1. Retain and complete the roof with blue black slates (as a replacement for an old, damaged, corrugated galvanised mild steel roof), 2. Retain a 100mm concrete block wall as a replacement for a damaged portion of the existing concrete block wall on the east south east elevation

View the full application file on the council's planning portal →

Application Details

Location
Church View , Nenagh , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council

Timeline

Registration Date
27 February 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
19600390CONDITIONAL17 Apr 2019

1. Retain and complete the roof with blue black slates (as a replacement for an old, damaged, corrugated galvanised mild steel roof), 2. Retain a 100mm concrete block wall complete with two doors and three windows on the east south east elevation

Church View , Nenagh , Co. Tipperary

23m
2616N/A4 Feb 2026

demolition and removal of existing derelict store and construction of a new three storey townhouse on vacated site and all associated site works

Church View , Nenagh , Co. Tipperary

27m
2573N/A2 May 2025

demolition and removal of existing derelict store and construction of new two-storey townhouse on vacated site complete with ancillary works and services

Church View , Nenagh , Co. Tipperary

28m
2621N/A10 Feb 2026

demolition and removal of existing derelict store and construction of a new three storey townhouse on vacated site and all associated site works

Church View , Nenagh , Co. Tipperary

55m
211717CONDITIONAL26 Nov 2021

new shop front to replace existing shop front including new windows and doors

Albany Home Decor , Summerhill , Nenagh

91m
17601379CONDITIONAL15 Dec 2017

for development comprising of the following works within the curtilage of Protected Structure No. 91; (a) Demolition of existing single storey structures to rear of existing dwelling at No. 32 Summerhill (b) Demolition of portion of single storey extension to side of No. 31 Summerhill to create new vehicular access to No. 32 and demolition of existing steel shed to rear of No. 31 to provide new garden/rear parking area to No. 32 Summerhill (c) Alterations to No. 32 Summerhill, including erection of part 2 Storey, part single storey extensions to side and rear of existing dwelling (d) All associated ancillary site works and services

No. 31/32 Summerhill , Nenagh , Co. Tipperary

110m
19600856N/A2 Aug 2019

retention and completion of partially completed development (Previous Planning Refs 11/52/0034 & 06/52/0059) to consist of the construction of a 3 storey building comprising 5 no. apartments, connection to necessary services, boundary treatments together with all associated site works

35 Summerhill , Nenagh , Co. Tipperary

113m
2260475CONDITIONAL12 Sept 2022

the construction of two dwelling houses and all ancillary site works

35 Summerhill , Nenagh , Co. Tipperary

115m
2424CONDITIONAL13 Feb 2024

1) change of use from offices to residential, 2) reconfiguration of internal rooms of both floors of the protected structure, 3) replacement of the non original aluminium windows with traditional timber sash windows on the front elevation of the building, 4) alteration and addition of window opes to the rear portion of the building and replacement of all windows, 5) additional of three rooflights to the rear portion of the building, 6) raising the flat roof of the rear portion of the building by 400 mm to allow for a shallow pitch, 7) removal of an existing 1970's toilet block with the courtyard of the existing building, 8) reinstatement of garden boundary wall, side access gate and all associated site works to facilitate the works on and under the lands - protected structure

15 Summerhill , Nenagh , Co. Tipperary

116m
18601465N/A14 Dec 2018

completion of partially completed development (previous planning ref. 11/52/0034) to consist of the construction of a 3 storey building comprising 5 no. apartments, connection to necessary services, boundary treatments together with all associated site works

35 Summerhill , Nenagh , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?