← Back to search

Block 0, Ballymount Drive, Ballymount road, Walkinstown, Dublin 12, D12 DT6K

Granted

Planning application SD25A/0307W

Dublin - South Dublin County Council

Proposed Development

Full planning permission for a standalone single storey storage unit to the side and rear of existing building and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    16 Feb 2026

  2. Further information received

    14 Apr 2026

  3. Application received

    22 May 2026

  4. Decision: Grant Permission

    15 Jun 2026

  5. Decision due

    18 Jun 2026

  6. Grant issued

    27 Jul 2026

Application Details

Location
Block 0, Ballymount Drive, Ballymount road, Walkinstown, Dublin 12, D12 DT6K
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Eircode
D12 DT6K
Site Area
3220 ha
Floor Area
325 sq m

Timeline

Registration Date
22 May 2026
Status
Final Grant
Decision
Grant Permission
Decision Date
15 June 2026
Grant Date
27 July 2026
Permission Expires
26 July 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
SD06A/0099Granted16 Feb 2006

(a) Construction of a new boundary wall and steel fence to front & rear; (b) construction of 2 no. access gates; (c) new signage to the front of the existing building.

Units 1 & 4, Block O, Ballymount Drive, Ballymount, Walkinstown, Dublin 12.

0m
SD05A/0367Granted10 May 2005

New facade to the front elevation and front section of the side elevation incorporating new entrance and stairway; change of use of part of warehouse to create additional office space on ground and first floor floors; re-cladding of side and rear elevations.

Units 1 & 4, Block O,, Ballymount Drive, Ballymount, Walkinstown, Dublin 12.

61m
SD06A/0916Grant Permission for Retention25 Oct 2006

Addition of 7 no. new windows, 1 no. wall grille and 1 no. widened loading door.

Block P, Ballymount Industrial Estate, Walkinstown, Dublin 12.

73m
SD12A/0236Granted1 Feb 2013

Change of use of existing industrial unit to an archery and airsoft range leisure centre together with some minor internal alteration and new signage over front entrance.

Unit N2 Ballymount Drive, Ballymount Industrial Estate, Dublin 22.

75m
S01A/0040Granted30 Jan 2001

Internal mezzanine floor extension total area 200m2

Unit 7, Ballymount Business Pk, Ballymount Rd, Dublin 12.

86m
SD02A/0347Granted26 Jun 2002

Erection of a 36 metre high, freestanding communication mast carrying antennae and communication dishes with associated ground mounted equipment cabinets within existing 4.5 metre high bricked walled compound.

ESB 38kv Substation, Ballymount Drive, Dublin 12.

87m
SD19A/0271Grant Permission for Retention23 Aug 2019

Retention of first floor mezzanine with a staircase within the interior of the existing warehouse, the exterior is retained. The new mezzanine floor is to be used as additional workspace.

Unit 4, Ballymount Business Park, Ballymount Drive, Robinhood, Dublin 12

110m
SD05A/0704Grant Permission & Grant Retention19 Aug 2005

The provision of six additional car parking spaces to the exterior of the existing unit, and the retention of internal alterations, namely the change of use of part of ground floor workshop/warehouse to provide showroom/display area, office, toilets and additional ancillary accommodation and to provide additional/extended mezzanine area comprising office accommodation at first floor level and for retention of 2 new windows and 1 new door to elevations.

Unit 2, Ballymount Business Park, Ballymount Road, Dublin 12

117m
SD21A/0158Granted2 Dec 2021

Erection of 2 two storey industrial units adjacent to existing S1 unit comprising of warehouse, office and toilet at ground floor level and proposed storage to mezzanine floor level; alterations to external area/existing car park and all associated site works.

Unit S1, Ballymount Drive, Ballymount Industrial Estate, Dublin 12

118m
SD08A/0805Granted28 Nov 2008

Two storey extension to the north gable end of existing industrial units. The extension will comprising two separate warehouse units, each with 100sq.m. warehouse floor space and 22sq.m. of ancillary office space: the gross internal floor space to be provided is 244sq.m. The overall height of the development is 7.3m.

Unit 51, Ballymount Drive, Walkinstown, Dublin 12.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?