5, Monastery Walk, Dublin 22
GrantedPlanning application SD21B/0093
Dublin - South Dublin County Council
Proposed Development
Garden shed with a canopy to be used for sunroom, gym area and storage.
View the full application file on the council's planning portal →Application Timeline
Application received
1 Mar 2021
Decision due
26 Apr 2021
Decision: Grant Permission
26 Apr 2021
Grant issued
4 Jun 2021
Application Details
- Location
- 5, Monastery Walk, Dublin 22
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 551 ha
- Floor Area
- 55.01 sq m
Timeline
- Registration Date
- 1 March 2021
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 26 April 2021
- Grant Date
- 4 June 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) Conversion of remaninder of attic space, incorporating dormer extension to rear; (b) minor alterations to front & side elevations including 1 'Velux' roof light to front; (c) all associated site works.
5, Monastery Walk, Dublin 22
Relocation of playschool to rear garden, new playschool consisting of lobby, playschool room and 2 toilet facilities, to be attached to existing family playroom. Original playschool to side of dwelling to be reinstated to original use and used to for access to new playschool. Session 1: 9.15am-12.15pm, Session 2 :12.30pm-3.30pm as per previous application and all associated site works.
3, Monastery Walk, Clondalkin, Dublin 22.
Change of use from playroom to rear garden of dwelling to playschool. Relocation playschool consisting of classroom and 2 toilet facilities, playroom to side of dwelling to be reinstated to original use and use for access to new playschool. Session 1: 9.15 – 12.15pm, session 2: 12.30pm – 3.30pm as per previous application and all associated site works
3, Monastery Walk, Clondalkin, Dublin 22.
A playschool facility with opening hours as follows, Session 1: 9.15am to 12.15pm; Session 2: 12.30pm to 3.30pm Monday - Friday; reception area and toilet facility in entrance hall and playschool room in existing extension to side of dwelling also new double entrance doors to replace window to front of extension with new ramped access and all associated site works.
3, Monastery Walk, Clondalkin, Dublin 22.
Extension to side of dwelling over existing lounge and utility, with the addition of 2 no. bedrooms to first floor, also to increase dormer projection to rear of dwelling for window to proposed bedroom, also the continuation of roof projection to front of dwelling. Permission is also sought for the construction of a domestic shed to rear of dwelling. Retention is sought for dormer style window to front of dwelling and also for garage conversion to lounge, and all associated site works.
3, Monastery Walk, Clondalkin, Dublin 22.
Retention of change of use from shed in rear garden of dwelling to playschool. This relocating playschool from side of dwelling, consisting of classroom and 2 toilet facilities, playroom to side of dwelling to be reinstated to original use and used for access to new playschool. Session 1: 9.15am - 12.15pm, Session 2 12.30pm - 3.30pm as per previous application. Retention of new playroom to rear garden attached to original shed and all associated site works.
3, Monastery Walk, Clondalkin, Dublin 22.
(a) The removal of existing conservatory to front elevation & replace it with a solid glazed structure; (b) the removal of existing flat roof & replace it with a pitched roof; (c) increasing the rear dormer by 15sq.m.
11, Monastery Walk, Clondalkin, Dublin 22.
The removal of the original lean-to porch roof & the addition of a single storey flat roof extension of c. 9 sq.m to the front (South) of the property. All internal & elevation alterations with 3 associated roof lights. The development will also include for the alteration of the original pedestrian access to the side (West) boundary & all associated site development & ancillary works.
100, Monastery Road, Dublin 22
(a) Conversion of side garage; (b) construction of first floor side extension; (c) internal alterations to dwelling; (d) all associated site works.
108, Monastery Road, Clondalkin, Dublin 22
Construction of first floor extension to rear of house by means of raising height of rear pitched roof and replacing with flat roof; Velux roof light to front elevation into landing area.
108, Monastery Road, Dublin 22
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?