Greenhills Road Extension & Tallaght Bypass (N81), Tallaght, Dublin 24
GrantedPlanning application SD14A/0176
Dublin - South Dublin County Council
Proposed Development
Revisions to previously approved and substantially constructed development (Reg. Ref. SD06A/0107 and An Bord Pleanala Reference PL06S.217573) to include the following: (1) Block A - change of use of previously approved and constructed office use (514sq.m.) at upper basement and (200.6sq.m.) at ground floor level to provide for crèche use (278sq.m.) at upper basement level (which is a relocation of the permitted crèche from Block B, provision of 5 residential units comprising 2 no. 1 bed live/work units at the upper basement level and 2 no. 1 bed and 1 no. 2 bed apartments at ground floor and 15 associated storage rooms at upper basement level along with revised elevation treatment including terraces and balconies and associated site works. (2) Block B - change of use from previously approved and constructed crèche use (278.2sq.m.) at ground floor level to provide for 4 residential units comprising 2 no. 1 bed and 2 no. 2 bed along with revised elevation treatment including terraces and associated site works. (3) Block C - change of use from previously approved and constructed retail use (128.0sq.m.) at ground floor level and the provision of 1 no. 3 bed unit within the existing building envelope; change of use from previously approved office use (478sq.m.)/retail use (165sq.m.) at first floor, second floor office use (731sq.m.) and third floor office use (643sq.m.) to provide for 20 residential units within the existing building envelope comprising 6 no. 1 bed, 11 no. 2 bed, 3 no. 2 bed duplex units and 5 storage rooms at each level along with revised elevation treatment including terraces and balconies, associated site works and provision of photovoltaic panels and roof lights at roof level.
View the full application file on the council's planning portal →Application Timeline
Application received
21 Aug 2014
Decision: Grant Permission
14 Oct 2014
Decision due
15 Oct 2014
Grant issued
24 Nov 2014
Application Details
- Location
- Greenhills Road Extension & Tallaght Bypass (N81), Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 8000 ha
- Floor Area
- 2805.3 sq m
- Residential Units
- 32
Timeline
- Registration Date
- 21 August 2014
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 14 October 2014
- Grant Date
- 24 November 2014
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Revisions to existing approved and substantially constructed development Reg. Ref. SD06A/0107 to include : Block A - change of use from previously approved and constructed office use (414sq.m.) at upper basement and (200.6sq.m.) at ground floor level and the provision of new residential units within the existing building envelope to consist of 4 no. 1 bed live work units at the upper basement level and 2 no. 1 beds & 1 no. 2 beds apartments at the ground floor and 19 no. associated storage rooms at upper basement along with revised elevation treatment and associated siteworks; Block B - change of use from previously approved and constructed creche use (278.2sq.m.) at ground floor level and the provision of new residential units within the existing building envelope to consist of 2 no. 1 beds and 2 no. 2 beds along with revised elevation treatment and associated siteworks; Block C - change of use from previously approved and constructed retail use (128sq.m.) at ground floor level and the provision of 1 no. 3 bed unit within the existing building envelope; change of use from previously approved office use (478sq.m.)/retail use (165sq.m) at first floor, second floor office use (731sq.m.) and third floor office use (643sq.m.) level and the provision of new residential units within the existing building envelope to consist of 18 no. 2 beds and 3 no. 1 beds and associated 5 no. storage rooms at each level, along with revised elevation treatment and associated siteworks; provision of photovoltaic panels to the roof level.
Site bordered by the Tallaght Road, Greenhills Road Extension & the Tallaght Bypass, Dublin 24
For the construction of a residential and office mixed use development of a total of 41,285 Sq.m and demolition of existing structures containing retail on a 1,292 Ha site bordered by the Tallaght road, the proposed Greenhills road extension and the Tallaght bypass and comprising of 4 buildings: Block A: a part 8 storey part 10 storey office block totalling 7961 Sq.m: Block B: a 4 storey office block totalling 4854 Sq.m Block C: a 3 storey office block totalling 3632 Sq.m all over a 2 storey part underground part overground basement carpark totalling 13540 Sq.m providing 427 number parking bays with vehiclar and pedestrian access from the existing Fox's Covert carpark to the East and new access road to the West of the proposed Greenhills road extension Block D: a 3 storey stepping to 5 storey residential building of 11298 Sq.m total comprising 10 three bedroom penthouse units, 49 two bedroom and 25 one bedroom apartments, 3 retail units of 285 Sq.m in total with 85 car parking bays in a single level basement carpark;complete with associated landscape works and access road.
Corners of Tallaght Road,proposed Greenhills Road extension and Tallaght , Bypass, Tallaght.
