Site located in the townlands of Coolscudden, Brownstown and Milltown, West of Grange Castle Business Park, Newcastle, Co. Dublin
GrantedPlanning application SD24A/0087W
Dublin - South Dublin County Council
Proposed Development
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
Application Timeline
Application received
19 Apr 2024
Further information requested
13 Jun 2024
Further information received
24 Oct 2024
Decision due
19 Dec 2024
Decision: Grant Permission
19 Dec 2024
Appeal submitted
27 Jan 2025
Appeal decided: Remove Condition(s) & Amend Condition(s)
27 May 2025
Grant issued
17 Jun 2025
Application Details
- Location
- Site located in the townlands of Coolscudden, Brownstown and Milltown, West of Grange Castle Business Park, Newcastle, Co. Dublin
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 22600 ha
- Floor Area
- 74129 sq m
Timeline
- Registration Date
- 19 April 2024Other applications received that week
- Status
- Final Grant
- Decision
- Grant Permission
- Decision Date
- 19 December 2024
- Grant Date
- 17 June 2025
- Permission Expires
- 16 June 2030
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-321772-25
- Decision
- Remove Condition(s) & Amend Condition(s)
- Submitted
- 27 January 2025
- Decided
- 27 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Grand Canal Greenway – Hazelhatch to 12th Lock will include the following features: 4.6km of shared walking and cycling Greenway along the existing northern Grand Canal towpath; Path widths will vary from 2.5m to 3.5m in width. Widths will be dictated by existing on site features; Improvements to the existing towpath along the Grand Canal through the provision of a suitable surface i.e; Quarry Dust or Asphalt Tarmac depending on local conditions for pedestrian and cyclists use; Provision of access controls such as pedestrian and cycle friendly gates along the route; Underground utilities and services including: Power ducting, telecom ducting, Public Lighting ducting & CCTV ducting; All associated ancillary works and integrated landscape plans. Plans and particulars of the proposed scheme will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy from Friday 14th December 2018 to 21st January 2019 at the following locations: Online on the Council’s Public Consultation Portal website http://consult.sdublincoco.ie; South Dublin County Council Offices, County Hall, Tallaght, Dublin 24, D24 A3XC between the hours of 9:00am– 5.00pm Monday to Thursday and 9.00am - 4.30pm on Friday (Inspection only) between the hours of 9:00am – 4.00pm Monday to Thursday and 9.00am – 3.30pm on Friday (Inspection and Purchase); Civic Centre, Clondalkin, Dublin 22, D22 E9X5 between the hours of 9:00am – 5.00pm Monday to Thursday and 9.00am - 4.30pm on Friday (Inspection only); County Library, Tallaght, Dublin 24 D24 A3EX, between the hours of 9.45am to 8.00pm Mon to Thurs, 9.45am to 4.30pm Fri to Sat. Closed Saturdays and Mondays of Bank Holiday Weekends (Inspection only); Clondalkin Library, Monastery Road, Clondalkin, Dublin 22 D22 XP03, between the hours of 9:45am – 8.00pm Mon to Thurs, 9.45am – 4.30pm Fri to Sat. Closed Saturdays and Mondays of Bank Holiday Weekends (Inspection only); Lucan Library, Lucan shopping Centre, Newcastle Road, Co. Dublin K78 V295, between the hours of 9:45am – 8.00pm Mon to Thurs, 9.45am – 4.30pm Fri to Sat. Closed Saturdays and Mondays of Bank Holiday Weekends (Inspection only); Kildare County Council Offices, Aras Chill Dara, Naas, Co Kildare between the hours of 9:00am – 5.00pm Monday to Thursday and 9.00am - 4.30pm on Friday (Inspection only). An Ecological Impact Assessment Report has been prepared in respect of the proposed works. The proposed Scheme has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC).The proposal has undergone screening for Environmental Impact Assessment under the EIA Directive 2014/52/EU and the Planning Authority has determined that there will be no real likelihood of significant effects on the environment arising from the proposed development and therefore an Environmental Impact Assessment is not required. Any person may, within 4 weeks from the date of this notice, apply to An Bord Pleanála for a screening determination as to whether the proposed development would be likely to have significant effects on the environment. Submissions and observations on the Grand Canal Greenway – Hazelhatch to 12th Lock can be made online and in writing to the addresses below between Friday 14th December 2018 to Monday 4th February 2019 inclusive (excluding Public Holidays) as follows: Online: at https://consult.sdublincoco.ie up to Midnight on the 4th February 2019 or by Post up to 4.00pm on the 4th February 2019, to the Senior Executive Officer, Economic Enterprise & Tourism Development Department, South Dublin County Council, County Hall, Tallaght, Dublin 24. Only submissions received by Monday 4th February 2019 and addressed as set out above, will be considered. Submissions cannot be accepted in any other format or to any other postal address. Submissions and observations should state the name, address, and where relevant the body represented however in the interests of data protection interested parties are asked not to include any other personal information when making submissions. All comments including the names of those making the comments, submitted to the Council regarding the Grand Canal Greenway Hazelhatch to 12th Lock will form a report to be presented to South Dublin County Council, and will form part of a public document and the information contained in submissions received will be available for public inspection and made available on the Council’s website and the Council’s public counter.
Hazelhatch to 12th Lock, Co. Dublin
Single storey extension and alterations to existing dormer style dwelling including the change of use of existing domestic garage to use as habitable space.
Balscott , Celbridge , Co. Kildare
The installation of no. 6 pole mounted antennas, no. 2 dishes, GPS, remote radio units (RRU's), cable trays, cabinets and all other site development works on the water tower to provide for high-speed wireless data and broadband services.
Peamount Hospital, Loughtown upper, Co. Dublin
Demolition of single storey derelict hospital building known as St Annes & St Brendans unit and associated boiler room.
St. Annes and St. Brendans Unit, Peamount Hospital, Newcastle, Co. Dublin
For a single storey extension and alterations to existing dormer style dwelling including the change of use of existing domestic garage to use as a habitable space and all associated site works
Balscott , Celbridge , Co.Kildare
Single storey extension to rear and side, to include extra living accommodation, porch to front and attic conversion for storage.
103, Loughtown Lower, Brownstown, Newcastle, Co. Dublin.
Remove existing kitchenette and extend rear of existing cottage and raising of roof pitch to incorporate kitchen, dining room, lounge and utility room off kitchen, study with external door and WC at ground floor and also 4 bedrooms, one en-suite and one bathroom on proposed second floor accessed by internal stairs with internal balcony overlooking new lounge.
103, Loughtown Lower, Brownstown, Newcastle, Co. Dublin.
for concrete slab recently installed in meadow to rear of existing dwelling. Planning Permission is also sought for storage shed to be constructed on the existing concrete slab which is also subject of this application. Above works along with associated landscaping and site works
Balscott , Celbridge , Co. Kildare.
Dormer bungalow, garage, waste water treatment system, alterations to existing entrance to accommodate new entrance and ancillary site works.
Brownstown, Newcastle, Co. Dublin.
for concrete slab recently installed in meadow to rear of existing dwelling. Planning Permission is also sought for storage shed to be constructed on the existing concrete slab which is also subject of this application. Above works along with associated landscaping and site work
Balscott , Celbridge , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?