← Back to search

8, New Bawn Park, Dublin 24

Grant Permission for Retention

Planning application SD20B/0398

Dublin - South Dublin County Council

Proposed Development

Retention of conversion from garage to utility room and removal of front wall.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Oct 2020

  2. Decision due

    17 Dec 2020

  3. Decision: Grant Permission for Retention

    17 Dec 2020

  4. Grant issued

    1 Feb 2021

Application Details

Location
8, New Bawn Park, Dublin 24
Applicant
N/A
Application Type
Retention
Planning Authority
South Dublin County Council
Site Area
238.5 ha
Floor Area
8.6 sq m

Timeline

Registration Date
23 October 2020
Status
Decision
Decision
Grant Permission for Retention
Decision Date
17 December 2020
Grant Date
1 February 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
S00B/0216Granted1 Jun 2000

Extension to side/rear of existing dwelling.

8 New Bawn Park, Dublin 24.

9m
SD06B/0837Granted8 Nov 2006

Second storey extension (c. 26sq.m.) with dormer window to front, 2 no. bay windows to replace existing windows at ground floor with porch roof over.

6, New Bawn Park, Tallaght, Dublin 24

18m
SD06B/0387Granted26 May 2006

Proposed removal of existing flat roof from ground floor partial front extension, ground floor side extension, partial rear extension and replacing with pitched roof.

4, New Bawn Park, Tallaght, Dublin 24

18m
SD25B/0161WRefuse Permission for Retention27 Mar 2025

Widening of existing vehicular access

12, Newbawn Park, Tallaght, Dublin 24, D24 N9YT

28m
S99B/0325Granted21 May 1999

Single storey extension to the side incorporating porch to front.

9 New Bawn Drive, Tallaght, Dublin 24.

28m
SD07B/0500Granted11 Jun 2007

First floor extension to side with dormer to front and two storey to rear.

9, New Bawn Drive, Dublin 24

30m
SD07A/0451Refused15 Jun 2007

Construction of a new 3 bedroomed detached house with velux rooflights to back and extended kitchen on ground floor complete with attic storeroom; also newly formed side passage on both sides of house and newly constructed boundary wall to front and side; this includes all associated site works and all services connected to existing.

2, New Bawn Park, Tallaght, Dublin 24

30m
SD08A/0210Refused31 Mar 2008

3 bedroom detached house with velux rooflights to back and extended kitchen on ground floor complete with attic storage room also newly formed side passage on both sides of house and newly constructed boundary wall to front and side including all associated site works and all services connected to existing.

2, New Bawn Park, Tallaght, Dublin 24

33m
SD08A/0057Granted25 Jan 2008

1 no. two storey three bedroom house to the side of the existing house with kitchen extension to rear with pitched roof. The construction will also include new porch and canopy over front window of the existing house.

31, Seskin View Drive, Old Bawn, Dublin 24

36m
SD19B/0106Granted19 Mar 2019

Attic extension to the rear of house; extension within the roof would total 12sq.m. in size and include a dormer window and roof light to the rear.

16, New Bawn Park, Tallaght, Dublin 24

Planning a project of your own?