← Back to search

Nenagh Sewage Treatment Plant , Bulfin Road , Nenagh

CONDITIONAL

Planning application 17601274

Tipperary - Tipperary County Council

Proposed Development

install 35kW of ground mounted Solar PV Panels and all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Nov 2017

  2. Decision: CONDITIONAL

    22 Jan 2018

  3. Decision due

    24 Jan 2018

  4. Grant issued

    26 Feb 2018

Application Details

Location
Nenagh Sewage Treatment Plant , Bulfin Road , Nenagh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.1 ha

Timeline

Registration Date
21 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 January 2018
Grant Date
26 February 2018
Permission Expires
25 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
17601177N/A26 Oct 2017

35kW of ground mounted Solar Panels and all associated works

Bulfin Road , Nenagh , Co Tipperary

57m
2460961N/A8 Nov 2024

an upgrade to the existing Nenagh wastewater treatment plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh river to the immediate east of the site. The proposed development will comprise of proposed construction of: dual inlet pumping station; storm overflow chamber complete with overflow screens; 2 no. storm tanks including storm return pumps and tank cleaning systems; preliminary treatment stream comprising: fine screens complete with screenings handling systems; grit removal system complete with fat, oil and grease removal; grit handling system and fat, oil and grease storage tank; sludge process stream comprising: sludge import station complete with ancillary equipment; waste activated sludge buffer tank complete with ancillary equipment; picket fence thickeners complete with ancillary equipment; thickened sludge tanks complete with transfer pumps; sludge dewatering system complete with outdoor sludge skips; polymer make-up and dosing plant; return liquors pumping station; sequencing batch reactor tanks and blowers with distribution chamber; ferric sulphate dosing plant; tertiary treatment disk filter and wastewater pumping station; 2 no. odour control units with additional passive odour units; new ESB MV substation complete with outdoor generator and bunded fuel storage tanks; new control panel kiosks; upgrade of outfall headwall to Nenagh river; site lighting; flood defence walls to existing buildings and flood compensation areas; revised site entrance including lay-by area and palisade fencing and flow measurement and sampling chambers. Proposed re-purposing of existing structures as follows: conversion of existing picket fence thickener to a sludge import pumping station; conversion of existing final settlement tank to a final effluent buffer tank; conversion of existing final settlement tank to a surface water attenuation tank; diversion of existing northern catchment gravity main to proposed inlet pumping station and diversion of existing southern catchment rising main to proposed inlet pumping station. Demolition of the following: existing (northern and southern) oxidation ditches to be demolished and partially filled in; existing return activated sludge lifting wheel arrangement; existing waste activated system pumping station; existing belt thickeners and poly plant; existing inlet works; existing flow splitti

The existing Wastewater Treatment Plant , Bulfin Road , Nenagh in the townland of Nenagh North

57m
2461086CONDITIONAL12 Dec 2024

an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken

The existing Wastewater Treatment Plant , Bulfin Road , Nenagh in the townland of Nenagh North

144m
258CONDITIONAL22 Jan 2025

as-constructed single storey extension to the rear of Friary Ironworks

Unit 1 Riverstown Industrial Park , Old Birr Road , Nenagh Co. Tipperary

160m
2334CONDITIONAL13 Feb 2023

domestic extension at rear of dwelling and PERMISSION to erect new domestic extension to same dwelling

Old Birr Road , Nenagh , Co. Tipperary

175m
2560399CONDITIONAL9 May 2025

installation of a 24m monopole type telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works and pedestrian access steps on the grounds of Nenagh AFC

Nenagh AFC Bulfin Road , Nenagh North Nenagh , Co. Tipperary

176m
2587CONDITIONAL26 May 2025

a) construction of a commercial storage yard; b) retention of associated boundary walls within the curtilage of said yard; c) retention of placement of a portable cabin within the yard; and d.) PERMISSION for future construction of an open roofed structure within the yard

Bulfin Road , Nenagh , Co Tipperary

207m
2260569CONDITIONAL20 Oct 2022

the use of the first-floor area of its existing Club House as a; 1) sports exercise and gym work outs 2) reception area for club functions 3) meeting room and all ancillary site works

Nenagh Athletic Football Club Grounds , Old Birr Road , Nenagh Co Tipperary

216m
2460771N/A13 Sept 2024

the construction of a new commercial vehicle test centre with inspection pit, ancillary office, waiting area, toilets & connection to existing mains sewer & surface water services and all associated site works

Nenagh North , Nenagh , Co. Tipperary

220m
21822N/A8 Jun 2021

construction of dry goods store and associated site works

Old Birr Road , Nenagh , Co Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?