← Back to search

Ballyvaughan , Portroe , Nenagh

CONDITIONAL

Planning application 17600964

Tipperary - Tipperary County Council

Proposed Development

construction of a shed for the storage of agricultural equipment and domestic items to include all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Sept 2017

  2. Further information requested

    24 Oct 2017

  3. Further information received

    31 Jul 2018

  4. Decision: CONDITIONAL

    24 Aug 2018

  5. Decision due

    27 Aug 2018

  6. Grant issued

    28 Sept 2018

Application Details

Location
Ballyvaughan , Portroe , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.314 ha

Timeline

Registration Date
1 September 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 August 2018
Grant Date
28 September 2018
Permission Expires
27 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
18601151CONDITIONAL21 Sept 2018

a mono pitched extension to the existing detached garage comprising carport, fuel store, garden equipment store and gym together with associated site works

Ballyvaughan , Portroe , Nenagh

65m
17600607CONDITIONAL29 May 2017

existing domestic storage shed and full planning permission to install new waste water treatment system along with all ancillary site works

Ballyvaughan , Portroe , Nenagh

65m
18600182CONDITIONAL16 Feb 2018

1) To convert existing attic space to habitable accommodation incorporating dormer windows & roof lights to rear, 2) To build on porch to front, 3) For revised fenestration detailing to existing, 4) To build new garage with lofted storage space & carport in rear garden in lieu of existing garage to be demolished and 5) for all associated site works

Ballyvaughan , Portroe , Nenagh

201m
18601513REFUSED20 Dec 2018

construction of a dwellinghouse, garage, waste water treatment system, with access via existing laneway along with all ancillary site works

Garrykennedy , Nenagh , Co Tipperary

201m
18600212N/A21 Feb 2018

(a) proposed new part 2 storey, part single storey dwelling, (b) proposed new single storey garage, (c) proposed new treatment system & percolation area, (d) all associated site works and service connections and (e) new entrance from existing access lane

Garrykennedy , Co. Tipperary

263m
211408CONDITIONAL22 Sept 2021

construction of a detached two storey dwelling with new site entrance, waste-water treatment system, boundary walls and ancillary site development works on a site that adjoins a protected structure (RPS 561)

Garrykennedy , Portroe , Nenagh

267m
211058N/A21 Jul 2021

construction of a detached two-storey dwelling with new site entrance, waste-water treatment system, boundary walls, garage and ancillary site development works

Garrykennedy , Portroe , Nenagh

271m
2297CONDITIONAL8 Feb 2022

a) refurbishment/alterations to existing single storey detached dwelling, b) new single storey extensions to side North-West/South-East and rear South-West elevations of existing dwelling, c) all associated site works/services

Garrykennedy , Co Tipperary

280m
2660055N/A24 Jan 2026

construction of detached single storey holiday cottage, installation of onsite wastewater treatment system, new entrance, connection to necessary services together with all associated incidental and site works

Garrykennedy , Portroe Nenagh , Tipperary

284m
2660063N/A29 Jan 2026

the construction of detached single storey holiday cottage, installation of onsite wastewater treatment system, new entrance, connection to necessary services together with all associated incidental and site works

Garrykennedy , Portroe , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?