← Back to search

Unit 2003, Orchard Avenue, Citywest, Dublin 24

Grant Permission & Grant Retention

Planning application SD14A/0007

Dublin - South Dublin County Council

Proposed Development

Retention of an internal mezzanine 130sq.m. area together with the removal of an existing loading door and the insertion of new window into west elevation. Permission for new porch around existing loading door to rear (south) elevation.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Jan 2014

  2. Decision: Grant Permission & Grant Retention

    14 Mar 2014

  3. Decision due

    19 Mar 2014

  4. Grant issued

    24 Apr 2014

Application Details

Location
Unit 2003, Orchard Avenue, Citywest, Dublin 24.
Applicant
N/A
Application Type
Permission and Retention
Planning Authority
South Dublin County Council
Site Area
873.3 ha
Floor Area
166 sq m

Timeline

Registration Date
23 January 2014
Status
Decision
Decision
Grant Permission & Grant Retention
Decision Date
14 March 2014
Grant Date
24 April 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD08A/0020Grant Permission for Retention14 Jan 2008

Two internal mezzanine areas and staff canteen with a combined area of 414sq.m. New glazed pedestrian sliding access door with associated paving to west elevation. The provision of roller shutter to the south elevation with associated concrete ramp and new tarmac hard standing providing an extra 10 car parking spaces.

Unit 2003, Citywest Business Campus, Citywest, Dublin 24.

0m
SD17A/0112Granted28 Aug 2017

Extension comprising 461sq.m at ground floor and 134.7sq.m at first floor to the side of the existing building providing additional warehousing and staff facilities together with associated site works.

Unit 2003, Orchard Avenue, Citywest Business Campus, Naas Road, Dublin 24

38m
SD18A/0244Granted21 Sept 2018

11 new car parking spaces to the front of the existing building with an enlargement to the surface water attenuation tank previously granted under Reg. Ref. SD17A/0112 together with associated site works.

Unit, 2003, Orchard Avenue, Citywest Business Campus, Naas Road, Dublin 24

82m
SD09A/0019Granted13 Jan 2009

Elevation alterations, including additional door to the front elevation, glazed windows to the rear elevation, signage to the front and side elevations, louvers to the rear elevation and mechanical plant to the rear.

Unit 6 & 7a, Block 2, 2050 Orchard Avenue, Citywest Business Campus, Dublin 24

83m
SD06A/1081Granted5 Jun 2007

7 no. units consisting of single storey warehouse/production areas together with two storey offices and 3 no. units consisting of 2 storey offices to be built in two separate blocks (overall floor area 4554sq.m.) with associated car parking, landscaping, signage and ESB substation and switchroom.

Site 2050, Orchard Avenue, Citywest Business Campus, Dublin 24.

131m
SD17A/0332Grant Permission & Grant Retention15 Sept 2017

Change of use of part of the existing warehouse section to the rear of the existing two storey office/warehouse unit from industrial and related uses to showroom with associated training centre and associated classroom and the retention permission of a high level wall mounted sign over the main entrance to the front elevation of the exisitng office unit.

Unit 2004, 4 Orchard Avenue, Citywest Business Campus, Citywest, Dublin 24

136m
SD26B/0260WRecommendation Review28 Jul 2026

Single-storey extension to the front of the main house and a family flat to the side, and any ancillary works required to facilitate the development.

23, Edenbrook Grove, Dublin, D24 YAX6

162m
SD25B/0434WGranted17 Sept 2025

The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.

38, Edenbrook Green, Citywest, Co. Dublin, D24 DXC6

174m
SD24B/0297WGrant Permission for Retention28 Jun 2024

Retention consists of the construction of a rooflight in the main roof to the front of the property.

17, Edenbrook Grove, Citywest, Co. Dublin, D24 FV1F

175m
SD19A/0084Grant Permission & Grant Retention10 May 2019

(A) Change of use from laboratories to office accommodation; (B) provision of 803.2sq.m additional office accommodation at first floor with new fenestration on north east and south west facades and the addition of 5 car parking spaces; (C) alterations to internal layouts and additional connections to underground drainage; (D) retention of existing signage on facade and entrance to site.

3200, Lake Drive, Citywest Business Campus, Co. Dublin

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?