Longorchard , Templetuohy , Co. Tipperary
CONDITIONALPlanning application 19600984
Tipperary - Tipperary County Council
Proposed Development
to construct a single storey replacement detached dwelling house, entrance, boundary walls, connection to existing public foul sewer, including all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
5 Sept 2019
Decision: CONDITIONAL
29 Oct 2019
Decision due
30 Oct 2019
Grant issued
3 Dec 2019
Application Details
- Location
- Longorchard , Templetuohy , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.297 ha
- Floor Area
- 169.61 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 5 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 October 2019
- Grant Date
- 3 December 2019
- Permission Expires
- 2 December 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
alterations and construction of a single storey extension to dwelling house, construction of a garage including all associated site works
Longorchard , Templetouhy
existing changes to roof height, alterations to east elevation and attic conversion
Lisdaleen & Drummin , Templetuohy , Co. Tipperary
a) a new Astro-turf playing pitch with perimeter fencing and netting above, floodlights, goals and access gates. b) a new ball wall with netting to the top c) relocation of existing carpark and redesign of layout of existing footpath and driveway and all associated site works
Templetuophy , Co. Tipperary , E41FX03
of a bar and lounge extension and toilet facilities and external store, all located to the side and rear of the existing public house known as The Temple Bar and all ancillary works
The Temple Bar , Main Street , Templetuohy
for an existing bar and lounge extension, toilet facilities and external store, all located to the side and rear of the existing public house known as The Temple Bar and all ancillary works
The Temple Bar , Main Street , Templetuohy
rear extension to house and for existing garden shed to the rear of site
5 Templetuohy , Thurles , Co. Tipperary
change of use of premises previously used as a doctors surgery and associated offices to use as a staff training facility and associated offices and PERMISSION for RETENTION of gravelled parking area and PERMISSION to extend and complete same, PERMISSION for RETENTION of demolition of old entrance and PERMISSION to build a new recessed entrance and carry out all associated works
Lisdalleen Drummin and Longorchard , Templetuohy , Co. Tipperary
change of use from medical centre health care use to domestic residential use
Templetuohy Medical Centre , Thurles , Co. Tipperary E41F4E3
a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report will be submitted with this application.
Derryville , Co. Tipperary , Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?