← Back to search

Holy Spirit Senior Primary School, Greenhills, Walkinstown, Dublin 12

Granted

Planning application SD16A/0218

Dublin - South Dublin County Council

Proposed Development

Single storey extension and alterations to existing school including all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jun 2016

  2. Decision due

    16 Aug 2016

  3. Decision: Grant Permission

    16 Aug 2016

  4. Grant issued

    22 Sept 2016

Application Details

Location
Holy Spirit Senior Primary School, Greenhills, Walkinstown, Dublin 12
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
12500 ha
Floor Area
470 sq m

Timeline

Registration Date
22 June 2016
Status
Decision
Decision
Grant Permission
Decision Date
16 August 2016
Grant Date
22 September 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD16A/0391Granted14 Nov 2016

Amendment to previously granted planning permission (ref. SD16A/0218) incorporating alterations to layout plan and external facade of building.

Holy Spirit Senior Primary School, Greenhills, Walkinstown, Dublin 12

14m
S01A/0146Granted9 Apr 2001

2 storey extension to the rear, to accommodate a disability access lift

St. Paul's Senior Primary School, Greenhills, Walkinstown, Dublin 12.

72m
SD16A/0396Granted15 Mar 2017

Two storey extension and alterations to existing school including all associated site works.

Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12

72m
SD16A/0396/EPGrant Extension of Duration of Permission27 Jul 2022

Two storey extension and alterations to existing school including all associated site works.

Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12

72m
SD24A/0211WGrant Permission & Grant Retention4 Sept 2024

Retention planning permission and planning permission for development at Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin12. The development will consist of : (1) Retention of existing single storey prefabricated classroom building including all associated site works. (Planning Reference: SD17A/0184 (2) Planning permission to retain the temporary prefabricated classroom building including all associated site works as granted under planning reference SD17A/0184 for a further period of 5 years.

Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12, D12V880

73m
SD17A/0184Granted14 Jun 2017

Installation of four single storey temporary prefabricated classroom buildings including all associated site works.

Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12

89m
SD22B/0452Granted14 Oct 2022

Extension at first floor level to side above existing garage / utility comprising of 19.5sq.m including extending existing tiled roof; Extend 7sq.m to existing ground floor kitchen extension to rear (Reg. K-829 July 1976); Provide access to attic for additional wc / shower, inline roof lights and playroom; Porch to front 2.5sq.m with lean to tiled roof extending to cover garage door; Widen vehicle entrance to 3.5m to allow for access for 2 off-road parking spaces.

38, Fernhill Road, Dublin 12

90m
SD04B/0414Granted6 Oct 2004

Single storey extension to rear, conversion of domestic garage at the side to a study with a semi-dormer first floor above accommodating a bedroom and bathroom and alterations to front facade to include a tiled overhang over entrance and windows.

40, Fernhill Road, Dublin 12

93m
SD19B/0099Granted15 Mar 2019

Demolition of single storey converted garage; single storey extension to front; 2 storey extension to side; single storey extension to rear; all associated windows and site works.

28, Fernhill Road, Manor Estate, Terenure, Dublin 12

93m
SD25B/0132WGranted12 Mar 2025

The proposed development will consist of the demolition of the existing side extension, internal alterations to existing ground and first floor levels, the construction of a part single-storey and part two-storey extension to the rear and side of the existing dwelling, alterations to the existing materiality and fenestration details to the existing dwelling, the construction of a new garden studio to accommodate a home office, gym and bathroom, along with alterations to the existing vehicular entrance, all along with associated landscaping, ancillary and site works.

28, Fernhill Road, Manor Estate, Terenure, Dublin 12

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?