building which will accommodate a 1,671sq.m. Discount Foodstore at ground floor with a public entrance off Ninth Lock Road, an associated service yard and plant to rear, enclosed moving walkway access to the basement car park an a trolley bay structure to the north side elevation. Block A will also accommodate a total of 6,158sq.m. office area over the 4 floors with ground floor entrance off Ninth Lock Road with an 82sq.m. south screened terrace at first floor, 87sq.m. east terrace at second floor and 79sq.m. north terrace at third floor with plant space provided at roof level with stair and lift access. Block B will consist of 11,514sq.m., 4 storey building located adjacent Block A which will accommodate 4 no. retail units (total gross floor area 4,723sq.m.) at ground and first floor with public entrances off Ninth Lock Road and the proposed new vehicular access road with associated service yard to the rear and public lift and stair access to basement car park on the south side elevation. Block B will also accommodate a total of 6,534sq.m. office area over the 4 floors with ground floor entrances off Ninth Lock Road and the proposed new vehicular access road with a 132sq.m. west terrace at first floor, 67sq.m. east terrace at second floor and 150sq.m. north terrace at third floor with 2 no. ESB substations and switch room at ground floor level onto the proposed new vehicular access road and plant space provided at roof level with stair and lift access. The basement car park will consist of 335 no. car spaces, 124 no. cycle spaces and storage area (200sq.m. including 100sq.m. bin storage) accessed by vehicular ramp to the rear of Block B with 3 no. single storey basement stair access structures to the western site boundary. 115 no. car spaces, 118 no. cycle spaces will be provided at ground level to the rear of Blocks A & B with public space, planting and landscaping and all associated site & development works. Permission is also sought to construct a new junction from the New Nangor Road and upgrade and relocate an existing access off the Ninth Lock Road, a pedestrian and cycle access is also sought off Ninth Lock Road all on lands at the former CB Packaging site, Ninth Lock Road and part lands fronting New Nangor Road (1.459 ha site area). Significant Further Information: the relocation to the south of the new access road by 40m, the omission of the basement car park and its substitution with two surface car parks. The effect of these changes is to separate the proposed development either side of the new access road, reduction in overall quantum of development from 19361sq.m. to 14172sq.m. with an enlargement of the site area within the applicants overall land ownership as outlined in blue on the lodged plans, in particular to accommodate surface car parking. Planning permission is now sought for the demolition of the existing substation and construction of a mixed use development with a gross floor area of 14172sq.m. and a total site area of 2.49ha. The development comprises 1 no. 3 storey block over Site 1A and 1 no. 3 storey block over Site 1B which consist of: office accommodation (6797sq.m.), Discount Food Store (1600sq.m.) and 14no. retail units (totalling 7375sq.m.); 386 surface car parking spaces and 178 cycle spaces provided over two car parks at ground level of Sites 1A and 1B with public space, landscaping and associated site and development works. Permission is also sought to construct a new junction from the New Nangor Road and upgrade and relocate an existing access off Ninth Lock Road, a pedestrian and cycle only access is also sought off Ninth Lock Road. Site 1A comprises 5838sq.m., located adjacent to the existing Dunnes Stores building and consists of: 1600sq.m. Discount Food Store and 6 no. retail units totalling 799sq.m. at ground floor level with public entrances from the new access road and ancillary service area and plant to the car park at the rear; 3439sq.m. office units over 3 storeys with ground floor entrances off Ninth Lock Road and the new access road; 1 no. substation and switch room at ground floor level onto Ninth Lock Road; ancillary bin storage off Ninth Lock Road and the car park to the rear with plant areas at lower roof levels. Site 1B comprises 8334sq.m., located to the north of the new access road and consists of: 8 no. retail units (total gross floor area 4976sq.m.) at ground and first floor levels with public entrances off the new access road and the surface car park to the north with ancillary service area within the building accessed from the car park; 3358sq.m. office over 2 storeys with ground floor entrances off new access road and car park; 1 no. substation and switch room at ground floor level onto Ninth Lock Road; internalised communal bin storage facilities accessed from car park and provision of a plant area within the courtyard at first floor level.
Ninth Lock Road, Clondalkin, Dublin 22
Relocation of the existing Timepiece restaurant into the adjoining retail unit (original Dunnes Stores Off-Licence Unit) as an amendment to previous planning application (Register Reference: SD05A/0742), change of use from drapery stockroom to drapery retail (249.5sq.m.), change of use from restaurant to drapery retail (220.6sq.m.), change of use from drapery stockroom to restaurant (150.4sq.m.), construction of a proposed first floor level drapery stockroom (328.1sq.m.) above the existing drapery stockroom area and amendments to part of the existing drapery stock room at ground floor level (107.9sq.m.).
Dunnes Stores, The Mill Centre, Clondalkin, Dublin 22.
Changes to previously approved permission Reg. Ref. SD13A/0100 consisting of amendments to window opes to ground floor retail Units 2 and 3; alterations to elevations and amendments to window opes to first floor offices on elevations and car park elevation resulting in a reduction of office space of 24sq.m.
Former CB Packaging Site, Ninth Lock Road, Clondalkin, Dublin 22
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?