Revisions to existing approved development S01A/0211. Revisions include: (1) omission of proposed Block A, Block B, Block C and Block E; (2) revised basement and site layout consisting of the following development: (3) Block A: A 5 storey part 8 storey with recessed penthouse residential building ranging in height from 17.75m to 28.3m over double basement comprising of 21 no. 1 bed and 38 no. 2 bed apartments ranging in area from 50sq.m. to 89sq.m. with projected balconies ranging in size from 5.3sq.m. to 12.5sq.m. (4) Block B: A 5 storey recessed penthouse residential building with a 312sq.m. creche at ground floor level, ranging in height from 17.75m to 19.975m over double basement comprising of 13 no. 1 bed, 32 no. 2 bed and 1 no. 3 bed apartments ranging in area from 50sq.m. to 110sq.m. with projected balconies ranging in size from 5.3sq.m. to 12.5sq.m. (5) Block C: A 3 storey part 4 storey with recessed penthouse mixed use building consisting of office, retail and residential ranging in height from 12.2m. to 17.2m over double basement with 2138sq.m. retail consisting of 5 no. units at ground floor comprising of: Retail no. 1 with floor to floor height of 3.5m with gross floor area of 1404sq.m. including storage with docking bay accessed off existing surface car parking off Village Green Road at ground floor and staff canteen at first floor; Retail No. 2 with floor to floor height of 6.65m with gross floor area of 217sq.m. including mezzanine of 90sq.m; Retail No. 3 with floor to floor height of 6.65m with gross floor area of 224sq.m. including mezzanine of 90sq.m; Retail No. 4 with floor to floor height of 6.65m with gross floor area of 90sq.m. including mezzanine of 31sq.m; Retail no. 5 with floor to floor height of 6.65m with gross floor area of 90sq.m. including mezzanine of 31sq.m., 2331sq,.m. office over 3 levels over retail, 3 no. 2 bed duplex, 13 no. 1 bed, 26 no. 2 bed and 3 no. 3 bed apartments ranging in area from 50sq.m. to 110sq.m. with projected balconies ranging in size from 5.3sq.m. to 22.5sq.m; a roof garden above retail at first floor of 580sq.m; (6) revisions to part underground part over ground basement car park consisting of a reduction in area from 6664sq.m. to 6524sq.m. and an increase in number of car parking bays from 171 no. to 175 no. car parking bays providing 160 no. retail car parking bays and 15 no. creche car parking with the addition of 403sq.m. office space at the corner of Greenhills Road extension and Tallaght Bypass accessed off Greenhills Road Extension with vehicular and pedestrian access from the existing Village Green Road and Greenhills Road Extension; (7) Revisions to lower underground basement carpark with an increase in area from 3788sq.m. to 6914sq.m. and an increase in number of carparking bays from 125 no. car parking bays to 212 no. carparking bays providing for 62 no. office carparking bays and 150 no. residential carparking bays; (8) A 2m high wall screening existing car parking at northwestern boundary of site from proposed public square complete with associated landscape works. (9) Revised ramp accessed off Greenhills Road extension onto pedestrian walkway
Site bordered by the Tallaght Road Greenhills Est. & the Tallaght Bypass, Co. Dublin.
Construction of a residential , retail and office mixed use development of a total of 19,729sqm plus a basement carpark of 13,540sqm comprising of 5 buildings; Block A; a part 4 storey part 6 storey office block totalling 3,574sqm; Block B: a part 3 storey, part 5 storey office block totalling 2,799sqm with enclosed atrium totalling 260sqm all over a 2 storey part underground part overground basement carpark totalling 7008sqm providing 225 number parking bays with vehicular and pedestrian access from the new proposed Green- hills road extension; Block C: a 2 storey retail and restaurant block totalling 3824sqm all over a part underground part overground basement carpark totalling 3487sqm providing 171 number parking bays with vehicular and pedestrian access from the existing Village Green Road; Block D: a 3 storey stepping to 5 storey residential building of 8170sqm total comprising 10 three bedroom penthouse units, 50 two bedroom and 25 one bedroom apartments, 3 retail units of 285sq.m in total with 85 car parking bays in a single level basement carpark of 3045sqm all located on the Main Road and Greenhills road extension; Block E: a 2 storey bar/retail building totalling 1102sqm with 65 surface car parking bays complete with associated landscape works, and demolition of existing structures containing retail units on 1.817 Ha site.
Corners of Tallaght Rd, Proposed Greenhills Rd Extension andTallaght Bypass, , Tallaght, Dublin 24.
Addition of Plant Room, Plant Enclosure and access stairs to roof of existing approved development; Planning REF no. SD06A/0107 (An Bord Pleanala REF no. PL06S.217573) comprising 47.5 square metre plant room and 28.2 square metre plant enclosure to roof of Block C (New Bancroft Centre). The height of the new structure is to be 2.975M.
