← Back to search

Ballinteenoe , Boher , Ballina

CONDITIONAL

Planning application 18600998

Tipperary - Tipperary County Council

Proposed Development

an extension to existing house, install an effluent system and percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Aug 2018

  2. Decision: CONDITIONAL

    28 Sept 2018

  3. Decision due

    4 Oct 2018

  4. Grant issued

    2 Nov 2018

Application Details

Location
Ballinteenoe , Boher , Ballina
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.549 ha

Timeline

Registration Date
10 August 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 September 2018
Grant Date
2 November 2018
Permission Expires
1 November 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

24m
18600972N/A2 Aug 2018

an extension to existing house, install an effluent system and percolation area and all associated site works

Ballinteenoe , Boher , Ballina

98m
2660216N/A9 Mar 2026

an entrance road suitable for aa development of a cluster of 6 houses, including public lighting, footpath, watermains and ducting for other services and OUTLINE PERMISSION for 6 dwelling houses and an effluent treatment system for each house and all associated site works

Ballinteenoe , Boher , Co. Tipperary

98m
2660231N/A13 Mar 2026

the erection of an entrance road suitable for a development of a cluster of 6 houses, including public lighting, footpath, watermains and ducting for other services and for OUTLINE PERMISSION for six dwellinghouses and an effluent treatment system for each house and all associated site works

Ballinteenoe , Boher , Co. Tipperary

98m
19600864N/A7 Aug 2019

erect an entrance road, erect five dwellinghouses, individual effluent treatment system for each house, public lighting, footpath and all associated site works

Ballinteenoe , Boher , Co Tipperary

140m
19600773N/A11 Jul 2019

erect an entrance road, erect five dwellinghouses, individual effluent treatment system for each house, public lighting, footpath and all associated site works

Ballinteenoe , Boher , Co Tipperary

153m
211273CONDITIONAL27 Aug 2021

amendments to previously granted planning permission for the construction of Multi Use Games Area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary & incidental works (Previous Planning Ref. 21/242), the amendments required are an increase in the size of the proposed MUGA to 55x40m together with additional floodlighting

Boher National School , Ballinteenoe , Ballina Killaloe PO

153m
2260098CONDITIONAL1 Mar 2022

the demolition of 2 no. existing prefabricated classrooms and the construction of 2 no. single storey stand-alone buildings with covered walkways to accommodate a classroom and an early intervention room as well as associated ancillary accommodation. External works to include retaining structures, ramps and steps to resolve existing site levels as well as new boundary treatments to the south and west of the site, a new wastewater treatment plant and percolation area and all other associated site works required to facilitate the development.

Boher National School , Ballinteenoe Ballina Killaloe PO , Co. Tipperary

153m
21242CONDITIONAL26 Feb 2021

construction of Multi Use Games Area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works

Boher National School , Ballinteenoe , Ballina

174m
211339N/A8 Sept 2021

the demolition of 2 no. existing prefabricated classrooms and the construction of 2 no. single storey stand-alone buildings with covered walkways to accommodate a classroom and an early intervention room as well as associated ancillary accommodation, external works to include retaining structures, ramps and steps to resolve existing site levels as well as new boundary treatments to the south and west of the site, a new wastewater treatment plant and percolation area and all other associated site works required to facilitate the development

Boher National School , Ballinteenoe , Ballina/Killaloe PO Co. Tipperary

248m
2460622N/A1 Aug 2024

a dwelling house, garage, waste water system, entrance, driveway along with all ancillary site works

Ballintinoe , Ballina , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?