← Back to search

5, Main Street, Tallaght, Dublin 24

Granted

Planning application SD22A/0030

Dublin - South Dublin County Council

Proposed Development

(1) Rear extension consisting of a store on the ground floor, a surgery and autoclave room on the first floor; (2) replacement of existing (old) roof slate tiles with matching new slate tiles of a semi-detached 'Protected Structure'.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    4 Apr 2022

  2. Application received

    8 Jun 2022

  3. Further information received

    8 Jun 2022

  4. Decision due

    5 Jul 2022

  5. Decision: Grant Permission

    5 Jul 2022

  6. Grant issued

    16 Aug 2022

Application Details

Location
5, Main Street, Tallaght, Dublin 24
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
1900 ha

Timeline

Registration Date
8 June 2022
Status
Decision Following A.I.
Decision
Grant Permission
Decision Date
5 July 2022
Grant Date
16 August 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

9m
SD13A/0059Refused3 Apr 2013

Change of use of the ground floor (of 3 Main Street) from office use to funeral home (69 sq.m) including all ancillary works.

3, Main Street, Tallaght, Dublin 24

10m
SD14A/0230Granted3 Nov 2014

Change of use of existing two storey terrace office block into residential dwelling.

4, Main Street, Tallaght, Dublin 24

13m
S00A/0342Refused31 Jul 2000

Extension to premises at rere and internal alterations.

3 Main Street, Tallaght, Dublin 24.

14m
SD09A/0225Refused27 May 2009

Change of use of ground floor level from a funeral booking office to a funeral home with a room for viewing remains.

3, Main Street, Tallaght, Dublin 24

19m
SD06A/0037Refused20 Jan 2006

The demolition of the existing single storey structures on the south, east and west sides of the yard and the construction of a 1,095 sq.m. gross floor area mixed use development ranging from 2 to 4 storeys including penthouse level, with office/retail units at ground level, comprising 2 no. office/retail units 67 sq.m. and 221 sq.m. at ground level, 2 no. one bed apartments (45-55 sq.m.), 7 no. two bed apartments (68-92 sq.m.) including roof gardens, 3 no. car-parking spaces and all associated landscaping and site development works. The development to be accessed via the existing entrance from Main Street.

The Kings Garden Chinese Take-Away,, John C. Mulvey & Co. Solicitors And Freds Fashions, Main Street (formerly Blessington Road), Tallaght Village, Dublin 24

24m
SD098/0004Part 8 Approved by Council31 Aug 2009

Material alteration and extension of office of Tallaght Welfare Society including moving main entrance/reception from no. 1 to no.2, the permanent combination of no’s 1 & 2 by removal of individual stairs, demolition of 8sqm kitchen extension and addition of a 67sqm two storey extension, addition of 2 no. windows to existing extension, and the provision of a ramp to front of no 2 for equal access. Drawings of the proposed extension will be on public display at the Headquarters of South Dublin County Council, County Hall, Tallaght, Dublin 24, on http://www.sdcc.ie/ and at Tallaght Welfare Society Offices, 1 – 2 Main Street, Tallaght, during normal working hours in the period from 27th August 2009 to 7th October 2009. Submissions or observations with respect to this matter dealing with the proper planning and sustainable development of the area in which the development would be situated may be made in writing to; The Senior Executive Officer, Development Department, South Dublin County Council, County Hall, Tallaght, Dublin 24. The latest date for the receipt of submissions or observations is 4.30pm on Thursday 21st October 2009.

1 & 2, Main Street, Tallaght, Dublin 24

30m
SD07A/0720Refuse Permission for Retention5 Sept 2007

Retention of a change of use from residential to office.

1, Main Street, Tallaght, Dublin 24

30m
SD02A/0403Refused15 Jul 2002

Change of use from ground floor residential to office use with first floor retained as residential and for a two storey extension to rear for office and residential use.

1 Main Street,Tallaght, Dublin 24

30m
SD08A/0189Refuse Permission for Retention19 Mar 2008

Retention of a change of use from residential to office.

1, Main Street, Tallaght, Dublin 24

30m
SD10A/0356Grant Permission for Retention25 Nov 2010

5 no. advertising signs on front elevation of building, and one projecting dual signs on metal support structure af front boundary wall, and including 4 light fittings, 2 on main building sign, and 2 on projecting sign.

1, Main Street, Tallaght, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?