Huntsman House, Ballymount Cross Industrial Estate, Dublin 24
Invalid ApplicationPlanning application SD18A/0160
Dublin - South Dublin County Council
Proposed Development
(a) Reconfiguration of internal floor arrangement of industrial building from 2,100sq.m. of light industrial unit to 1,886sq.m; 154sq.m. of ancillary offices on 2 floors with 39sq.m. of staff facilities to 328sq.m of offices with 251sq.m. of staff facilities. 189sq.m. of mezzanine storage to 43sq.m. The reconfiguration comprises: (1) change of use of: light industrial area to office/staff facilities area (224sq.m) and office/staff facilities to light industrial area (10sq.m) at ground level; mezzanine to office/staff facilities (155sq.m.) and light industrial area (33sq.m) at first floor level; office/staff facilities to light industrial area (8sq.m). (2) and provision of new office/staff facilities and mezzanine (72sq.m.) within the previous granted industrial building footprint (total revised area 502sq.m). (b) elevation revisions associated with the floor plan/layout adjustments including rearrangement of fire doors & addition of a third level entry goods door to the east elevation. (c) site plan revisions including access adjustments to provide 1 access/egress gate for HGV’s and cars as opposed to previous proposed 2 access/egress plus minor drainage alterations.
View the full application file on the council's planning portal →Application Timeline
Application received
10 May 2018
Decision: Invalid Application
15 Jun 2018
Decision due
4 Jul 2018
Application Details
- Location
- Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 4900 ha
- Floor Area
- 502 sq m
Timeline
- Registration Date
- 10 May 2018
- Status
- Decision
- Decision
- Invalid Application
- Decision Date
- 15 June 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of remaining part of fire damaged building originally 2,473sq.m (10m high) and construction of proposed warehousing unit of a similar footprint as follows; Partial demolition includes; removal of 1,382sq.m of remaining warehouse structure; reinstatement of 2,481sq.m of new warehouse unit which includes 189sq.m of mezzanine storage, 154sq.m of ancillary offices on 2 floors, 2100sq.m of light industrial and 39sq.m of staff facilities. New works include drainage, landscaping and relocation of access from internal estate road Ballymount Cross Industrial Estate Road. Site boundaries remain unaltered.
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
Erection of signs on north east and south west elevations of building; the sign on the south west elevation to be illuminated; existing signs and logos to be removed.
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
Erect 2 non-illuminated coloured advertising signs: panel sign located at 5.75m above ground level (below parapet level), at 9.00m high southwest elevation of building level and will replace the existing temporary mesh banner: main sign to blockwork 6.5m approx. above ground level (below parapet level) to the existing 11.15m high southwest elevation.
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
Alterations to Reg. Ref. SD16A/0216 which involved demolition of remaining part of fire damaged building and the construction of a warehousing unit which is now being revised. The alterations comprise: (A) Reconfiguration of internal floor arrangement of Industrial building from -2,100sq.m. of light industrial unit to 1,973sq.m; 154sq.m of ancillary offices on 2 floors with 39sq.m of staff facilities to 220sq.m of offices with 188sq.m of staff facilities; 189sq.m of mezzanine storage to 43sq.m. The above reconfiguration comprises: (1) change of use of light Industrial area to office/staff facilities area (75sq.m) and office/staff facilities to light industrial area (10sq.m.) at ground level; mezzanine to office/staff facilities (78sq.m) and light industrial area (110sq.m) at first floor level; office/staff facilities to light industrial area (8sq.m). (2) Provision of new staff facilities area (15sq.m) and mezzanine (43sq.m) within the previous granted industrial building footprint (total revised area 339sq.m). (B) Elevation revisions associated with the floor plan/layout adjustments including rearrangement of fire doors and level entry goods door to the east elevation, removal of a dock leveller to the rear elevation and change of cladding type and colour on all sides of the building. (C) Site plan revisions including access adjustments to provide 2 access/egress gate for HGV’s and cars as opposed to previous proposed separate access/egress for HGV’s and cars and 1 pedestrian gate plus minor drainage alterations. Site boundary and height of the proposed industrial unit is not affected by this altered proposal.
Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with all ancillary services and associated site works.
The footpath adjacent the premises occupied by Schoolwear House, Ballymount, Co. Dublin
To retain the existing 45 metre high telecommunications support structure (previously granted permission under reference SD11A/0002 which was a temporary permission for a period of 5 years which has expired) carrying antennas and a link dishes together with ground based equipment and security fencing.
Block C, Ballymount Cross Industrial Estate, Dublin 24
Retention of existing 45 metre high telecommunications support structure carrying antennas and link drums/dishes all enclosed in security fencing and associated cable gantry.
Block C, Ballymount Cross Industrial Estate, Dublin 24
Replace the existing permitted 24m monopole structure, Planning Ref. S98A/0492 with a 45m monopole structure carrying the following: Existing Equipment Schedule: GSM Panel Antennas:9 x 2.5m high Radio Links: 24 no. as follows: 11 x 0.3m diam. 9 x 0.6m diam, 1 x 0.8m diam 3 x 1.2m diam. Planned Equipment Schedule: GSM Panel Antennas 3 x 1.3m high. Radio links 26 no. UMTS links as follows 15 x 0.3m diam. 11 x 0.6m diam. 6 no. high capacity (SDH) links as follows 2 x 1.8m diam and 2 x 0.8m diam. The proposed development is to provide a transmission hub site on 02's national telecommunications ring in addition to providing GSM and UMTS service to the area.
Block C, Ballymount Cross Industrial Estate, Dublin 24
Replace the existing permitted 24m Monopole structure, Planning Ref. SD98A/0492 with a 45m Monopole structure carrying the following: Existing Equipment Schedule GSM Panel Antennas: 9x2.5m high Radio links:24 No. as follows 11x0.3m diam, 9x0.6m diam, x0.8m diam, 3x1.2m diamPlanned Equipment Schedule GSM Panel Antennas:3x1.3m high Radio links, 26 No. UMTS links as follows:15x0.3 diam, 11x0.6m diam, 2x1.8m diam, 2x1.2m diam and 2x0.8m diam. The proposed development is to provide a transmission hub site on O2's national telecommunications ring in addition to providing GSM and UMTS service to the area.
Block C, Ballymount Cross Industrial Estate, Dublin 24
Conversion of first floor to office use and new side entrance.
Unit D1, Ballymount Cross Industrial Estate, Dubli
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?