Bordered By The Tallaght Road, Greenhills Road Extension, Tallaght Bypass, Co. Dublin
Provision of an ancillary off-license sales area of c. 63.61 sq.m in the ground floor retail unit.
Retail Unit 1, Block C, New Bancroft Centre, Greenhills Road, Tallaght, Dublin
Revisions to existing approved development Reg. Ref. S01A/0211:- (1) omission of proposed Block A, Block B, Block C and Block E; (2) revised basement and site layout consisting of the following (3) Block A: A 5 storey part 8 storey with recessed penthouse residential building ranging in height from 17.75m to 28.3m over double basement comprising of 21 No. 1 bed and 38 No. 2 bed apartments ranging in area from 50 sq.m. to 89 sq.m. with projected balconies ranging in size from 5.3 sq.m. to 12.5 sq.m; (4) Block B: A 5 storey with recessed penthouse residential building with a 312 sq.m. creche at ground floor level, ranging in height from 17.75m to 19.975m over double basement comprising of 13 No. 1 Bed, 32 No. 2 Bed and 1 No. 3 Bed apartments ranging in area from 50 sq.m. to 110 sq.m. with projected balconies ranging in size from 5.3 sq.m. to 12.5 sq.m; (5) Block C: A 3 storey part 4 storey with recessed penthouse mixed use building consisting of office, retail and residential ranging in height from 12.2m to 17.2m over double basement with 2138 sq.m. retail consisting of 5 no. units at ground floor comprising of retail No. 1 with floor to floor height of 3.5m with gross floor area of 1404sq.m. including storage with docking bay accessed off existing surface car parking off Village Green Road at ground floor and staff canteen at first floor, retail No. 2 with floor to floor height of 6.65m with gross floor area of 217 sq.m. including mezzanine of 90 sq.m., retail no. 3 with floor height of 6.65m with gross floor area of 224 sq.m. including mezzanine of 90 sq.m., retail No. 4 with floor to floor height of 6.65m with gross floor area of 90 sq.m. including mezzanine of 31 sq.m., retail No. 5 with floor to floor height of 6.65m with gross floor area of 90 sq.m. including mezzanine of 31 sq.m., 2331 sq.m. office over 3 levels over retail, 3 no. 2 bed duplex, 13 no. 1 bed, 26 no. 2 bed and 3 no. 3 bed apartments ranging in area from 50 sq.m. to 110 sq.m. with projected balconies ranging in size from 5.3 sq.m. to 22.5 sq.m; a roof garden above retail at first floor of 580 sq.m; (6) revisions to part underground part over ground basement car park consisting of a reduction in area from 6664 sq.m. to 6524 sq.m. and an increase in number of car parking bays from 171 no. to 175 no. car parking bays providing 160 no. retail car parking bays and 15 no. creche car parking with the addition of 403 sq.m. office space at the corner of Greenhills Road Extension and Tallaght By-Pass accessed off Greenhills Road Extension with vehicular and pedestrian access from the existing Village Green Road and Greenhills Road Extension; (7) revisions to lower underground basement car park with an increase in area from 3788 sq.m. to 6914 sq.m. and an increase in number of car parking bays from 125 no. car parking bays to 212 no. car parking bays providing for 62 no. office car parking bays and 150 no. residential car parking bays; (8) a 2m high wall screening existing car parking at northwestern boundary of site from proposed public square complete with associated landscape works; (9) revised ramp accessed off Greenhills Road Extension onto pedestrian walkway.
Site bordered by the Tallaght Road Greenhills Extension and the Tallaght Bypass, Co. Dublin.
Change of use for part of previously approved retail unit (SD06A/0107) from retail to retail and off licence sales area.
Unit 1, The Bancroft Centre, Greenhills Road, Tallaght, Dublin, 24
The development will consist of the change of use of the permitted vacant childcare facility, located in the upper basement level of Block A, with a GFA of 246 sq., and associated outdoor space (110 sq.), to Doctors Surgery and Pharmacy use or Gymnasium and Health Studio use. The proposal includes associated elevational changes, revised entrance doors, external signage and internal reconfigurations, resulting in a proposed GFA of 260.8 sq. The adjacent outdoor area (85.8 sq.) will be a breakout space for the uses proposed. The proposal includes the reallocation of 7 no. existing car parking spaces for the uses proposed and replacement of 2 no. existing car parking spaces with cycle parking at the upper basement level, and all associated development.
Block A, New Bancroft Centre, Greenhills Road Extension, Tallaght Bypass, Tallaght, Dublin 24
Change of use of Unit 3 from retail use at ground and first floor level to takeaway restaurant, including ancillary seating area and back of house areas at ground and first floor level and associated signage.
Unit 3, Block C, Bancroft Centre, Greenhills Road Extension & Tallaght Bypass, Tallaght, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?