Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
GrantedPlanning application SD22A/0099
Dublin - South Dublin County Council
Proposed Development
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
View the full application file on the council's planning portal →Application Timeline
Further information requested
31 May 2022
Further information received
12 Sept 2022
Application received
24 Nov 2022
Decision: Grant Permission
15 Dec 2022
Decision due
22 Dec 2022
Grant issued
3 Feb 2023
Application Details
- Location
- Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 74500 ha
- Floor Area
- 24690 sq m
Timeline
- Registration Date
- 24 November 2022
- Status
- Decision Following A.I.
- Decision
- Grant Permission
- Decision Date
- 15 December 2022
- Grant Date
- 3 February 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a new commercial/industrial park consisting of the following: Block 1 consisting of: Unit A - 2,113 sq.m. 4 storey commercial office building. Unit B - 155 sq.m. 2 storey retail unit. Unit C - 293 sq.m. 2 storey retail unit. Unit D - 293 sq.m. 2 storey retail unit. Unit E - 155 sq.m. 2 storey retail unit. Unit F - 2,113 sq.m. 4 storey l commercial office building. 2 no. waste storage areas totalling 28 sq.m. and circulation/services corridor totalling 124 sq.m. Block 2 consisting of: Unit G - 1,457 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 300 sq.m. Unit H - 657 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 266 sq.m. Unit I - 686 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 273 sq.m. Unit J - 657 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 266 sq.m. Unit K - 1,339 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 300 sq.m. Block 3 consisting of: Unit L - 1,070 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 270 sq.m. Unit M - 893 sq.m. single storey ancillary offices totalling 238 sq.m. Unit N - 918 sq.m single storey warehouse building with 2 storey ancillary offices totalling 245 sq.m. Unit O - 893 sq.m single storey warehouse building with 2 storey ancillary offices totalling 238 sq.m. Unit P - 1,435 sq.m. single storey warehouse building with 2 storey ancillary offices totalling 270 sq.m. General site development works including a new vehicular and pedestrian entrance onto Ballymount Avenue, the provision of 574 surface carparking spaces, bicylce parking, service yards, loading and unloading bays for warehouse units, suface and foul water drainage, new boundary treatment, general landscaping and planting and all associated siteworks at vacant 4.2073 hectare site. An Environmental Impact Statement has been prepared to accommodate this application.
Site bounded to the east by Ballymount Avenue and to the south by Walkinstown , Embankment, Walkinstown, Dublin 12.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
Unit 1, Apex Hub, at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
Alterations to Unit 6 permitted under Reg. Ref.: SD22A/0099 The proposed alterations to the permitted Unit 6 are as follows: Internal alterations at the ground floor level of the permitted warehouse/logistics unit to provide additional ancillary staff welfare facilities, an ancillary trade counter and associated office and storage area, and an ancillary innovation area / testing room; Repositioning of Stair Core 2 at ground and first floor level and proposed extension to the ancillary office floorspace at first floor level, with an additional gross floor area of 110 sq.m; Provision of a first-floor mezzanine level of additional warehouse/logistics floorspace with a GFA of 1,180 sq.m, accessed by new stairs from ground floor level; Alterations to the permitted elevational treatment, including: Reconfiguration and additional glazing on the south-east, south-west and north-east elevations as a result of the proposed internal layout alterations; Removal of the office entrance on the south-east elevation and opaque glazing screen from the WC core on the south-west elevation; Alterations to the cladding arrangements and parapet levels on all elevations (no increase in permitted building height); Central repositioning of grade and dock loading doors on the north-west elevation; Additional entrance doors along the south-west elevation to align with the revised internal layout; Other associated alterations including to the landscaped areas and the extent of boundary fencing; Reconfiguration of the car parking layout, including provision of 3 no. additional parking spaces (40 no. spaces in total, including 2 no. accessible spaces and 8 no. EV charging car parking spaces); Provision of 6 no. additional EV charging spaces for delivery vans to the north of the unit within the service yard; All associated site development works. The proposed alterations result in an overall increase of 1,279 sq.m in the total GFA of the warehouse/logistics unit from 3,997 sq.m to 5,276 sq.m (including ancillary office, trade and staff welfare facilities).
Apex Hub, Calmount Road &, Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
The construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, and associated ancillary drive thru lane, located to south of the permitted Apex Hub at Ballymount Industrial Estate (permitted under Reg. Ref.: SD22A/0099 as amended); The ancillary drive-thru lane, includes a canopy and service hatch on the northwestern elevation side of the unit, a height restrictor / entrance barrier on the access lane and a 3.5m wide drive-thru lane; The proposal includes associated drive-thru signage consisting of 1 no. directional sign, 1 no. order station, and 2 no. menu boards/advertisement signs and tenant signage on the southeastern, northeastern and northwestern elevations; The development includes associated soft and hard landscaping, associated outdoor seating area and external bin store for the proposed café/restaurant unit; The development includes a total of 19 no. car parking spaces including 4 no. EV spaces, 2 no. accessible spaces and 3 no. Staff parking spaces, waiting area, bin store and 10 no. cycle parking spaces; The development includes the repositioning of 2 no. permitted pedestrian crossing to the east of the site (permitted under Reg. Ref.: SD22A/0099); and All associated development. The proposed café/restaurant, with associated ancillary drive-thru lane, supersedes the permitted café unit on the subject site under Reg. Ref.: SD22A/0099.
Apex Hub, Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
Retention of works as-completed, to include three as-constructed timber windows, one as-constructed low level vent grille, blocking up of three high level window openings and provision of a new fire exit door, pursuant to planning Reg. Ref. S94A/0402.
Unit 2, Crossbeg Industrial Estate, Tallaght, Dublin 24
Demolition of Industrial Shed Building
Unit 4, Crossbeg industrial Estate, Ballymount Road Upper, Dublin 24
Construction of 3 no. enterprise / light industrial / wholesale outlet units (Units A, B and C), including ancillary office / administration areas over two levels, with a total GFA of 1,576 sq.m. The proposal includes 25 no. car parking spaces (which includes 2 no. van parking spaces), 20 no. cycle spaces, a Unit Substation, signage zones for the units delivery / loading areas, landscaping, boundary treatments, lighting, PV panels, foul and surface water drainage and all associated development. The proposal forms an extension to the development permitted under Reg. Ref.: SD22A/0099 and includes vehicular and pedestrian access off the permitted internal access road to the immediate south of the proposed units. The application site is located to the north west of, and will be accessed from, the development permitted under Reg. Ref.: SD22A/0099 (to be known as Apex Hub), and is located to the southeast of Crosslands Business Park, Ballymount Road Lower.
Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
Demolition of industrial shed attached to existing industrial building.
Unit 4, Crossbeg industrial Estate, Ballymount Road Upper, Dublin 24
Retention permission is sought for an existing free standing advertisement sign located within the subject grounds fronting onto the junction of Upper Ballymount Road and Calmount Road Dublin 24.
Unit 4, Crossbeg industrial Estate, Ballymount Road Upper, Dublin 24
Demolition of existing lean-to; and extension of existing three storey office and fabrication shop, extension of car parking and all associated site works.
Ballymount Road, Walkinstown, Dublin 12.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?