Monastery Road, Clondalkin, Dublin 22

Granted

Planning application SD19A/0063

Dublin - South Dublin County Council

Proposed Development

Addition of a recycled asphalt pavement (RAP) plant to the existing asphalt plant on a 3.0 hectare site within the company's existing landholding; the proposed RAP plant comprises a RAP cold feed bin (hopper); a RAP collecting conveyor; an inclined (rising) conveyor; a RAP buffer silo with belt feeder; a RAP weighing conveyor and a dedicated chute and ducting system connecting to the existing asphalt plant; the proposed development will not result in any change in existing working hours or current production rates; recycled bituminous material to be supplied to the RAP plant will be stored at an existing storage shed at the application site.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Feb 2019

  2. Decision: Grant Permission

    18 Apr 2019

  3. Decision due

    23 Apr 2019

  4. Grant issued

    28 May 2019

Application Details

Location
Monastery Road, Clondalkin, Dublin 22
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
30000 ha

Timeline

Registration Date
27 February 2019
Status
Decision
Decision
Grant Permission
Decision Date
18 April 2019
Grant Date
28 May 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

63m
SD16A/0200Refused7 Jun 2016

Construction of 24 new houses at lands facing Knockmeenagh Lane and to the rear of No. 13, 15 & 16 St. Brigid’s Cottages with 20 of the units being accessed from Knockmeenagh Lane and 4 being accessed from St.Brigid’s Cottages. The development consists of 12 three bedroom, three storey dwelling (107sq.m) and 12 two bedroom, two storey dwellings (86sq.m) with private amenity space, off street parking, public open space, footpaths, proposed widening of Knockmeenagh Lane and all associated site works necessary to facilitate the development.

Knockmeenagh Lane, Dublin 22

78m
SD17A/0196Granted20 Jun 2017

Construction of a stone and aggregate containment enclosure to cover currently exposed stockpiles and all associated site works.

Monastery Road, Clondalkin, Dublin 22.

83m
SD22B/0273Granted14 Jun 2022

Construction of a single storey flat roof and double pitch slope roof extension to the rear of existing dwelling; Internal & Elevational alterations to the existing house; New off-street parking; New landscaping, boundary fencing, drainage and associated site works

13, Saint Brigid's Cottages, Dublin 22, D22DT21

95m
SD13A/0054Granted27 Mar 2013

A set of powered sliding gates, new traffic island and revised kerb layout on the entrance roadway within the SIAC head office site to control vehicular access.

Dolcain House, Monastery Road, Clondalkin, Dublin 22

105m
SD19B/0101Granted15 Mar 2019

Construction of a 35sq.m. single storey family flat to the rear.

14A, St Brigids Cottages, Clondalkin, Dublin 22

110m
S99A/0210Granted30 Jul 1999

Dormer bungalow at side and revised vehicular entrance.

11 St. Brigids Cottages, Clondalkin, Dublin 22.

120m
SD19A/0246Request Additional Information1 Aug 2019

2 storey building to provide 4 2-storey, 3 bedroom houses (2 centre terraced houses and 2 end of terrace houses) along with new vehicular entrance off St Brigid's Cottages and all associated car parking, landscaping and site development works.

12, St Brigid's Cottages, Naas Road, Clondalkin, Dublin 22, D22 VX77

122m
ED18/0002Declared Not Exempt5 Feb 2018

It is proposed to carry out an Energy Retrofit under 'The Better Energy Homes Scheme', to install external wall insulation to the front facade, gable wall and to parts of the rear facade. There is an extension to the rear that will not be insulated. The Insulation will be a depth of 110mm with a plain acrylic finish.

9, St. Bridget's Cottages, Bushelloaf, Dublin 22

141m
SD10A/0064Granted11 Aug 2010

10 year permission for a mixed use development comprising commercial (non-retail) use (c. 24259sq.m. gfa), 6 no. retail units (c. 1764sq.m. gfa), a crèche (c. 765sq.m. gfa), a cafe/restaurant (c. 400sq.m.), a management office suite (c. 111sq.m. gfa) and 380 no. residential units, all of which is to be accommodated in 18 no. blocks ranging in height from 2 to 8 storeys. Commercial (non-retail) uses to include general enterprise, medical and office based services coming under the definition of Class 2, 3 & 8 of the Planning and Development Regulations 2001, in Blocks A1, A2, B1, C, D1, D2 and E. 1 no. retail unit measuring c. 316sq.m. gfa is located at ground floor level in Block A2 and 5 no. retail units measuring c. 110sq.m., c. 450sq.m., c. 312sq.m., c. 220sq.m. and c. 356sq.m. gfa each are located at ground floor level in Block B2. The proposed crèche is located at ground floor level in Block D1. The proposed cafe is located at ground and first floor level in Block E. The proposed management office suite, to be made available also as a communal space for local residents is located at ground floor in Block E. Residential units are accommodated in Blocks B2, D3, E, F1, F2, G1, G2, H, J, K1, K2 & K3 and comprise 76 no. 3-bed duplex units, 51 no. 3-bed apartment units, 1 no. 2-bed duplex unit, 237 no. 2-bed apartment units and 15 no. 1-bed apartment units. All associated site development and ancillary works, including demolition of 2 no. habitable dwellings (nos. 13 & 15 St. Brigid's Cottages); dismantling of other existing non-residential structures on site, vehicular access via 1 no. existing site entrance with modifications to the roundabout junction on Monastery Road that provides access to the former quarry area and existing SIAC HQ building form its southwestern arm and to Woodford Hill from its northeastern arm and 1 no. new left-in, left-out site entrance opposite Monastery Gate Avenue; 1440 no. basement car parking spaces including the replacement of 67 no. existing spaces serving Dolcain House (SIAC HQ building) and 97 no. surface spaces; signage; pedestrian and cycle routes; bicycle parking spaces; hard and soft landscaping and boundary treatments; foul and surface water drainage and water supply infrastructure, including 3 no. surface water attenuation tanks and an extension of a foul sewer approximately 1.7km north from the site, eastwards past the Monastery Gate housing estate and northwards along the western boundary of the M50 motorway to the Council's public sewer 9B adjacent to the Camac River; 1 no. wood pellet bio fuel boiler district heating system and supplementary natural gas boilers; 6 no. new and 1 no. replacement ESB substations and associated switch rooms; local bin stores, central compactors and waste storage areas; associated plant and storage areas on a site (c. 6.8ha, including c. 1.7ha sewer extension) at the SIAC HQ lands, Monastery Road and Knockmeenagh Lane and Nos. 13 & 15 St. Brigid's Cottages, Clondalkin. Significant Further Information: The principal changes relate to the scale, massing and layout of the proposed development, full details of which can be obtained by reference to the public planning file.

SIAC HQ, Monastery Road, Clondalkin, Dublin 22.

142m
SD05A/0983Granted7 Dec 2005

One and a half storey dormer type house at the rear with new entrance and access driveway.

10, St. Brigids Cottages, Naas Road, Clondalkin, Dublin 22.