Towmilebridge and Inchanabraher , Clonmel , Co. Tipperary
CONDITIONALPlanning application 17600263
Tipperary - Tipperary County Council
Proposed Development
removal of existing field gate and construct a new site entrance with boundary set back and farm road and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
16 Mar 2017
Further information requested
8 May 2017
Further information received
31 Jul 2017
Decision: CONDITIONAL
26 Sept 2017
Decision due
28 Sept 2017
Grant issued
31 Oct 2017
Application Details
- Location
- Towmilebridge and Inchanabraher , Clonmel , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.216 ha
Timeline
- Registration Date
- 16 March 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 September 2017
- Grant Date
- 31 October 2017
- Permission Expires
- 30 October 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) an extension to existing warehouse consisting of warehouse storage use with open canopy to the North facing elevation with internal roadway around the new extension and carparking area and boundary fencing, 2) a machine store/lift store with electrical charging points and 3) RETENTION PERMISSION for an open canopy constructed to the rear of the premises (West facing) with all associated siteworks
Two Mile Bridge , Clonmel , Co. Tipperary
1) an extension to our existing warehouse consisting of warehouse storage use with open canopy to the North facing elevation with internal roadway around the new extension and carparking area and boundary fencing, 2.) PERMISSION for RETENTION of an open canopy constructed to the rear of the premises (West facing) with all associated siteworks
Two Mile Bridge , Clonmel , Co. Tipperary
(1) alterations to the dwelling including demolition of existing single storey extension, and elevational changes including rendering, replacement roof, installation of windows, and alteration to chimney and flue, erection of sky and broadband dishes, and installations of rainwater goods. (2) alterations to the existing boundary walls enclosing the curtilage of the dwelling including the alteration of the site entrances serving the property from the public road L2506, and removal of rear boundary wall and replacement with low wall. (3) development of a deck and slipway with metal framing adjoining the Anner river. (4) the alterations of ground levels and construction of steps within the curtilage. (5) the clearing of a yard area and laying of hardcore. (6) the erection of a CCTV pole and associated service manholes (6) the erection of a soil berm to enclose the yard area. (7) the laying of concrete kerbs and flexible bollards along the L2506 roadside adjacent to the dwelling.
Twomilebridge , Clonmel , Co Tipperary
renovations to outbuilding and conversion of same to a garden room - renovations include roofing the building, general elevation alterations, and site works including service provisions with connection to existing on-site septic tank
Twomilebridge , Clonmel , Co. Tipperary
a new two storey dormer style private house, to create a new vehicular entrance, connection to public sewer and all other associated site works
Millview , Redmondstown , Clonmel
a new two storey dormer style private house, to create a new vehicular entrance, connection to public sewer and all other associated site works
Redmondstown , Clonmel , Co. Tipperary
erection of 10,058.00 m2 of photovoltaic panels on the roof of the manufacturing building and warehouse building in our factory with all associated site works
Bulmers Limited , Annerville , Clonmel
erect 10,058.00 m2 of photovoltaic panels on the roof of the manufacturing building and warehouse building in our factory with all associated site works
Bulmers Limited , Annerville , Clonmel
1) the demolition and removal of two derelict properties, the old B&B building, Site A and neighbouring bungalow Site B, 2) Site A = the levelling/grading of the land to create a green field with specimen tree planting and incorporating flood and storm water detention scheme, the creation of a new boundary consisting of a post and rail fence, situated 14 meters off the N24 metal road edge, with selected trees behind, the closing of the existing vehicle entrance gate off the N24 and creation of a new entrance to the north onto the “Old Clonmel Road", 3) Site B = to construct a new dormer style dwelling in lieu of the demolished bungalow along with a new foul treatment system and storm water soakaway, to close the existing entrance off the N24 and to create a new vehicle entrance onto the Old Clonmel Road, 4) Site C = to construct a new dormer style dwelling in lieu of the demolished dwelling (old B&B) on Site A, along with a new foul treatment system and storm water soakaway, to create a new vehicle entrance onto the Old Clonmel Road, 5) Site D - to amend the existing boundary of Site D to create the new Site C, to close the existing vehicle entrance off the N24 and reactivate the previous vehicle entrance onto the “old Clonmel road”., 6) to remove the existing barrier to the old Clonmel Road and install automatic gates in lieu and all with the associated site development works
Newtownanner Killaloan Lower , Clonmel , Co. Tipperary
erect 10,058.00 m2 of photovoltaic panels on the roof of the manufacturing building and warehouse building in our factory with all associated site works
Bulmers Limited , Annerville , Clonmel
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?