Unit 3096, Block B, Lake Drive, Citywest Business Campus, Dublin 24
Grant Permission for RetentionPlanning application SD10A/0232
Dublin - South Dublin County Council
Proposed Development
Retention of illuminated external signage at high level on the southwest
View the full application file on the council's planning portal →Application Timeline
Application received
4 Aug 2010
Decision: Grant Permission for Retention
27 Sept 2010
Decision due
28 Sept 2010
Grant issued
10 Nov 2010
Application Details
- Location
- Unit 3096, Block B, Lake Drive, Citywest Business Campus, Dublin 24
- Applicant
- N/A
- Application Type
- Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 1113 ha
Timeline
- Registration Date
- 4 August 2010
- Status
- Decision
- Decision
- Grant Permission for Retention
- Decision Date
- 27 September 2010
- Grant Date
- 10 November 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Relocation of the existing vehicle entrance off Lake Drive approx. 25m to the northwest together with new landscaping, including minor realignment of existing car park spaces, kerbing etc. in location of the redundant entrance at existing office block Unit 3090-3100 National Digital Park forming part of the Business Park development at Citywest Business Campus permitted under Reg. Ref. S98A/0883 dated 18/12/98.
Unit 3090, National Digital Park, Citywest Business Campus, Tallaght, Dublin 24
Office development comprising of two blocks, three storeys high, with plant rooms at roof level forming landscaped courtyard; ESB sub-station; bin and air-handling plant enclosures; 250 car spaces; landscaping, including site mounding; trees and shrubs and new site entrance off City West Road 4.
Site 3094 City West Business Campus, Naas Road, Dublin 24. Bounded by City West , Roads 4 & 5.
Construction of an external storage shed, 5 additional car parking spaces, extending existing rear yard, a below ground rain water harvesting tank and replacement of existing yard gate and fencing, complete with all associated site works and ancillary accommodation.
Castle House, 2001 Castle Drive, Citywest Business Campus, Citywest, Dublin 24
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
2001, Castle House, Citywest Road, Dublin 24
Retention of 1 Totem Sign Unit, complete with all associated site works.
Castle House, 2001 Castle Drive, Citywest Business Campus, Citywest, Dublin 24
Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station.
Circle K, City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
Construction of a new service station to incorporate a single storey amenity building of 350sq.m gross floor area comprising a convenience retail store of 99sq.m, an internal seating area, a hot food deli, ancillary food preparation, storage, staff, plant and toilet areas and an external courtyard storage area; forecourt with four pump islands, canopy with an illuminated fascia over and 2 no. 40,000 and 1 no. 60,000 litre underground fuel storage tanks with associated pipework and overground fill points; 38 car parking spaces, 2 motorbike parking spaces, electric car charging point, air/water services area and bicycle parking; car wash facility; landscaping works; company signage throughout the site; new vehicular access from Garter Avenue; all associated site and development works.
Site 2000, Citywest Business Campus, Citywest Road, Dublin 24.
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
Circle K, City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.
Circle K City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
(A) Change of use from laboratories to office accommodation; (B) provision of 803.2sq.m additional office accommodation at first floor with new fenestration on north east and south west facades and the addition of 5 car parking spaces; (C) alterations to internal layouts and additional connections to underground drainage; (D) retention of existing signage on facade and entrance to site.
3200, Lake Drive, Citywest Business Campus, Co. Dublin