Knockannaveigh , New Inn , Cashel
CONDITIONALPlanning application 18601072
Tipperary - Tipperary County Council
Proposed Development
to construct milking parlour, collecting yard, drafting area, dairy, meal bin and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
31 Aug 2018
Decision: CONDITIONAL
18 Oct 2018
Decision due
25 Oct 2018
Grant issued
22 Nov 2018
Application Details
- Location
- Knockannaveigh , New Inn , Cashel
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 31 August 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 October 2018
- Grant Date
- 22 November 2018
- Permission Expires
- 21 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a) a new single storey detached dwelling, b) new detached garage, c) reconfiguration of existing vehicular entrance, d) new connection to existing public utilities, e) new waste-water treatment system and percolation area, f) all associated site works
Marlhill , New Inn , Cashel Co. Tipperary
(i) Extension constructed to Eastern Gable of Dwelling; (ii) roof-light to Front (South) of Dwelling and (iii) detached storage shed to East of Dwelling
Carrigeen (ED Killeenasteena) , New Inn , Cashel
installation of outdoor exercise equipment, refurbishment and upgrading of existing carpark and construction of walking track around existing sports field and all associated works
Loughkent East , New Inn Cashel , Co. Tipperary
provision of Floodlighting to (1) All weather pitch and (2) Perimeter Walkway
Rockwell Rovers GAA Grounds , Loughkent East New Inn , Cashel Co. Tipperary
provision of Floodlighting to (1) All weather pitch and (2) Perimeter Walkway
Rockwell Rovers GAA Grounds , Loughkent East New Inn , Cashel Co. Tipperary
1) a 2 storey extension to the rear of existing 2 storey house, 2) additional floor area to existing front porch and refurbishment of existing dwelling house including revised fenestration, 3) demolition of existing flat roof rear kitchen extension and existing separate garage structure, 4) proposed new septic tank and percolation area and 4) all associated site works to facilitate the development
Knockannaveigh , New Inn , Cashel County Tipperary
construction of a single-storey extension to the front and side of the existing school building, comprising a mainstream classroom with ancillary facilities, a resource room, store room, office, entrance lobby and corridor, associated site drainage and development works. This project will be carried out on a phased basis
New Inn , Cashel , Co. Tipperary
construction of a single-storey extension to the front and side of the existing school building, comprising a mainstream classroom with ancillary facilities, a resource room, store room, office, entrance lobby & corridor, associated site drainage and development works including re-positioning of the pedestrian entrance to the school. This project will be carried out on a phased basis
New Inn , Cashel , Co. Tipperary
a dwelling, garage, effluent treatment system, entrance and all associated site works
Knockannaveigh , Cashel , Co. Tipperary
1. Permission for construction of extensions to the rear and to the front of her dwelling and including all associated elevation amendments and site works, 2. Permission to construct a waste water treatment system, 3. Retention Permission for unauthorized extended elements to the dwelling
Carrigeen , Cashel , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?