← Back to search

Lackenavea (Egremont) , Birdhill , Co Tipperary

N/A

Planning application 19600888

Tipperary - Tipperary County Council

Proposed Development

a single storey dwellinghouse, septic tank & percolation area, site entrance, together with associated siteworks

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Aug 2019

  2. Application withdrawn

    30 Sept 2019

Application Details

Location
Lackenavea (Egremont) , Birdhill , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.231 ha
Floor Area
142.2 sq m
Residential Units
1

Timeline

Registration Date
13 August 2019Other applications received that week
Status
WITHDRAWN
Decision
N/A
Withdrawn
30 September 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

100m
17601420CONDITIONAL21 Dec 2017

an extension to rear of the existing industrial warehouse building and all associated site works

Unit 28 Shannonside Business Park , Lackenavea , Birdhill

138m
2260435CONDITIONAL24 Aug 2022

the replacement of car parking and associated works which are arising from the R494 upgrade project and the associated Compulsory Purchase Order for the existing overflow car park

Shannonside Business Park , Birdhill , Co. Tipperary

139m
2260424N/A18 Aug 2022

replacement car parking and associated works. These works are arising from the R494 upgrade project and the associated Compulsory Purchase Order for the existing overflow car park

Shannonside Business Park , Lackenavea Birdhill , Co. Tipperary

196m
21744CONDITIONAL25 May 2021

development of existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd. comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (45sp.m) at ground floor level to the rear of the building (iii) provision of pergola feature to primary building entrance off the western elevation, new access door to northern elevation, new window opes to northern and eastern elevations and new signage to northern and western elevations; and (iv)all associated ancillary works necessary to facilitate the developoment

Unit 3 , Shannonside Business Park , Birdhill

202m
21685N/A17 May 2021

development at existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (45sq.m) at ground floor level to the rear of the building (iii) provision of pergola feature to primary building entrance off the western elevation, new access door to northern elevation, new window opes to northern and eastern elevations and new signage to northern and western elevations and (iv) all associated ancillary works necessary to facilitate the development

Unit 3 Shannonside Business Park , Birdhill , Co. Tipperary

219m
2240N/A20 Jan 2022

partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to the rear and side elevations, new window opes on the side elevations of the first floor level, removal of roller shutter doors on the rear elevation, new signage to the front elevation with lighting and all associated site works

Unit 4 Shannonside Business Park , Birdhill , Co Tipperary

222m
2260CONDITIONAL26 Jan 2022

previous administration and distribution facility consisting of partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to the rear and side elevations, new window opes on the site elevations of the first floor level, removal of roller shutter doors on the rear elevation, new signage to the front elevation with lighting and all associated site works

Unit 4 Shannonside Business Park , Birdhill , Co. Tipperary

705m
18600599CONDITIONAL14 May 2018

the construction of an extension to farmyard consisting of a cattle shed

Lacken , Birdhill , Co Tipperary

770m
2360268CONDITIONAL25 Apr 2023

a single storey dwelling house, a new single storey garage, new hard and soft landscaping, provision of a new foul water treatment system and percolation area, new site entrance from N7 roadway, connection to existing services, boundary walls and all ancillary site works

Main Street , Birdhill , Co.Tipperary

770m
2460028CONDITIONAL17 Jan 2024

change of house design and re-location of entrance, which were previously granted under PPRR 2360268

Main St. , Birdhill , Co. Tipperary

The submission window has closed

Observations on this application closed on Monday 16 September 2019, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?