Limekiln Farm & St. Peters School, Limekiln Road, Greenhills, Dublin 12
Grant Permission & Grant RetentionPlanning application SD15A/0027
Dublin - South Dublin County Council
Proposed Development
14 new residential units of 3 to 4 bedrooms as follows: 4 detached 4 bedroom residential units; 10 semi-detached residential units; breakdown comprises of 2 no. 3 bedroom units and 8 no. 4 bedroom units; all associated site works for the houses including new boundary walls, associated car parking and boundary treatment; a new pedestrian and vehicular access Limekiln Farm (Limekiln Road) is proposed, all with proposed landscaping, new playground area and associated new boundary treatment. Retention is also sought for the existing circa 2.4m high block and capped boundary wall located along the eastern and southern boundary of the site.
View the full application file on the council's planning portal →Application Timeline
Further information requested
31 Mar 2015
Application received
24 Jun 2015
Further information received
24 Jun 2015
Decision: Grant Permission & Grant Retention
17 Jul 2015
Decision due
21 Jul 2015
Grant issued
24 Aug 2015
Application Details
- Location
- Limekiln Farm & St. Peters School, Limekiln Road, Greenhills, Dublin 12.
- Applicant
- N/A
- Application Type
- Permission and Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 5972 ha
- Floor Area
- 2440 sq m
- Residential Units
- 14
Timeline
- Registration Date
- 24 June 2015
- Status
- Officer Allocation
- Decision
- Grant Permission & Grant Retention
- Decision Date
- 17 July 2015
- Grant Date
- 24 August 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of sub division wall.
St. Peters National School, Limekiln Road, Dublin 12.
The demolition of the existing 3 storey school building and the construction of 46 no. apartments all above basement level, comprising 6 no. 1 bed units and 39 no. 2 bed units and 1 no. 3 bed units in 5 no. blocks as follows: Blocks 1 and 2 located along Temple Manor Avenue consists of 2 storey building containing 16no. 2 bed apartments, with balconies facing Temple Manor Road and landscaped courtyard; Block 3 consists of 3 storey block containing 4no. apartments consisting of 3no. 2 beds and 1 no. 3 bed with basement car parking access and balconies facing the internal courtyard and south, Block 4 and 5 located along the school boundary consists of 3 storey blocks containing 26no. apartments containing 6 no. 1 beds, 20 no. 2 beds with balconies facing north and south. Basement parking containing 82 no. car spaces and 3no. at ground floor. Refuse areas, cycle storage, plant equipment, are located at basement level, pedestrian and vehicular access off Limekiln farm together with an ESB substation, security access gates, landscaped courtyard together with all associates site works and boundary treatments.
Temple Manor Avenue, Off Limekiln Farm & St. Peters School, Greenhills, Dublin 12
Demolition of the existing 3 storey school building and the construction of 30 no. dwellings which are broken down into 5 blocks A, B, C, D and E all above basement as follows: Block A consists of a 3 storey block containing a total of 5 no. apartments as follows- 4 no. 3 bed & 1 no. 2 bed apartments with dormer windows facing north-east & south-west; Block B consists of a 4 storey block containing, 7 no. apartments consisting of 6 no. 2 bed apartments and 1 no. 3 bed apartment which is incorporated within the roof with dormer windows facing north-east & south-west; Block C consists of a 4 storey block containing 7 no. apartments consisting of 6 no. 2 bed apartments and 1 no. 3 bed apartment which is incorporated within the roof with dormer windows facing north-west and south-east; Block D consists of 9 no. 3 storey terrace houses consisting of 9 no. 3 bed with balconies; Block E consists of a 4 storey block containing 2 no. 4 bed houses with the fourth floor incorporated within the roof and dormer windows facing north-east & south-west; basement level consists of 44 no. car parking spaces, plant room, attenuation tank, and lift & stairs for access to the courtyard and access to Block E; ground level consists of 7 no. car spaces, refuse storage and bicycle storage located to the south-east of the site and covered lift and staircase for access to the basement located in the courtyard, together with an E.S.B. substation facing south-west with pedestrian and vehicular access off Limekiln Farm Road with security gates all with proposed landscaped courtyard, boundary treatment and site development works.
Temple Manor Avenue off Limekiln Farm & St. Peters School, Greenhills, Dublin 12.
Modifications to the development previously permitted under Reg. Ref. SD15A/0027. The proposed developments shall provide for the construction of three additional three storey 4 bed houses (c.140.2-143.3sq.m) (all with associated balconies at second floor level and rear gardens at ground floor level), site works and alterations to underground services. The proposed development will result in 14 units in total on the subject site.
Limekiln Farm & St. Peters School, Limekiln Road, Greenhills, Dublin 12.
Double-storey extension to side and rear,single storey extension to rear,and Velux roof light to front.
40 Temple Manor Court, Walkinstown,Dublin 12.
Demolition of the existing school hall and the construction of a new school hall area 408sq.m. to include a mezzanine, office floor, wc facilities, changing rooms, stage, covered walkway connecting to existing school, all with associated site works & boundary & landscaping.
St Peter's Boys School, Limekiln Road, Greenhills, Walkinstown, Dublin 12
Single storey prefabricated building containing a classroom of 79.5sq.m. and two special education teaching rooms of 14.5sq.m. each and associated site works. The new single storey prefabricated building is proposed to be located in front of the Riverview Educate Together school entrance to the north-west.
Limekiln Road, Greenhills, Dublin 12
Single storey prefabricated building containing three classrooms of 79.8sq.m each; the new single storey prefabricated building is proposed to be located on the north corner of the site along with associated ground works.
Limekiln Road, Greenhills, Dublin 12
Single storey prefabricated building containing three classrooms of 79.8sq.m each; the new single storey prefabricated building is proposed to be located on the north corner of the site along with associated ground works.
Limekiln Road, Greenhills, Dublin 12
New single storey prefabricated building containing three classrooms of 62.3sq.m each and clinical office suite of 165sq.m and the renovation of the existing school building (excluding the rooms and external play area currently being used by Riverview Educate Together) for temporary use by Setanta Special School at Saint Peter’s School, Limekiln Road, Greenhills, Dublin 12. The new single storey prefabricated building is proposed to be located on the north west corner of the site along with associated ground works. The proposed renovation works are to consist of a new 2 storey lift and escape stairs on the north east elevation, the removal of existing windows and double doors in the existing stair core and the addition of a new first floor window and new ground floor double doors on the south east elevation of the existing stair core, a new external door from a classroom on the north west elevation, new escape double doors from the hall on the north west elevation, new wheelchair ramps at the main entrance, the existing escape stairs and to the two playgounds, new fences to enclose playgounds, new road markings for parking and minor ground works.
Saint Peter's School, Limekiln Road, Greenhills, Dublin 12
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?