Stereame , Nenagh , Co. Tipperary
N/APlanning application 18601094
Tipperary - Tipperary County Council
Proposed Development
the installation of 4 No. flagpoles. 1 No. 8.00m high and 3 No. 6.00m high
View the full application file on the council's planning portal →Application Details
- Location
- Stereame , Nenagh , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION CONSEQUENT
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 7 September 2018
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to erect 4 No. flagpoles; 1 No. 8.00m high and 3 No. 6.00m high along with ancillary site works
Stereame , Nenagh , Co. Tipperary
an increase in the amount of waste accepted annually from 24,750 tonnes to 30,000 tonnes. The proposed increase does not require the construction/provision of any new buildings/structures or any alteration to the current site layout, drainage and operations. The development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency. An Environmental Impact Statement has been submitted with the planning application
Solsborough , Nenagh , Co Tipperary
1) the alterations to existing site access at existing materials recovery facility, 2) associated and ancillary works
Springfort Cross , Solsborough Nenagh , Co. Tipperary
an increase in the amount of waste accepted annually from 24,750 tonnes to 30,000 tonnes. The proposed increase does not require the construction/provision of any new buildings/structures or any alteration to the current site layout, drainage and operations. The development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency. An Environmental Impact Statement has been submitted with the planning application
Solsborough , Nenagh , Co Tipperary
1) Alterations to existing site access onto local road L6059 at existing materials recovery facility. 2) Associated and ancillary works. The application site boundary encloses c. 0.6854 Ha.
Springfort Cross , Solsborough Nenagh , Co. Tipperary
the construction of proposed 4 no. extensions to existing car body repair shop, unit no. 1 with extensions to the rear and side to add additional floor space, unit no. 2 with extensions to the front to add office facilities with a rear extension to add a valeting area. The removal of 2 no. existing temporary offices and all additional site works
Limerick Rd Shesheraghkeale , Springfort Cross , Co. Tipperary
the hardstanding area for agricultural use in an existing agricultural field, (approximate area of hardstanding area - 0.058 Hectares)
Solsborough , Nenagh , Co. Tipperary
proposed 4 No. Extensions to existing car body repair shop, Unit No.1 with extensions to the rear and side to add additional floor space, Unit No.2 with extensions to the front to add office facilities with a rear extension to add a valeting area. The removal of 2 No. existing temporary offices and all additional site works
Limerick Rd Shesheraghkeale , Springfort Cross , Co. Tipperary
to construct a new steel fabrication warehouse with ancillary offies, signage, associated site works/landscaping and connecting to all public utility existing services
Stereame , Nenagh , Co Tipperary
(a) the partially constructed steel structure as proposed storage shed, (b) PLANNING PERMISSION to complete storage shed with connections to all existing services and all associated site works
Stereame , Nenagh , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?