← Back to search

43 Marine Village , Ballina , Co. Tipperary

CONDITIONAL

Planning application 18601396

Tipperary - Tipperary County Council

Proposed Development

modifications to the existing dwelling elevations

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Nov 2018

  2. Decision: CONDITIONAL

    24 Jan 2019

  3. Decision due

    29 Jan 2019

  4. Grant issued

    28 Feb 2019

Application Details

Location
43 Marine Village , Ballina , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.056 ha

Timeline

Registration Date
26 November 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 January 2019
Grant Date
28 February 2019
Permission Expires
27 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

76m
2460767N/A12 Sept 2024

extension and renovation of the existing dwelling

20 Marine Village , Ballina , Co. Tipperary

82m
2660653CONDITIONAL6 Jul 2026

the alterations and changes to extension that was previously granted under planning permission no. 08510986

22 Marine Village , Cullenagh Ballina , Co. Tipperary

82m
2460794CONDITIONAL19 Sept 2024

to extend and renovate existing dwelling

20 Marine Village , Ballina , Co. Tipperary

83m
18600225REFUSED23 Feb 2018

(i) modifications to the permitted window arrangement at ground floor level on the southern and western elevations; and (ii) provision of one number velux rooflight. Planning permission is sought to construct a timber screen set back from site boundary to facilitate boundary planting

38 Marine Village , Ballina , Co. Tipperary

83m
17600574CONDITIONAL23 May 2017

(i) Planning permission is sought for modifications to the existing ground floor window on the northern elevation. (ii) retention permission is sought for (a) a reduction in the height of the eaves overhang to the front (eastern) elevation; (b) retention and completion of modifications to the permitted window arrangement at ground floor level on the southern and western elevations; and (c) retention and completion of the provision of a new doorway on the southern elevation

38 Marine Village , Ballina , Co. Tipperary

83m
17600996CONDITIONAL8 Sept 2017

(a) modifications to the permitted window arrangement at ground floor level on the southern and western elevations; and (b) provision of 3 no. additional velux rooflights and planning permission is sought for the provision of a dormer roof to accommodate an internal lift

38 Marine Village , Ballina , Co. Tipperary

105m
18600429N/A10 Apr 2018

demolish existing industrial building and the construction of a two storey detached house complete with entrance, access road, ancillary services and the installation of a proprietary domestic pumping station going to main foul sewer and associated site works

Marine Village , Ballina , Co Tipperary

111m
17601024REFUSED19 Sept 2017

demolish existing industrial building and the construction of a two storey detached house complete with entrance, access road, ancillary services and the installation of a proprietary domestic pumping station going to main foul sewer and associated site works

Marine Village , Ballina , Co Tipperary

112m
211210CONDITIONAL16 Aug 2021

erection of precast concrete modules to form retaining structures of varying heights within the site, erection of new entrance piers and gates to the existing vehicular entrance and all associated site works. This application is accompanied by a Natura Impact Statement (NIS)

Marine Village , Ballina , Co. Tipperary

112m
2360907REFUSED15 Nov 2023

the demolition of the existing storage building & for the construction of two storey dwelling house incorporating boathouse storage, ancillary car port structure, landscaping, planting & siteworks including inlet, boardwalks & private moorings, connection to existing foul sewer infrastructure and all ancillary works. This application is accompanied by a Natura Impact Statement (NIS)

The Boathouse , Marine Village , Ballina

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?