← Back to search

Derrycastle Demesne , Ballina , Killaloe

N/A

Planning application 18600748

Tipperary - Tipperary County Council

Proposed Development

to construct a dwelling house, waste water treatment system, percolation area, extend existing driveway to use existing entrance and all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Derrycastle Demesne , Ballina , Killaloe
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
13 June 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
18600850N/A4 Jul 2018

construction of a dwelling house, waste water treatment system, percolation area, extend existing driveway to use existing entrance and all ancillary site works. A Natura Impact Statement has been carried out on this site and a copy of same has been submitted with this application

Derry Demesne , Ballina , Killaloe

18m
19600249REFUSED20 Mar 2019

construction of a dwellinghouse, wastewater treatment system, percolation area, extend existing driveway to use existing entrance and all ancillary site works. A Natura Impact Statement has being carried out on this site and a copy of same is submitted with the application

Derry Demesne , Ballina , Co Tipperary

194m
17600177UNCONDITIONAL23 Feb 2017

1. Extension to dwelling consisting of dormer extension to rear, front porch, conversion of garage to living accommodation and associated internal alterations. 2. Amendments to development previously permitted (08/51/0783 refers) which will consist of the omission of the permitted slipway and the replacement and repositioning of the permitted concrete jetty with a wooden finger post jetty. Prev Ref No 11510430

Derry Demense , Derrycastle , Ballina

495m
17600820CONDITIONAL24 Jul 2017

the construction of a slatted agricultural livestock unit and all associated site works

Townlough , Ballina , Co. Tipperary

652m
17600430UNCONDITIONAL27 Apr 2017

single storey dwelling house, garage, new entrance gates, installation of waste water treatment system and percolation area, new well and associated site works - Prev Ref No 11510373

Derg Lodge , Derrycastle , Ballina

655m
201587CONDITIONAL23 Dec 2020

construction of a new dwelling house, using existing entrance onto public roadway, new septic tank and percolation area and all associated ancillary siteworks

Derry Demense , Ballina , Co. Tipperary

775m
19600419CONDITIONAL25 Apr 2019

to (1) retain 2 no. extensions to front and side of dwelling house as constructed, (2)retain garage as constructed, (3) retain garden shed as constructed, (4) retain patio and pond area with glazed screen as constructed and full planning permission to upgrade existing waste water treatment system along with ancillary site works

Coolbaun , Ballina , Co. Tipperary

813m
19600328N/A5 Apr 2019

to (1) retain 2 no. extensions to front and side of dwelling house as constructed, (2)retain garage as constructed, (3) retain garden shed as constructed, (4) retain patio and pond area with glazed screen as constructed and full planning permission to upgrade existing waste water treatment system along with ancillary site works

Coolbaun , Ballina , Co. Tipperary

813m
19600205N/A8 Mar 2019

to (1) retain 2 no. extensions to front and side of dwelling house as constructed, (2)retain garage as constructed, (3) retain garden shed as constructed, (4) retain patio and pond area as constructed and full planning permission to upgrade existing waste water treatment system along with ancillary site works

Coolbaun , Ballina , Co. Tipperary

827m
201031CONDITIONAL11 Sept 2020

1) Renovate and extend existing house to include granny flat. 2) Construct a garden shed to the rear of the property. 3) Upgrade waste water treatment system. 4) Upgrade existing entrance.

Laghtea , Portroe , Ballina

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?