89, Broomhill Road, Tallaght Industrial Estate, Tallaght, Dublin 24
GrantedPlanning application SD20A/0327
Dublin - South Dublin County Council
Proposed Development
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
10 Dec 2020
Decision due
12 Feb 2021
Decision: Grant Permission
12 Feb 2021
Grant issued
22 Mar 2021
Application Details
- Location
- 89, Broomhill Road, Tallaght Industrial Estate, Tallaght, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 7000 ha
- Floor Area
- 224 sq m
Timeline
- Registration Date
- 10 December 2020
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 12 February 2021
- Grant Date
- 22 March 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Warehouse extension (circa 87sq.m) at rear.
89, Broomhill Road, Tallaght Industrial Estate, Tallaght, Dublin 24
22.5sq.m. single storey extension to the existing reception area at the front of the unit; new powder coated composite cladding to the front elevation (south) and a portion of the side elevation (east); new fascia and forecourt signage and realignment of grass verge in the forecourt area.
89, Broomhill Road, Tallaght Industrial Estate, Dublin 24.
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
65-74, Broomhill Industrial Estate, Broomhill Road, Tallaght, Dublin 24
The widening of the car entrance to the site, installation of new bollards and creation of 4 additional car parking spaces with an area for and including 8 bicycle stands and all site development works, on a site of 0.3263 hectares.
63/64, Broomhill Drive, Tallaght, Dublin 24.
For construction of a new distribution warehouse incorporating two storey ancillary offices and showroom, with associated car parking, signage and site development works, all on a site of 0.3263 hectares.
63/ 64, Broomhill Drive, Tallaght, Dublin, 24
Change of use Unit 5 from warehouse (Class 5) and office (Class 3) to light industrial (Class 4) and office (Class 3). The development includes alterations to the eastern and western elevations which comprises the provision of additional windows; alterations to the internal layout of the unit, the extension of the first floor area from 179sq.m to 358sq.m and the provision of an ESB substation and associated plant machinery.
Unit 5, Broomhill Business Park, Broomhill Road, Tallaght, Dublin 24
Substation and switch room and the provision of three additional car parking spaces to serve Unit 5. The substation and switch room have a total gross floor area of 29.7sq.m. and are located adjacent to the eastern elevation of Unit 4. The three additional car parking spaces are located adjacent to the southern elevation of Unit 5.
Unit 5, Broomhill Business Park, Broomhill Road, Tallaght, Dublin 24
Change of use of part of ground floor warehouse area to office/showroom use.
Unit 5, Broomhill Business Park, Broomhill Road, Tallaght, Dublin 24.
Substation and switch room and the provision of three additional car parking spaces to serve Unit 5. The substation and switch room have a total gross floor area of 29.7sq.m. and are located adjacent to the western elevation of Unit 5, the three additional car parking spaces are located adjacent to the southern elevation of Unit 5.
Unit 5, Broomhill Business Park, Broomhill Road, Tallaght, Dublin 24
Internal and external material alterations to consist of (a) revised layout and increased office space to ground floor from 49sq.m. (includes rest rooms) to 112sq.m. (includes rest rooms) and provision of new rest rooms; (b) change of use of first floor level from office to open plan mezzanine storage space and increased area from 49sq.m. to 139sq.m; (c) existing entrance door to west elevations be blocked up with new entrance door provided behind existing large roller shutter to same elevation; (d) installation of new fire escape door to north elevation; (e) increased width and height of existing ope and installation of roller shutter to east elevation; (f) erection of 2 no. advertising signs to west elevation sign 1 at high level of 9495mm x 800mm, sign 2 low level of 1425mm x 930mm; (g) existing road surfaces to be resurfaced with black top surface finish.
62, Broomhill Drive, Broomhill Business Park, Tallaght, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?