No. 1 Wilmor Cottages , Ballyrichard , Carrick-on-Suir
CONDITIONALPlanning application 19600176
Tipperary - Tipperary County Council
Proposed Development
construction of a two-storey extension to the side of the existing house, consisting of:- first floor games room, bathroom and storage area, ground floor kitchen/ livingroom, shower room, alterations to existing site entrance, demolition of existing side extension and part of wing wall and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
1 Mar 2019
Decision: CONDITIONAL
16 Apr 2019
Decision due
25 Apr 2019
Grant issued
21 May 2019
Application Details
- Location
- No. 1 Wilmor Cottages , Ballyrichard , Carrick-on-Suir
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 1 March 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 April 2019
- Grant Date
- 21 May 2019
- Permission Expires
- 20 May 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary (Tipperary County Council Reg Ref. 16600640, and An Bord Pleanála Reg Ref. PL92.248089) as amended by Tipperary County Council Reg Ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. inverters housed in 3 units, 1 no. 20kV substation, security fencing, new entrance onto public road, CCTV; underground cable and ducts including cable and ducts along the public road to the entrance of the existing Deerpark substation within the townland of Deerparklodge, Carrick-on-Suir, Co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kV substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary. A Natura Impact Statement (NIS) accompanies this application. Planning Permission is sought for a period of 10 years
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
the single storey, garden polytunnel in a total area of 35m2, as is erected on lands of 2.65 ha.
Ballyrichard , Carrick on Suir , Co Tipperary
a single storey garden polytunnel
Ballyrichard , Carrick On Suir , Co Tipperary
alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary (Tipperary County Council Reg Ref. 16600640, and An Bord Pleanála Reg Ref. PL92.248089) as amended by Tipperary County Council Reg Ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. inverters housed in 3 units, 1 no. 20kV substation, security fencing, new entrance onto public road, CCTV; underground cable and ducts including cable and ducts along the public road to the entrance of the existing Deerpark substation within the townland of Deerparklodge, Carrick-on-Suir, Co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kV substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary. A Natura Impact Statement (NIS) accompanies this application. Planning Permission is sought for a period of 10 years
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
the provision of three battery storage containers which are required for the operation of the previously granted solar farm (Planning Ref 16600640). This planning application also includes an alteration to the approved planning boundary and the operational permission of the solar farm to be increased from 25 to 30 years
Ballynagrane and Deerparklodge , Carrick-on-Suir , Co. Tipperary
alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary (Tipperary County Council Reg Ref. 16600640, and An Bord Pleanála Reg Ref. PL92.248089) as amended by Tipperary County Council Reg Ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. inverters housed in 3 units, 1 no. 20kV substation, security fencing, new entrance onto public road, CCTV; underground cable and ducts including cable and ducts along the public road to the entrance of the existing Deerpark substation within the townland of Deerparklodge, Carrick-on-Suir, Co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kV substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary. A Natura Impact Statement (NIS) accompanies this application. Planning Permission is sought for a period of 10 years
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
the construction of an American stable barn incorporating stables and associated store and utility rooms, separate lunging ring, walker, and haybarn buildings, loading ramp, manure pit and all associated site development works including effluent treatment plant and percolation area, effluent tank, site fencing, farm roads and yard, and the relocation of the existing site entrance on the Ballyrichard Road and associated boundary set back incorporating the demolition of derelict haybarn and silage pit
Ballyrichard , Carrick-on-Suir , Co. Tipperary
as constructed log cabin and the dog house, including all associated site development works
Ballinagrana , Carrick-on-suir , Co.Tipperary
detached garage and for change of use of part of the detached garage to workshop for use by our son Conor Whelan as a part time hurley making workshop
Ballynagrana , Carrick-on-Suir , Co. Tipperary
a single storey extension, bedroom and shower to the side of my dwelling house and all associated site works
Ballynagrana , Carrick-on-Suir , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?