Bohercrowe , Emly Road , Tipperary Town
CONDITIONALPlanning application 19600798
Tipperary - Tipperary County Council
Proposed Development
(1) Retention of existing domestic garage (2) Retention of rear extension (3) Retention of two shower rooms (4) Retention of garage conversion (5) Retention of open porch door unit (6) Retention of front window replacing a patio door unit
View the full application file on the council's planning portal →Application Timeline
Application received
17 Jul 2019
Further information requested
4 Sept 2019
Further information received
25 Mar 2020
Decision: CONDITIONAL
5 Jun 2020
Decision due
16 Jun 2020
Grant issued
9 Jul 2020
Application Details
- Location
- Bohercrowe , Emly Road , Tipperary Town
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 17 July 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 June 2020
- Grant Date
- 9 July 2020
- Permission Expires
- 8 July 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) the first floor living accommodation of the dwelling, and 2) to retain the enclosing of an open porch, to form ground floor living accommodation, and for PLANNING PERMISSION to 3) permanently close a site entrance to the property, including all associated site development works
Bohercrowe , Emly Road , Tipperary Town
Retention Permission for the following: Removal of window from west elevation of house and insertion of window in east elevation; Insertion of roof window in west facing roof slope; Construction of detached garage; Construction of boiler shed and oil tank; Erection of timber play house; Relocation of septic tank from location shown on drawings associated with planning ref. P.3.3251 and provision of puraflo treatment units; and all associated site and ancillary works.
Roseboro , Tipperary , Co. Tipperary
removal of window from west elevation of house and insertion of window in east elevation; insertion of roof window in west facing roof slope; construction of detached garage; construction of boiler shed and oil tank; erection of timber play house; relocation of septic tank from location shown on drawings associated with planning ref. P.3.3251 and provision of puraflo treatment units; and all associated site and ancillary works
Roseboro , Tipperary , Co. Tipperary
(1) extend the ridge line of existing roof and construct a first floor extension within the attic space (2) carry out alterations to the existing entrance
Whitethorn Cottage , Roesborough , Emly Road
1) Alterations to existing dwelling. 2) Erection of two storey extension to the rear of existing dwelling. 3) Installation of Effluent Treatment System and soil polishing filter. 4) Erection of double garage. 5) Construction of new entrance to replace the existing entrance
Roesborough Cottage Roesborough , Emly Road , Tipperary
1) Alterations to existing dwelling 2) Erection of two storey extension to the rear of existing dwelling 3) Installation of Effluent Treatment System and soil polishing filter 4) Erection of double garage 5) Construction of new entrance to replace the existing entrance
Roesborough Cottage Roesborough , Emly Road , Tipperary
the extension of the operational lifespan of a solar pv development permitted by Tipperary County Council under Planning. Ref. 16600359 from 25 no. years as permitted (by reason of condition no. 3 of permission Planning Ref. 16600359) to 40 no. years
Ballynilard , Tipperary , Co. Tipperary
alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by Tipperary County Council Reg. Ref. 16600359) with a single storey 20kV substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to Ballynilard Stream; and b) Permission to increase the operational period of the solar farm from 25 years to 40 years
Ballynilard , Tipperary , Co. Tipperary
modifications and extension to dwelling
Roesborough , Emly Road , Tipperary
Modifications and extension to dwelling and associates site works.
Roesborough , Emly Road , Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?