← Back to search

Mt O'Meara , Newpark , Cashel

N/A

Planning application 18600751

Tipperary - Tipperary County Council

Proposed Development

of an existing 25m high telecommunications support structure (total height 26.8m including antennas) carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under Local authority Reference 12/95. The development will continue to form part of Meteor Mobile Communications Ltd existing and future telecommunications and broadband network.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Jun 2018

  2. Further information requested

    31 Jul 2018

  3. Application withdrawn

    8 Feb 2019

Application Details

Location
Mt O'Meara , Newpark , Cashel
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.009 ha

Timeline

Registration Date
13 June 2018
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
8 February 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

889m
2660564CONDITIONAL11 Jun 2026

a) new waste water treatment system and retention planning permission for b) changes to the front, rear and side elevations of the house, c) extensions to the house, d) two additional domestic sheds and e) associated site works

Marshalstown , Cashel , Co. Tipperary

1.0km
2360278CONDITIONAL27 Apr 2023

extension to existing dwelling and for permission for a new wastewater treatment system/percolation area and all associated works

Gortmakellis , Cashel , Co. Tipperary

1.1km
2260251CONDITIONAL25 May 2022

the amendment/re-configuration of the existing percolation area (attached to septic tank) and all associated works

Gortmakellis , Cashel , Co. Tipperary

1.1km
2460156CONDITIONAL4 Mar 2024

a 10 year planning permission for development consisting of the construction of a solar PV development on a c129 ha site consisting of: - The erection of solar panels on ground-mounted galvanised steel frames, string inverters attached to selected ground-mounted galvanised steel frames, 16 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; - 6 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; - the installation of underground cables, including cables under public roads; - 2 no. temporary construction compounds; and all associated ancillary development works. The operational lifespan of the solar PV development will be 40 years. A Natura Impact Statement will accompany the planning application

Boscabell Garranmore Newark , Fussough and Dually , County Tipperary

1.2km
18601231CONDITIONAL12 Oct 2018

a development at their dwelling to include the following: 1) Single Storey extension to front and side of existing dwelling. 2) Modification to dormer windows to front. 3) The development will include all drainage, site development and landscaping works

Garranmore , Cashel , Co. Tipperary

1.3km
2660351N/A23 Apr 2026

change of the red line boundary of the site granted and developed under planning permission reference no. 041315

Ballykelly , Cashel , Co. Tipperary

1.3km
2560804N/A16 Aug 2025

demolition of an existing dwelling, construction of replacement dwelling house with access off existing entrance, driveway, wastewater treatment system and percolation area and all associated site works

Newpark , Dualla , Co. Tipperary

1.3km
2560560N/A16 Jun 2025

the demolition of an existing dwelling to construction replacement dwelling house, with access off existing entrance, driveway, wastewater treatment system and percolation area and all associated site works

Newpark , Dualla , Co Tipperary

1.3km
2560590N/A20 Jun 2025

the demolition of an existing dwelling, construction of replacement dwelling house with access off existing entrance, driveway, wastewater treatment system and percolation area and all associated site works

Newpark , Dualla , Co. Tipperary

1.3km
2560822CONDITIONAL22 Aug 2025

the demolition of an existing dwelling to construction replacement dwelling house, with access off existing entrance, driveway, wastewater treatment system and percolation area, and all associated site works

Newpark , Dualla , Co Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?