1, Cloonmore Drive, Tallaght, Dublin 24
Grant Permission & Grant RetentionPlanning application SD25B/0389W
Dublin - South Dublin County Council
Proposed Development
The construction of a two storey extension (c.70m.sq.) to the side of the existing two storey dwelling along with the widening of the existing vehicular access including dishing of kerb, alterations to the existing boundary treatments and all other ancillary site development works at 1 Cloonmore Drive. Retention permission is also sought for the existing single storey shed (c.35m.sq.) to the rear of the existing dwelling.
View the full application file on the council's planning portal →Application Timeline
Application received
11 Jun 2025
Decision: Grant Permission & Grant Retention
1 Aug 2025
Decision due
5 Aug 2025
Grant issued
11 Sept 2025
Application Details
- Location
- 1, Cloonmore Drive, Tallaght, Dublin 24.
- Applicant
- N/A
- Application Type
- Permission and Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 520 ha
- Floor Area
- 70.4 sq m
Timeline
- Registration Date
- 11 June 2025
- Status
- Final Grant
- Decision
- Grant Permission & Grant Retention
- Decision Date
- 1 August 2025
- Grant Date
- 11 September 2025
- Permission Expires
- 10 September 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works
1, Cloonmore Drive, Tallaght, Dublin 24.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
1, Cloonmore Drive, Tallaght, Dublin 24
Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works , landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.
Site to the Side of, 1 Cloonmore Drive, Dublin 24
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
St. Thomas the Apostle Pastoral Centre, Fortunestown Road, Dublin 24, D24 NV21
Provision of a new temporary modular built classroom block as a single storey unit containing six classrooms with toilets. Located between the existing senior and junior school buildings.
St. Thomas' Senior School, Jobstown, Tallaght, Dublin 24.
Change of use of the existing parochial house from a residence to a drop-in counselling and outreach centre including minor alterations and additions to include an extended porch and associated works.
St. Thomas The Apostle Parochial House, Jobstown, Tallaght, Dublin 24
Conversion of the loft over the parish rooms to an educational training facility to include the installation of 6 no. new roof windows in the existing roof.
St. Thomas's Church, Kiltalown Way, Jobstown, Dublin 24.
Change of use of the existing parochial house from a residence to a drop-in counselling and outreach centre including minor alterations and additions to include an extended porch and associated works.
St. Thomas The Apostle Parochial House, Jobstown, Tallaght, Dublin 24
Change of use of the existing Parochial House from a residence to a drop-in counselling and outreach centre including minor alterations and additions to include an extended porch and associated works.
St. Thomas The Apostle Parish Parochial House, Jobstown, Tallaght, Dublin 24.
Construction of an enclosed link corridor between new permanent standalone building (as granted under SD14A/0154 - under construction) and existing school building together with associated internal alterations to existing school, together with all associated site works.
St. Thomas' Senior National School, Jobstown, Dublin 24.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?