Junction 8 of the M8 Motorway , Wallers Lot , Cashel
N/APlanning application 19601073
Tipperary - Tipperary County Council
Proposed Development
the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
View the full application file on the council's planning portal →Application Timeline
Application received
27 Sept 2019
Further information requested
19 Nov 2019
Application withdrawn
21 Jul 2020
Application Details
- Location
- Junction 8 of the M8 Motorway , Wallers Lot , Cashel
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 27 September 2019
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 21 July 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the provision of an internally illuminated two-sided totem sign with a total height of 7 metres including a base pole of 3.9 metres and signage with a maximum height of 3.087 metres at the off-line motorway services area
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
development consisting of the (I) demolition of existing substation, and (ii) construction of a new substation (iii) all associated site and development works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway
Wallers Lot , Cashel , Co Tipperary
the construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13 no new car parking spaces and Permission for Retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the Topaz Motorway Services Area, Junction 8 on the M8 Motorway
Wallers Lot , Cashel , Co Tipperary
(i) modifications to the existing internal floor layout at ground floor level, totaling 35sqm in area, to incorporate a new food offer, (ii) the creation of new staff room at first floor level (iii) new internally illuminated signage on the northeast and northwest elevations and (iv) all other associated site development works
Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
a change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 12.5sqm and is ancillary to the primary retail use
Circle K Cashel Service Station , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
the development will consist of (i) Demolition of existing substation, and (ii) Construction of a new substation, and (iii) all associated site works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Wallers Lot Cashel
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
Circle K Motorway Service Area , Junction 8 M8 Motorway , Wallers Lot Cashel
a High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit, (ii) Associated revisions to existing car parking area, (iii) Installation of electric vehicle power units, (iv) Construction of a new substation, (v) Erection of illuminated signage, (vi) All associated lighting, infrastructure, site and development works
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
development will consist of the replacement of an existing 24 metre lattice tower and existing 21 metre wooden pole for a 30 metre high free standing lattice communications structure carrying antennae and communication dishes, with associated equipment to form part of ESB's communication system and to share with other licensed operators within an existing compound
Cashel ESB Station , Waller's Lot , Cashel
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?