← Back to search

62, Carrigwood, Ballycullen Road, Firhouse, Dublin 24

Invalid - Site Notice

Planning application SD08B/0600

Dublin - South Dublin County Council

Proposed Development

Construction of single storey extension to front of dwelling house

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Aug 2008

  2. Decision: Invalid - Site Notice

    10 Sept 2008

  3. Decision due

    14 Oct 2008

Application Details

Location
62, Carrigwood, Ballycullen Road, Firhouse, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
2100 ha
Floor Area
6 sq m

Timeline

Registration Date
20 August 2008
Status
Decision
Decision
Invalid - Site Notice
Decision Date
10 September 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD08B/0679Granted1 Oct 2008

Construction of single storey extension to front of dwelling house

62, Carrigwood, Ballycullen Road, Firhouse, Dublin 24

42m
S99A/0282Granted14 Jul 1999

Detached house, widening of existing vehicular entrance and relocation of side boundary wall.

85 Carrigwood, Firhouse, Dublin 24.

43m
SD22B/0279Granted17 Jun 2022

Hip roof modification including front solar panels/roof window and rear dormer attic extension including all associated ancillary works

58, Carrigwood, Firhouse, Dublin 24, D24 K2AH

52m
SD23B/0146Granted4 Apr 2023

Attic Conversion to Non Habitable space involving construction of dormer window to rear elimination of hipped end on roof at gable incorporating mini-hip with provision of small window on gable and new window styles at front and rear.

85 Carrigwood, Firhouse, Dublin 24.

64m
S00B/0214Grant Permission & Refuse Permission5 Apr 2000

Single storey extension to rear and attic conversion with dormer windows.

99 Carrigwood, Firhouse, Dublin 24.

64m
SD14B/0223Granted27 Aug 2014

Upgrade of attic conversion with additional Velux window to front, side and rear and change existing hipped roof to 'Dutch' gable style.

99, Carrigwood, Dublin 24

65m
SD05B/0778Refused13 Dec 2005

First floor extension to the rear of existing dwelling house to comprise a new bathroom and extension to existing first floor bedroom along with associated alterations to the existing dwelling.

87, Carrigwood, Ballycullen Drive, Firhouse, Dublin 24.

65m
SD05B/0779Granted13 Dec 2005

Extension and elevational alterations to front of existing dwelling house comprising new bay window to living room & new canopy roof to front elevation along with interior alterations to ground floor and new ground floor w/c window to side elevation.

87, Carrigwood, Ballycullen Drive, Firhouse, Dublin 24.

72m
SD21B/0159Granted22 Mar 2021

Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and dutch hip; new access stairs and flat roof dormer to the rear.

36, Carrigwood, Tallaght, Dublin 24

76m
SD06A/0548Granted1 Nov 2006

(1) Demolition of shed to rear, single storey extension to side and front; (2) construction of a 3-bed, 2-storey detached dwelling with new vehicular entrance & ancillary services to side; (3) new roof canopy over entrance door and repositioning of vehicular entrance to front of existing dwelling.

110, Carrigwood, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?