Application Timeline

  1. Application received

    26 Oct 2017

  2. Further information requested

    13 Dec 2017

  3. Further information received

    20 Feb 2018

  4. Decision: CONDITIONAL

    15 Mar 2018

  5. Decision due

    19 Mar 2018

  6. Grant issued

    19 Apr 2018

Application Details

Location
Cahir Business Park , Tipperary Road , Cahir
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
26 October 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 March 2018
Grant Date
19 April 2018
Permission Expires
18 April 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

84m
2260158CONDITIONAL5 Apr 2022

a) an extension to the rear of the existing warehouse, b) advertising signage to the front of the warehouse, c) internal layout changes and associated site works

Cahir Business Park , Cahir , Tipperary

134m
2460095CONDITIONAL12 Feb 2024

the base of existing extension to the existing fabrication workshop. Planning Permission is also being sought for (i) the completion of this extension, (ii) the construction of a new workshop (iii) the construction of the new paint shop and all other site development works

Cahir Abbey Industrial Estate , Cahir Abbey Lower and Cahir Abbey Upper , Cahir

136m
17600012CONDITIONAL11 Jan 2017

(i) the demolition of an existing link between 2 no. existing buildings in order to separate buildings and properties so that one building will remain wholly within the site of the planning application along with the making good of the facades on each building, (ii) the change of use of an existing building from a commercial use to an industrial use, (iii) raising the height of a portion of the existing building as described in ii above, (iv) to extend the building described in ii above to include ancillary support space, (v) to extend the building described in ii above to include plant equipment , (vi) the demolition of an existing site store, (vii) the erection of a new industrial unit (viii) the erection of a new site security hut, (ix) the erection of a new office block of which it's use is ancillary to the use of what will be the existing building described in ii above and the proposed building in vii above (x) site works to include new concrete yard around the building described in vii above, connection of foul sewer from building described in viii and ix above to an existing on-site pumping station and construction of on-site soakaways for surface water drainage (xi) and all associated signage throughout the development, 3 no. flagpoles and all other site development works and all other development works

Cahir Abbey Industrial Estate , Cahir Abbey Lower and Cahir Abbey Upper , Cahir

156m
20547CONDITIONAL3 Jun 2020

(i) outbuildings and sheds and (ii) an existing extension to the existing dwelling and all associated site works

Tipperary Road , Cahir , Co. Tipperary

173m
18600140CONDITIONAL7 Feb 2018

karting track development comprising the following (ii) a building comprising changing rooms and a W.C. (ii) a building for the storing of and general maintenance of the karts (iii) the installation of an over ground gas storage tank for the refuelling of the karts (iv) perimeter fencing (v) general signage on the building described in item 1 above (vi) general signage on the perimeter fencing (vii) the change of use of the land from industrial to a karting track (viii) hardstanding of the proposed areas for karting track (ix) general lighting (x) and all other site development works

Cahir Abbey Industrial Estate , Cahir Abbey Lower and Cahir Abbey Upper , Cahir

191m
2460556N/A10 Jul 2024

1No. single storey light industrial building incorporating 4No. units and 1No. warehouse building, car parking, storm water attenuation, and all associated site development works

Cahir Business Park Cahirabbey Lower , Cahir , Co. Tipperary

197m
2460587CONDITIONAL19 Jul 2024

1 no. single storey light industrial building incorporating 4 no. units and 1 no. warehouse building, car parking, storm water attenuation and all associated site development works

Cahir Business Park Cahirabbey Lower , Cahir , Co. Tipperary

221m
2360266CONDITIONAL24 Apr 2023

existing garden sheds, garage and all other unauthorised ancillary site development works

Tipperary Road , Cahir , Co. Tipperary

230m
2260660CONDITIONAL30 Nov 2022

the as constructed storage yard, boundary fencing and entrance including all associated site development works

Cahir Abbey Lower , Cahir , Co. Tipperary

231m
2360561CONDITIONAL27 Jul 2023

change of boundary treatment along part of the permitted boundary for which planning permission was granted under reference number 2260660 including all associated site development works

Cahir Abbey Lower , Cahir , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?