← Back to search

No. 10, Cornerpark Rise, Cornerpark, Newcastle, Co. Dublin, D22 Y3KD

Granted

Planning application SD25A/0289W

Dublin - South Dublin County Council

Proposed Development

Planning permission for the construction of 1 No. two-storey end of terraced house, comprising of 3-bedrooms with a private rear garden. The proposed development will also include associated landscaping, boundary treatments, drainage, and all ancillary site works, to be carried out within the side gardens.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    26 Jan 2026

  2. Application received

    11 Mar 2026

  3. Further information received

    11 Mar 2026

  4. Decision due

    7 Apr 2026

  5. Decision: Grant Permission

    7 Apr 2026

  6. Grant issued

    19 May 2026

Application Details

Location
No. 10, Cornerpark Rise, Cornerpark, Newcastle, Co. Dublin, D22 Y3KD
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Eircode
D22 Y3KD
Site Area
300 ha
Floor Area
97.82 sq m

Timeline

Registration Date
11 March 2026
Status
Final Grant
Decision
Grant Permission
Decision Date
7 April 2026
Grant Date
19 May 2026
Permission Expires
18 May 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
SD21A/0335Refused9 Dec 2021

Construction of 6 two storey, 3-bedroom terraced dwellings; all associated site development works, car parking, landscaping, open spaces, public lighting and connections to fouls and surface water drainage/attenuation systems and mains water supply; the proposed development represents an amendment to the existing partially completed development as it relates to the above-mentioned plots for which planning permission was granted under Register Reference SD19A/0040 granted on the 181h November 2019. The application provides for and planning permission is sought for an amendment to the scheme as set out in the compliance layout submitted on the 14th July 2020 and approved by South Dublin County Council on the 18th August 2021 on foot of condition No. 2a, 2b & 2c of SD19A/0040 by making provision for a vehicular access and footpath to the boundary of the lands to the rear (northern boundary) of the existing development; the development is on a site area of c. 0.15ha known as Site No's 10 - 15 Cornerpark Rise, Cornerpark Town land, Peamount Road, Newcastle, Co. Dublin.

Site No's 10-15, Cornerpark Rise, Cornerpark Townland, Peamount Road, Newcastle, Co. Dublin

59m
SD19A/0040Granted13 Sept 2019

Demolition of existing stables/sheds; construction of 28 dwellings comprised of 8 three bedroom, two storey semi-detached houses (Type A); 7 three bedroom, 2 storey terraced houses (Type B); 6 three bedroom, 2 storey terraced houses (Type C); 3 three bedroom, 2 storey terraced houses (Type D); 4 three bedroom, 2 storey semi-detached houses (Type E); all associated site development works, car parking, landscaping, open spaces, public lighting, connections to foul and surface water drainage/attenuation and water supply.

Cornerpark, Peamount Road, Newcastle, Co. Dublin.

119m
SD04A/0056Granted25 Jun 2004

Change of use from existing residential 2 storey dwelling to 11 bed supported Adult Mental Health Community Residence.

Teach Ban, Peamount Road, Newcastle, Co. Dublin

143m
S99A/0511Refused29 Nov 1999

Service station and retail unit including temporary effluent treatment plant (change of plan from that approved under Reg. Ref. S98A/0744).

Cornerpark Townland, Newcastle, Co. Dublin.

157m
SD05A/0671Refused5 Aug 2005

(a) 2 No. detached four bedroom two storey with dormer dwellings: (b) 18 No. semi-detached four bedroom, two storey with dormer dwellings: (c) 4 No. semi-detached three bedroom, two storey dwellings: (d) 6 No. semi-detached/end terrace four bedroom two storey with dormer dwellings: (e) 4 No. mid-terrace three bedroom two storey dwellings: (f) a three storey apartment block of 6 No. two bedroom apartment units facing onto Main Street: (g) a three storey and partial four storey block of 16 No. two bedroom duplexes: (h) 2 No. four storey blocks of various designs each with 4 No. two bedroom duplexes: (i) 2 No. four storey blocks each with 10 No. two bedroom duplex units: (j) a four storey block of 8 No. two bedroom duplex units: (k) a two storey childcare facility of 295.4 m.sq.: (l) access roads, footpaths, re-located four sewer, upgraded pumping station, surface water drainage and all associated site works.

"Barnbrook", Main Street, Newcastle, Co. Dublin

163m
ED20/0027Declared Not Exempt22 Jul 2020

The installation of E.V charging point to be mounted on a post - post size 120mm height, 75mm depth. This post will be fixed onto the tarmac of parking space. Footpath to be chased 50ml height, 150ml deep and cable to be buried into this track. Cement footpath afterwards.

9, Castlechurch Avenue, Newcastle, Co. Dublin

179m
SD07A/0246/EPRefuse Ext. of Duration of Permission30 Jul 2013

8 no. 3 storey dwellings and 1 no. 2 storey dwelling to replace the previously proposed apartment building to the Northwest of the site, the removal and/or relocation of other specified dwellings and the re-design of dwellings and the creche and Montessori school building in response to the request for Further information. Amendments have also been made to the proposed scheme layout, engineering and landscape works, allowing for a reduction in units from 126 no. to 116 no. on a site of 2.92 hectares/7.21 acres.

Cornerpark, Newcastle, County Dublin

179m
SD07A/0246Granted5 Nov 2007

8 no. 3 storey dwellings and 1 no. 2 storey dwelling to replace the previously proposed apartment building to the Northwest of the site, the removal and/or relocation of other specified dwellings and the re-design of dwellings and the creche and Montessori school building in response to the request for Further information. Amendments have also been made to the proposed scheme layout, engineering and landscape works, allowing for a reduction in units from 126 no. to 116 no. on a site of 2.92 hectares/7.21 acres.

Cornerpark, Newcastle, County Dublin

180m
SD15A/0193Granted2 Nov 2015

Demolition of 3 dwellings and associated sheds/garages (4) totalling c.786 sq.m. Construction of a new residential development comprising 73 no. 2-storey, 3/4/5 bed, detached, semi-detached and terraced houses ranging in size from c.107sq.m to c.176sq.m; provision of a new vehicular entrance to service 71 of the houses with 2 houses having direct frontage/access to Main Street; additional access to the Castlelyon residential development to the east; all associated site development, landscaping, open spaces, boundary treatment works, car parking, bin storage and infrastructural services provision.

Lands at Cornerpark, Newcastle, Co. Dublin

181m
SD17A/0288Granted16 Aug 2017

Revisions to previously approved residential scheme under reg. ref. no. SD15A/0193. The revisions will comprise of the omission of 20 no. permitted dwellings (12 three bed and 8 four bed) and their replacement with 24 no. dwellings (22 three bed and 2 four bed) and associated site development works, all on a site of 0.89 hectares approx.

Castlechurch, Newcastle, Co. Dublin

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?