← Back to search

Garrykennedy , Portroe , Nenagh

CONDITIONAL

Planning application 17601046

Tipperary - Tipperary County Council

Proposed Development

to extend existing dwelling along with all ancillary site works in addition to those works granted permission under PL Ref 17600356

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Sept 2017

  2. Decision: CONDITIONAL

    15 Dec 2017

  3. Decision due

    21 Dec 2017

  4. Grant issued

    27 Jan 2018

Application Details

Location
Garrykennedy , Portroe , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.063 ha

Timeline

Registration Date
22 September 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 December 2017
Grant Date
27 January 2018
Permission Expires
26 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
17600356CONDITIONAL7 Apr 2017

to retain external stairway and doorway to first floor attic space and full planning permission to (1) Install 2 no. rooflights to attic space in dwelling (2) Construct canopy/porch over front door (3) Renovate and extend existing garage (4) Reconfigure existing entrance along with all ancillary site works

Garrykennedy , Portroe , Nenagh

30m
2561228CONDITIONAL28 Nov 2025

construction of dwelling house, domestic garage and storage shed, entrance and all ancillary site works

Portroe , Nenagh , Co. Tipperary

83m
2460782CONDITIONAL17 Sept 2024

extension and alterations to existing dwelling and all ancillary works

Garrykennedy , Portroe Nenagh , Co. Tipperary

135m
2660597N/A18 Jun 2026

1. demolition of existing dwelling house, shop unit, forecourt canopy & all ancillary structures within the curtilage of the site, 2. construction of new replacement filling station facility comprising (i) single storey service building (423.5m sq gross internal floor area) incorporating convenience retail areas, branded signage, food preparation/delicatessen, communal seating area, ancillary off-licence, ancillary post office area, customer toilet, back of house, staff & storage accommodation, (ii) 2 no. dispensing pump islands incorporating new forecourt canopy structure with branded signage (iii) 1 no. remote off island dispenser (iv) erection of double-faced and internally illuminated totem advertising signage totem, 3. siteworks comprising: provision of bicycle & car parking including (ev) electric vehicle charge points & accessible parking bay, air & water service area, widening of existing vehicular entrances, landscaping, resurfacing of existing forecourt, suds & attenuation measures, petrol interceptor, new boundary treatments, (including construction of retaining wall structures), decommissioning of existing below ground fuel storage tanks & installation of new fuel storage tanks & associated ventilation stack and all associated & ancillary site development and infrastructure works

Existing Shop & Filling Station , Portroe , Nenagh

139m
2660602N/A19 Jun 2026

redevelopment works consisting of 1) demolition of existing dwelling, shop unit, forecourt canopy and all ancillary structures within the curtilage of the site, 2) construction of new replacement filling station facility comprising (i) single storey service building (423.5m sq gross internal floor area) incorporating convenience retails area, branded signage, food preparation/delicatesse, communal seating area, ancillary off-licence, ancillary post office area, customer toilet, back of house staff and storage accommodation, (ii) 2 no. dispensing pump islands incorporating new forecourt canopy structure with branded signage (iii) 1 no. remote off island dispenser, (iv) erection of double faced and internally illuminated totem advertising signage totem, 3) site works comprising the provision of bicycle and car parking including (EV) electric vehicle charge points and accessible parking bay, air and water service area, widening of existing vehicular entrance, landscaping, resurfacing of existing forecourt, Suds and attenuation measures, petrol interceptor, new boundary treatments(including construction of retaining wall structures) decommissioning of existing below ground fuel storage tanks and installation of new fuel storage tanks and associated ventilation stack and all associated and ancillary site development and infrastructure works

Existing Shop & Filling Station , Portroe , Nenagh

177m
2460874CONDITIONAL12 Oct 2024

new carpark area with entrance onto Ardarra Estate and permission for 6m high lighting standards with led lighting, footpath from the carpark to connect to Portroe GAA Club house grounds, connections to existing public services with all associated sitework and ancillary works

Garrykennedy , Portroe , Nenagh Co. Tipperary

249m
2260045CONDITIONAL3 Feb 2022

To renovate and extend existing dwelling, demolish a portion of existing storage shed along with ancillary site works

No.25 Ardarra Portroe , Nenagh Co Tipperary , T.L.D - Garrykennedy

252m
18600825CONDITIONAL29 Jun 2018

to renovate and extend existing dwelling along with all ancillary site works

18 Ardarra , Garrykennedy , Portroe

272m
2260543CONDITIONAL6 Oct 2022

the renovation and extension of the existing dwelling along with all ancillary works and Retention Permission for a storage shed to side of property

27 Ardarra , Portroe , Nenagh

332m
19600046N/A23 Jan 2019

the construction of 32 two-storey detached houses and associated site works. The development will consist of 9 no. three-bedroom houses, 15 no. four-bedroom houses and 8 no. four-bedroom houses with garage

Cloneygowney , Portroe , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?