← Back to search

Rathbrit , Kilconnell , Fethard

UNCONDITIONAL

Planning application 19601133

Tipperary - Tipperary County Council

Proposed Development

construction of a new dwelling and detached garage, new entrance, treatment unit and ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Oct 2019

  2. Decision: UNCONDITIONAL

    3 Dec 2019

  3. Decision due

    5 Dec 2019

Application Details

Location
Rathbrit , Kilconnell , Fethard
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Tipperary County Council

Timeline

Registration Date
11 October 2019
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
3 December 2019
Permission Expires
9 December 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

569m
2260299CONDITIONAL17 Jun 2022

the as constructed steel shed and permission to demolish existing rear single storey extension and to construct a new larger single storey extension to the rear of dwelling house with all with associated site works

Rathbrit , Fethard , Co Tipperary

866m
2260626CONDITIONAL17 Nov 2022

a). single-storey extensions to side and rear of existing dwelling, b). demolish room to rear of dwelling, c). refurbish and alter existing dwelling and all associated works

Coolmoyne , Fethard , Co. Tipperary

954m
20793CONDITIONAL20 Jul 2020

construction of a new two-storey house, garage, new site entrance, new agricultural entrance, connection to mains water supply, wastewater treatment system, percolation area and all associated works

Coolmoyne , Fethard , Co. Tipperary

963m
20732N/A9 Jul 2020

construction of a new two-storey house, garage, new site entrance, new agricultural entrance, connection to mains water supply, wastewater treatment system, percolation area and all associated works

Coolmoyne , Fethard , Co. Tipperary

1.1km
2461125N/A19 Dec 2024

(a) demolition of mid-20th century 2-storey extension on north facade & single storey extensions on west facade of the two-storey with attic over basement dwelling (main house), conservatory ruins on south facade and courtyard outbuildings (b) construction of a new single storey extension & glass link to the west (rear) and a new single storey extension to the north (side) of main house (c) works to the main house including works to facades on all elevations including removal of existing cementitious render & full lime re-render, refurbishment of the limestone front door surround, cills, minor repairs & refurbishment of entrance railings, refurbishment of existing doors & windows to include slimline double glazing. The building will be altered internally on all levels including modifications to existing partition walls, provision of new lightweight internal stud partitions, partial opening up of existing external walls to rear, 3no. new window opens & repositioning of the stairwell windows on north facade, new staircase between basement and ground floor, lowering of windows & French doors to rear study, 3no. new conservation roof lights & the enlargement of 3no. existing roof lights, alterations to existing doors and windows; general restoration work including the repair of existing ceilings & plasterwork (d) landscaping works (e) all ancillary and associated site development works including drainage & services. The building is a Protected Structure (Ref. No. S082)

Ardsallagh House , Ardsallagh Estate , Fethard Co. Tipperary

1.1km
2660511CONDITIONAL26 May 2026

an existing extension to an existing dwelling as well as PLANNING PERMISSION for a ground mounted solar panel installation and all associated site development works

Knockbrit , Fethard , Co. Tipperary

1.2km
2560002CONDITIONAL2 Jan 2025

(a) demolition of mid 20th century 2-storey extension on north facade & single storey extensions on west facade of the two-storey with attic over basement dwelling (main house), conservatory ruins on south facade and courtyard outbuildings. (b) construction of a new single storey extension & glass link to the west (rear) and a new single storey extension to the north (side) of main house. (c) works to the main house including works to facades on all elevations including removal of existing cementitious render & full lime re-render, refurbishment of the limestone front door surround, cills, minor repairs & refurbishment of entrance railings, refurbishment of existing doors & windows to include slimline double glazing. The building will be altered internally on all levels including modifications to existing partition walls, provision of new lightweight internal stud partitions, partial opening up of existing external walls to rear, 3no. new window opes & repositioning of the stairwell windows on north facade, new staircase between basement and ground floor, lowering of windows & french doors to rear study, 3no. new conservation rooflights & the enlargement of 3no. existing rooflights, alterations to existing doors and windows; general restoration work including the repair of existing ceilings & plasterwork, (d) landscaping works (e) a new waste water treatment system and soil polishing filter and all ancillary and associated site development works. The building is a Protected Structure (Ref. No. S082)

Ardsallagh House , Ardsallagh Estate , Fethard Co. Tipperary

1.2km
2560934N/A18 Sept 2025

(a) Deconstruction of the main road entrance gates, piers, railings and walls (partial) for access during construction of works to main house as per planning permission Ref. 2560002 (b) Reconstruction of gates, piers, railings and walls post completion of said works incorporating a new configuration to accommodate safer vehicular access. The building is a Protected Structure (Ref. No. S082)

Ardsallagh House , Ardsallagh Estate , Fethard Co. Tipperary

1.3km
201066UNCONDITIONAL21 Sept 2020

to replace the roofs on the existing cubicle shed, existing loose shed and existing dry store; and planning permission for the construction of a new livestock shed and all associated site works, (previous reference number 15600246)

Ballyvadin , Fethard , Co. Tipperary

1.3km
2538CONDITIONAL24 Mar 2025

1) the deconstruction of an existing derelict dwelling; 2) the construction of a dwelling house, detached domestic garage, site entrance, septic tank and percolation area, and including all associated site development works

Coolmoyne , Fethard , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?