21, Ballycullen Green, Ballycullen, Dublin 24
GrantedPlanning application SD22B/0111
Dublin - South Dublin County Council
Proposed Development
Dormer window to the front area; new side gable window
View the full application file on the council's planning portal →Application Timeline
Application received
15 Mar 2022
Decision due
9 May 2022
Decision: Grant Permission
9 May 2022
Grant issued
21 Jun 2022
Application Details
- Location
- 21, Ballycullen Green, Ballycullen, Dublin 24
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 206 ha
- Floor Area
- 34 sq m
Timeline
- Registration Date
- 15 March 2022
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 9 May 2022
- Grant Date
- 21 June 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The conversion of existing attic into a storage space which incorporates a new dormer window to the roof on the front Elevation
27, Ballycullen Green, Dublin 24, D24 WRW8
A 120 bedroom Residential Care Facility for older people in a 2 and 3 storey building over basement accommodation associated site works and landscaping at Oldcourt Road on the south-side opposite Beechdale Estate and to the west of Hunters Grove.
Oldcourt Road, Tallaght, Dublin, 24
Conversion of Attic to habitable space to include dormer roof to the rear
34, Ballycullen Green, Oldcourt, Dublin 24, D24RXR7
Provision of a temporary two storey post-primary school (Firhouse Educate Together Secondary School: Roll No. 68307J), comprising 10 classrooms and 3 specialist classrooms including all ancillary teacher and pupil facilities (2,000sq.m. gross floor area approximately); provision of an internal vehicular drop-off area and internal circulation routes; 15 surface parking spaces; bicycle parking; ball courts and play areas; access to the proposed temporary school will be from Oldcourt Road; provision of piped infrastructure and ducting; plant; pedestrian access points; ESB substation; attenuation tank; landscaping and boundary treatments; ancillary ramps and stairs; signage; changes in level and all associated site development and excavation works above and below ground; on a 0.86ha site approximately, which forms part of a larger 1.77ha landholding earmarked to accommodate a future permanent post-primary school; temporary permission for a period of 5 years is being sought.
Oldcourt Road/Ballycullen Green, Firhouse, Dublin 24
11 apartments in 1 building ranging from 3 to 4 storeys in height. The proposed building is to provide for 11 no. 2 bedroom units, all with own balconies, a communal back garden and a shared roof terrace. Provision is made also for on-street car parking at the front of the proposed building, bin storage and bicycle parking at the site.
0.13ha North of Oldcourt Road and South, Of The Proposed East/West Distributor Road, Linking The Ballycullen Road With The Proposed, New Access To The Hunters Wood Development, (under Construction Reg. Ref., S00A/0920) At, Ballycullen, Dublin 24
The Conversion of existing attic in to a bedroom & ensuite bathroom which incorporates a new dormer window to the roof on the front elevation
14, Ballycullen Green, Oldcourt Road, Ballycullen, Dublin 24
New educational campus, to be delivered on a phased basis comprising 1 No. part 3 storey, 1,000 pupil Post Primary School (Firhouse Educate Together Secondary School: Roll No. 68307J) and includes accommodation for children with special educational needs, a multi-purpose hall and all ancillary teacher and pupil facilities with a gross floor area of c. 11,021 sq.m; The development will also include and permanently incorporate elements of the temporary two storey postprimary school development (permitted under An Bord Pleanála Ref: ABP-311141-21; South Dublin County Council Reg. Ref. SD21A/0137), including vehicular access from Oldcourt Road; 3 ball courts; 2 pedestrian and cyclist access points and 1 pedestrian only access point to the northern boundary of the site; car parking; surface water drainage; attenuation tanks; piped infrastructure and ducting; changes in level and all associated site development and excavation works above and below ground; The development will also include minor revisions to the previously permitted car parking area to allow for the provision of additional car parking spaces to serve the Post Primary School; The development will also include 3 additional ball courts and play areas; 1 storage building (c. 48 sq.m); car parking; electric vehicle charging points; bicycle parking; hard and soft landscaping; waste management provision; cycle and pedestrian routes; boundary treatments; ancillary ramps and stairs; signage; attenuation tank; PV panels; boiler and plant; surface water drainage and SuDS measures (including green roofs); 3 flag poles; street and security lighting; piped infrastructural services and connections; changes in level and all associated site development and excavation works above and below ground; The development will also consist of the retention of an ESB substation located to the south of the vehicular entrance at Oldcourt Road.
Site at Oldcourt Road / Ballycullen Green, Firhouse, Dublin 24
Retention for the construction of a dormer window in the main roof to the rear of the house.
36 Hunters Meadow, Hunters Wood, Dublin 24, D24 A781
Construction of a single storey extension to north eastern side of existing dwelling to include additional living accommodation and external covered storage space; all associated site works.
20, Hunters Lane, Hunterswood, Dublin 24
Partial 2 storey rear extension & full width ground floor rear extension with roof light over; partial 2 storey side extension with roof light over; flat roofs to all extensions; internal alterations at ground floor & first floor; new window at first floor in existing rear façade.
27, Hunters Lane, Hunters Wood, Ballycullen, Dublin 24
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?