← Back to search

Ballynagrana , Carrick on Suir , Co. Tipperary

CONDITIONAL

Planning application 19600907

Tipperary - Tipperary County Council

Proposed Development

construction of a livestock shed containing an underground slatted tank, feed passage and associated site works with the development

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Aug 2019

  2. Decision: CONDITIONAL

    3 Oct 2019

  3. Decision due

    10 Oct 2019

  4. Grant issued

    7 Nov 2019

Application Details

Location
Ballynagrana , Carrick on Suir , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
16 August 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 October 2019
Grant Date
7 November 2019
Permission Expires
6 November 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

495m
17600826N/A25 Jul 2017

development consisting of a solar photovoltaic (PV) installation with a maximum installed capacity of 3.6MW, comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameras around the solar PV arrays; underground cabling and ducts within the arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha

Deerpark , Carrick-on-Suir , Co. Tipperary

507m
19601148CONDITIONAL17 Oct 2019

a single storey extension, bedroom and shower to the side of my dwelling house and all associated site works

Ballynagrana , Carrick-on-Suir , Co. Tipperary

513m
19601018N/A16 Sept 2019

a single storey extension, bedroom and shower to the side of my dwelling house and all associated site works

Ballynagrana , Carrick-on-Suir , Co. Tipperary

549m
211304CONDITIONAL1 Sept 2021

detached garage and for change of use of part of the detached garage to workshop for use by our son Conor Whelan as a part time hurley making workshop

Ballynagrana , Carrick-on-Suir , Co. Tipperary

587m
17600928CONDITIONAL23 Aug 2017

development consisting of a solar photovoltaic (PV) installation with a maximum installed capacity of 3.6MW, comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameras around the solar PV arrays; underground cabling and ducts within the arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha

Deerpark , Carrick-on-Suir , Co. Tipperary

587m
211819CONDITIONAL15 Dec 2021

alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was originally granted for a solar photovoltaic installation comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameeras around the solar PV arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha. Permission is now sought for the following: optimised solar pv panel configuration to comprise up to 23,581 m" of solar panels on ground mounted frames; increase in height to the permitted solar panels from 2.72m to 2.82m and; Permission for an operational period of the solar farm from 35 years. Planning Permission is sought for a period of 10 years

Deerpark , Carrick-on-Suir , Co. Tipperary

595m
2360952CONDITIONAL30 Nov 2023

as constructed log cabin and the dog house, including all associated site development works

Ballinagrana , Carrick-on-suir , Co.Tipperary

624m
211312N/A1 Sept 2021

alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was originally granted for a solar photovoltaic installation comprising arrays of approximately 13,770 solar PV panels on ground mounnted frames no taller than 2.8m;

Deerpark , Carrick-on-Suir , Co. Tipperary

870m
19600120CONDITIONAL15 Feb 2019

the provision of three battery storage containers which are required for the operation of the previously granted solar farm (Planning Ref 16600640). This planning application also includes an alteration to the approved planning boundary and the operational permission of the solar farm to be increased from 25 to 30 years

Ballynagrane and Deerparklodge , Carrick-on-Suir , Co. Tipperary

911m
211129N/A30 Jul 2021

alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary (Tipperary County Council Reg Ref. 16600640, and An Bord Pleanála Reg Ref. PL92.248089) as amended by Tipperary County Council Reg Ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. inverters housed in 3 units, 1 no. 20kV substation, security fencing, new entrance onto public road, CCTV; underground cable and ducts including cable and ducts along the public road to the entrance of the existing Deerpark substation within the townland of Deerparklodge, Carrick-on-Suir, Co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kV substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary. A Natura Impact Statement (NIS) accompanies this application. Planning Permission is sought for a period of 10 years

Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?