Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
GrantedPlanning application SD16A/0379
Dublin - South Dublin County Council
Proposed Development
Construction of a new single storey security building, relocation of vehicular entrance gates and all associated site services.
View the full application file on the council's planning portal →Application Timeline
Further information requested
16 Dec 2016
Application received
21 Dec 2016
Further information received
21 Dec 2016
Decision: Grant Permission
24 Jan 2017
Decision due
26 Jan 2017
Grant issued
6 Mar 2017
Application Details
- Location
- Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 511 ha
- Floor Area
- 21.1 sq m
Timeline
- Registration Date
- 21 December 2016
- Status
- Officer Allocation
- Decision
- Grant Permission
- Decision Date
- 24 January 2017
- Grant Date
- 6 March 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The change of use from warehouse to data repository facility, alterations to external facades, provision of a new 1100mm parapet, reclad roof, internal alterations, refurbishment of the existing office space, solar panels at roof level, external plant at ground and roof levels and equipment to include 12 condenser modules, an emergency back-up generator and associated fuel storage tank, transformer, extension to the existing sub-station (c. 13sq.m), 2 sprinkler tanks and pumphouse, bin store, 22 parking spaces including 2 electrical vehicle charging points, bicycle parking shelter, landscaping, planting, new security fence, external lighting, CCTV, altered vehicular gates, permeable hard surfaces, alterations to internal foul sewerage and water supply networks, provision of SuDS compliant surface water drainage system and all associated site works.
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
Whether the use of the building as a data repository facility with associated internal alterations is, or is not exempted development
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
Elevation changes including the installation of new high level windows to the south-western, south-eastern and north-eastern elevations of the warehouse building and the installation of an external fire escape door to the north-western elevation of the warehouse building; the works are to include all necessary building and site works.
Unit 1, M50 Business Park, Ballymount, Dublin 12.
Change of use of c.12.25sq.m of floorspace within the existing warehouse building on site, from warehouse use to use for the temporary storage of shredded electrical & electronic equipment and components.
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12
Revision to approved plans (Ref S98A/0223) for the addition of 80 sq.m to office area within the building envelope of three terraced single storey warehouses and double storey offices.
off Ballymount Road Upper, Ballymount, Dublin 12.
The construction of new 1330sq.m warehouse extension with ancillary trading area, canteen, offices, staff site entrance, reconfiguration of existing car park and other associated minor site works to existing 4569sq.m warehouse with existing ancillary showrooms and offices (including limited telemarketing use).
M50 Business Park, Ballymount Road Upper, Ballymount, Dublin 12
The reconfiguration of 47No existing staff car parking spaces to allow for safer movement of vehicles and temporary storage of materials elsewhere in the existing yard, including new staff vehicular and pedestrian entrances and other associated minor works which are similar to what is currently permitted as part of a more substantial development Reg Ref SD19A/0222
Former Exertis Ireland Ltd Premises, M50 Business Park, Ballymount Road Upper, Ballymount, Dublin 12
Construction of new 1269sq.m warehouse extension with ancillary trading area; offices; staff site entrance; reconfiguration of existing car park and other associated minor site works to existing 4569sq.m warehouse with existing ancillary showrooms and offices (including limited telemarketing use).
M50 Business Park, Ballymount Road Upper, Ballymount, Dublin 12
Internal alterations including 143 sq.m enlargement of existing first floor office area.
Unit 3, M50 Business Park, Ballymount, Dublin 12
Retention of two free standing signage units to front and rear of premises and for retention of fascia signage over entrance doors.
Unit 3, M50 Business Park, Ballymount, Dublin 12.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?