Unit 2 & 3, Brookfield Enterprise Centre, Tallaght, Dublin 24
GrantedPlanning application SD13A/0117
Dublin - South Dublin County Council
Proposed Development
Change of use from light industrial to retail pharmacy.
View the full application file on the council's planning portal →Application Timeline
Application received
17 Jun 2013
Decision: Grant Permission
8 Aug 2013
Decision due
11 Aug 2013
Appeal submitted
4 Sept 2013
Grant issued
15 Jan 2014
Appeal decided: Grant Permission
15 Jan 2014
Application Details
- Location
- Unit 2 & 3, Brookfield Enterprise Centre, Tallaght, Dublin 24.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 100 ha
- Floor Area
- 141 sq m
Timeline
- Registration Date
- 17 June 2013
- Status
- Appeal decided
- Decision
- Grant Permission
- Decision Date
- 8 August 2013
- Grant Date
- 15 January 2014
- Permission Expires
- 24 December 2013
An Coimisiún Pleanála Appeal
- Appeal Reference
- PL 06S.242430
- Status
- Appeal decided
- Decision
- Grant Permission
- Submitted
- 4 September 2013
- Decided
- 15 January 2014
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for alterations consisting of the addition of 2 no. windows to the rear elevation and 6 no. rooflights, facing north east to the existing roof.
Unit 6, Brookfield Enterprise Centre, Talllaght, Dublin 24
Proposed housing development will consisting of 16 apartment units and will include, demolition of existing derelict two-storey shop unit at Brookfield Avenue / Rossfield Avenue; removal of existing boundary walls, fences, existing entrance, gate and signage to Brookfield Enterprise Centre to facilitate proposed development; construction of 16 apartment units in two blocks; proposed blocks are located on both sides of the existing entrance roadway into Brookfield Enterprise Centre and will be three storeys in height stepping down to two storeys adjoining existing houses on Brookfield Avenue / Rossfield Avenue. Apartments will consist of a mix of 1, 2 and 3-bed own-door units; construction of new entrance, gate, signage and bin-store to Brookfield Enterprise Centre, upgrading of roadways and paths, provision of new car-parking spaces, provision of cycle parking, hard and soft landscape works, lighting, signage and all associated infrastructure, site and development works necessary to facilitate the proposed development.
Site at Brookfield Avenue / Rossfield Avenue and Brookfield Road, Jobstown, Tallaght, Dublin 24.
Two storey church building for Tallaght Family Church (843.12sq.m.). The accommodation includes: (a) auditorium for 119 people with gallery for 50 people; (b) charity shop; (c) cafe and kitchen; (d) counselling rooms; (e) YMCA offices; (f) youth, children and baby rooms; (g) toilets, lift, plant rooms and sundry supporting facilities; (h) car parking for 5 spaces, including one disabled space, to supplement existing enterprise centre car parking for 55 cars.
At the junction of Brookfield Road and Rossfield Avenue, Tallaght, Dublin 24.
Removal of existing prefab accommodation and replacing it with single storey extensions to each side of the existing building; extensions to include 4 no. classrooms in total with ancillary accommodation and associated site works.
St. Aidans N.S., Brookfield, Tallaght, Dublin 24.
A 160 sq.m two classroom, free standing prefabricated building with a covered link to the main building at the side of the existing main school building along with all necessary associated site works .
Brookfield Primary School, Brookfield Road, Tallaght, Dublin 24
Erection of 2 prefabricated classrooms associated toilets and site works
St. Brigids National School, Brookfield Road, Tallaght, Dublin 24
A 155.6 sq..m two classroom, free -standing prefabricated building with a covered link to the main building at the rear of the existing main school building along with all associated site works.
Brookfield Primary School, Brookfield Road, Tallaght, Dublin 24
Removal of two single storey flat roofed PortaCabin Blocks of 481sq.m. overall size (Block 1 comprising 116sq.m. of 1 Resource Room plus 1 Classroom; Block 2 comprising 365sq.m. of 8 Resource Rooms plus 2 Classrooms) with the construction of one replacement block of 575sq.m. additional accommodation with a pitched roof and comprising 4 number 80sq.m. Mainstream Classrooms and 6 number 16sq.m. Resource Rooms; all external finishes to match the existing school with enabling and ancillary works with connections into existing drains on site.
St. Brigids Junior National School, Brookfield, Tallaght, Dublin 24.
(1) Single storey, prefabricated building comprising 169.6sqm and consisting of 2 classrooms and link corridor to the east side of the existing school building, (2) single storey, prefabricated building, comprising 36.8sqm consisting of two resource rooms and link corridor to the west side of the existing building and (3) all necessary associated site works to include the provision of a fire access road, incidental security fencing and perimeter footpaths.
Brookfield Primary School, Brookfield Road, Tallaght, Dublin 24
A 168sqm single storey two classroom, free-standing prefabricated building with a covered link to the main building at the side of the existing main school, extend the existing hard standing to the front of the school to facilitate fire brigade access along with all necessary associated works.
Brookfield Primary School, Brookfield Road, Tallaght, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?